Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 2,85,200Document Cost
₹ 10,000Tender Fee
Refer Documents
Summary
Improvement To Simanbadi-budaguda Road (odr) From Ch-14/430km
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EICCL_105083_2Bid Award Id
ViewTender No
CCE_R and B_PLB_03 of 2024_25Tender Authority
Works Department ViewPurchaser Address
-Website
http://https://www.worksodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2 and as per clause -305 of MoRT&H Specification for Road & Bridge works (5th Revision) including all cost i.e cost of all materials, all labour, all T&P etc complete and as per direction of the Engineer - in - Charge.
813.56
29125
35.8
... More
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per approved Drawing & Technical Specifications and as per Clause -305 of MoRT&H Specifications for Road & Bridge works (5th Revision). including all cost i.e cost of all materials, all labour, all T&P, etc complete in all respect and as per direction of the Engineer- in- charge.
661.73
134761
203.65
... More
Construction of Granular sub-base by providing Grading-VI material as per table 400-2, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per Clause 401 of MoRT&H Specifications for Road & Bridge works (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
161.18
331242
2055.11
... More
Construction of dry lean cement concrete sub-base over a prepare sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25mm, aggregate cement ratio not to exceed 15.:1, aggregate gradation after blending to be as per Table 600.1, cement content not to be less than 150kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver and compacting with vibratory roller, finishing and curing as per clause 601 of MOSRT&H Specifications for Road & Bridges work (4th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, T&P etc complete.
107.45
442580
4118.94
... More
Construction of un-reinforced, dowel jointed cement concrete pavement by semi mechanised method over a prepared sub-base with 43 grade cement @ 400kg per cum, coarse and fine aggregate conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, as approved, curing compound, finishing to lines and grades as per drawing and as per clause 602 of MOSRT&H Specifications for Road & Bridges work (4th Revision). including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete.
861.14
6719974
7803.58
... More
Retaining Wall
Earth work in excavation in Soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and techinical specification including setting out dressing of section to correct line level grade & camber and loading into tippers transporting to embankment site within all lifts and lead upto 1000 mtr and utilising the surplus earth locally for road work whenevre required, backfilling the excavation earth to the extent required complete Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per section 300 & all relevant sections/ clauses of Specification for road & bridge work of MoRT &H (5th Revision) & direction of Engineer in charge.
702
52446
74.71
... More
Sand filling in Road work & foundation of structure as per approved Drawing & Technical Specifications and as per Section - 2100 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, T&P etc complete.
81
114990
1419.64
... More
Plain cement concrete M-15 in foundation with crushed stone aggregates 20mm size and mixed , placed in foundation and compacted as per section 900, 1500, 1700, 2100, 2900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th or latest Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
81
458508
5660.6
... More
Reinforced cement concrete M-25 grade compacted by vibration including curing for 14 days as per Section 900, 1500,1700,2100 & all relevant sections/ clauses of MORT&H specifcation and cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect but excluding the cost and conveyance of M.S Rod or TOR steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending ,bindind and tying the grills and placing in proper position and as per specification and direction of the Engineer- in- charge.
-
-
-
... More
Foundation
201.6
1399317
6941.06
... More
Sub Structure
218.4
2389239
10939.74
... More
Supplying, fitting and placing uncoated HYSD bar reinforcement of primary steel producers such as SAIL/TATA/RINL/JINDAL STEEL/ SHYAM STEELetc. including cutting, bending and binding as per drawing and technical specification as per section 1600, section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P etc complete in all respect and as per direction of the Engineer- in- charge.
42
3600261
85720.5
... More
Providing laying of filter media with granular materials/ stone crushed aggregates of 45mm size or as satisfying the requirements laid down in section 900 and 2500 of MoRT&H specification to a thickness not less than 600mm with small size towards the soil and bigger towards the wall and provided over the entire surface behind abutment wing walls return walls to the full height compacted to a firm condition complete as per drawing and technical specification & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
374.4
974256
2602.18
... More
Providing weep holes in brick masonry / plain or RCC /abutment / wing wall , retaining wall/ toe wall with 100mm dia AC pipe extending through the full width of structure with slope of 1V : 20H towards draining face complete as per drawing and technical specification as per Clause - 2706 of MoRT&H Specition for Road & Bridge works (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
192
17829
92.86
... More
Concrete Drain
Earth work in excavation in Soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and techinical specification including setting out dressing of section to correct line level grade & camber and loading into tippers transporting to embankment site within all lifts and lead upto 1000 mtr and utilising the surplus earth locally for road work whenevre required, backfilling the excavation earth to the extent required complete Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per section 300 & all relevant sections/ clauses of Specification for road & bridge work of MoRT &H (5th Revision) & direction of Engineer in charge.
907.2
67776
74.71
... More
Sand filling in Road work & foundation of structure as per approved Drawing & Technical Specifications and as per Section - 2100 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, T&P etc complete.
90.72
128789
1419.64
... More
Plain cement concrete M-15 in foundation with crushed stone aggregates 20mm size and mixed , placed in foundation and compacted as per section 900, 1500, 1700, 2100, 2900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th or latest Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
90.72
513529
5660.6
... More
Reinforced cement concrete M-20 grade compacted by vibration including curing for 14 days as per Section 900, 1500,1700,2100 & all relevant sections/ clauses of MORT&H specifcation and cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect but excluding the cost and conveyance of M.S Rod or TOR steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending ,bindind and tying the grills and placing in proper position and as per specification and direction of the Engineer- in- charge.
