Works Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Works Department Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date1 Aug 2024
Closing Date7 Aug 2024
Tender Amount₹ 28,42,198 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
AB switch Mounting Channel 75X40X4.8mm, 7.14KG/Mtr, each channel length 3 Mtr., 2 no's channel required =( 7.14x3x2)

42.84

3890

90.82

... More
AB Switch Side Support Channel 100X50X6mm,9.56 KG/Mtr., each channel length 0.35 mtr., 2 no's channel required =( 9.56x2x0.35)

6.69

607

90.82

... More
Channel Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each channel length 0.8 Mtr., 1 no's channel required =( 7.14x0.8x1)

5.71

518

90.82

... More
Double Pole Belting Channel 75X40X 4.8mm., 7.14KG/Mtr., each channel length 3.0 Mtr., 4 no's channel required =( 7.14x3x4)

85.68

7781

90.82

... More
50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle length 3.512 mtr., 4 nos angle required = (4.5x3.512x4)

63.22

5741

90.82

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no's = (2x0.59x0.510)

0.6

70

116.51

... More
H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)

2

355

177.94

... More
H.T. Stay set (Complete )

2

2989

1494.68

... More
H.T. Stay Insulator Type-C

2

142

71.18

... More
7/10 SWG Stay Wire 15kg /stay

30

3202

106.76

... More
Gi Pipe Earthing 40mm. 3 Mtr. Long

2

2989

1494.68

... More
50x6mm GI Flat for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36

48.38

5636

116.51

... More
GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg)

6

745

124.28

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510)

2.41

280

116.51

... More
Lightning Arrester(12KV,10KA) (Station Class,class-2)

3

16544

5514.93

... More
AB Switch (11KV,400A.3pole,50Hz)

1

18408

18408.98

... More
11 KV pin insulator polymer

3

932

310.7

... More
H W fitting(B&S) 70KN, 3Bolt

6

3262

543.73

... More
Disc insulator (B&S) 70 KN polymer

6

10719

1786.53

... More
PG Clamp for 100 sq.mm AAA conductor

6

4474

745.68

... More
GI Nut , Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch)

13.72

1662

121.17

... More
Black Paint

1

341

341.77

... More
Yellow Colour Paint for Background

2

516

258.12

... More
Civil & Services Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.

2

4500

2250

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

0.9

5850

6500

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.23

1495

6500

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

2

7400

3700

... More
WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

2

67923

33961.85

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 2 no's channel required =( 2x9.56x1.2)

68.8

6248

90.82

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280)

15.9

1852

116.51

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 2 no's channel required =(2x9.56x0.306)

17.6

1598

90.82

... More
Danger Plate, 1 no's.

2

248

124.28

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.6

69

116.51

... More
GI barbed wire anticlimbing device 3 Kg. Per support

6

745

124.28

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

2.41

280

116.51

... More
11 KV pin insulator polymer

9

2796

310.7

... More
H W fitting(B&S) 70KN, 3Bolt

18

9787

543.73

... More
Disc insulator (B&S) 70 KN polymer

18

32157

1786.53

... More
Earthing of Support ( Coil Type )

2

515

257.88

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.52

60

116.51

... More
PG Clamp for 55 sq.mm AAA conductor

18

13422

745.68

... More
GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole)

10.65

1290

121.17

... More
Black Paint

1

341

341.77

... More
Yellow Colour Paint for Background

4

1032

258.12

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

0.9

5850

6500

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.23

1495

6500

... More
WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

2

67923

33961.85

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 2 no's channel required =( 2x9.56x1.2)

91.78

8335

90.82

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280)

29.08

3387

116.51

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 2 no's channel required =(2x9.56x0.306)

23.4

2125

90.82

... More
Danger Plate, 1 no's.

2

248

124.28

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.6

70

116.51

... More
GI barbed wire anticlimbing device 3 Kg. Per support

6

745

124.28

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

2.41

280

116.51

... More
11 KV pin insulator polymer

12

3728

310.7

... More
H W fitting(B&S) 70KN, 3Bolt

18

9787

543.73

... More
Disc insulator (B&S) 70 KN polymer

18

32157

1786.53

... More
Earthing of Support ( Coil Type )

2

515

257.88

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.52

61

116.51

... More
PG Clamp for 55 sq.mm AAA conductor

18

13422

745.68

... More
H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)

2

355

177.94

... More
H.T. Stay set (Complete )

2

2989

1494.68

... More
H.T. Stay Insulator Type-C

2

142

71.18

... More
7/10 SWG Stay Wire 15kg /stay

30

3202

106.76

... More
GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole)

14.87

1801

121.17

... More
Black Paint

1

341

341.77

... More
Yellow Colour Paint for Background

4

1032

258.12

... More
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.

2

4500

2250

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

0.9

5850

6500

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.2

1300

6500

... More
WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

15

509427

33961.85

... More
11 KV V cross Arm (10.2 K.g. each )

15

18875

1258.34

... More
Top bracket 100x50X6 mm GI channel (2kg each)

15

3495

233.03

... More
Danger Plate, 1 no's. for each pole

15

1864

124