-
-
-
... More
Drain Base
116.64
763537
6546.1
... More
Drain Wall
155.52
1639911
10544.7
... More
Cover Slab
116.64
991743
8502.6
... More
Supplying, fitting and placing uncoated HYSD bar reinforcement of primary steel producers such as SAIL/TATA/RINL/JINDAL STEEL/ SHYAM STEELetc. including cutting, bending and binding as per drawing and technical specification as per section 1600, section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P etc complete in all respect and as per direction of the Engineer- in- charge.
38.88
3332813
85720.5
... More
Providing weep holes in brick masonry / plain or RCC /abutment / wing wall , retaining wall/ toe wall with 100mm dia AC pipe extending through the full width of structure with slope of 1V : 20H towards draining face complete as per drawing and technical specification as per Clause - 2706 of MoRT&H Specition for Road & Bridge works (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
86.4
8023
92.86
... More
Box Cell Culvert
Earth work in excavation in Soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and techinical specification including setting out dressing of section to correct line level grade & camber and loading into tippers transporting to embankment site within all lifts and lead upto 1000 mtr and utilising the surplus earth locally for road work whenevre required, backfilling the excavation earth to the extent required complete Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per section 300 & all relevant sections/ clauses of Specification for road & bridge work of MoRT &H (5th Revision) & direction of Engineer in charge.
297.3
22211
74.71
... More
Sand filling in Road work & foundation of structure as per approved Drawing & Technical Specifications and as per Section - 2100 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, T&P etc complete.
208.45
295923
1419.64
... More
Plain cement concrete M-15 with crushed stone aggregates 20mm size and mixed , placed in foundation and compacted as per section 900, 1500, 1700, 2100, 2900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th or latest Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
-
-
-
... More
Foundation
45.54
257783
5660.6
... More
Sub Structure
151.67
877253
5783.96
... More
Plain cement concrete M-20 Grade in Foundation of CD work using 40mm to 10mm size crushed stone aggregates mixed by concrete mixer, laying in layers and compacting by vibrator & all leads and lifts including frame works etc as per approved Drawing & Technical Specifications and as per Section -1500, 1700, 2100 & 2200 of MoSRT&H Specifications for Road & Bridge works (Latest Revision). including cost, conveyance, royality & other taxes of materials, cost of labour, T&P etc complete.
19.2
119610
6229.71
... More
Reinforced cement concrete M-25 grade compacted by vibration including curing for 14 days as per Section 900, 1500,1700,2100 & all relevant sections/ clauses of MORT&H specifcation and cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect but excluding the cost and conveyance of M.S Rod or TOR steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending ,bindind and tying the grills and placing in proper position and as per specification and direction of the Engineer- in- charge.
-
-
-
... More
Foundation (Raft)
40.8
283195
6941.06
... More
Sub Structure (Rib & Hunch)
48.45
530030
10939.74
... More
Super Structure (Deck Slab)
37.2
330989
8897.57
... More
Reinforced cement concrete M-30 (Wearing coat) compacted by vibration including curing for 14 days as per Section No.900,1500,1600,1700, 2300, 2700 & all relevant sections/ clauses of MORT&H specifcation and cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect including the cost and conveyance of M.S Rod or TOR steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending ,bindind and tying the grills and placing in proper position and as per specification and direction of the Engineer- in- charge.
4.65
62071
13348.64
... More
Providing reinforced cement concrete crash barrier of M40 Grade Concrete at the edges of road, approaches to bridge structures and median with HYSD reinforcement conforming to IRC :21 and dowel bars 25mm dia , 450 mm long at expansion joints filled with pre-moulded asphalt filler board keyed to the structure and installed as per design given in the MOST Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per approved drawing and technical specification as per section 900,1500,170, 2300, 2700 & all relevant sections/ clauses of MORT&H Specification for road & bridge works (5th or latest Revision) & as per direction of Engineer in charge.
12.4
56853
4584.97
... More
Supplying, fitting and placing uncoated HYSD bar reinforcement of primary steel producers such as SAIL/TATA/RINL/JINDAL STEEL/ SHYAM STEELetc. including cutting, bending and binding as per drawing and technical specification as per section 1600, section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P etc complete in all respect and as per direction of the Engineer- in- charge.
13.76
1179514
85720.5
... More
Providing weep holes in brick masonry / plain or RCC /abutment / wing wall , retaining wall/ toe wall with 100mm dia AC pipe extending through the full width of structure with slope of 1V : 20H towards draining face complete as per drawing and technical specification as per Clause - 2706 of MoRT&H Specition for Road & Bridge works (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
36
3342
92.86
... More
Providing laying of filter media with granular materials/ stone crushed aggregates of 45mm size or as satisfying the requirements laid down in section 900 and 2500 of MoRT&H specification to a thickness not less than 600mm with small size towards the soil and bigger towards the wall and provided over the entire surface behind abutment wing walls return walls to the full height compacted to a firm condition complete as per drawing and technical specification & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
64.8
168621
2602.18
... More
Rough stone dry packing in aprons revetments stone pitching in slopes and stone packing in boulder apron etc with hard granite stone of size 15 cm to 30 cm as per approved drawing and Section 2500, 900 of specifications for road and bridge works of Minister of Road Transfort & Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
38.4
73981
1926.61
... More
Painting two coats with enamel paint of approved shade including all cost, conveyance of all materials, with all labour, all T&P required for the work etc complete in all respect and as per direction of Engineer - in- charge.
22.32
1842
82.53
... More
Dismantling of Prestressed / Reinforced cement concrete grade M-20 and above including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead upto 1000 metres as per clause 202 & all relevant sections/ clauses of Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
55.29
96792
1750.64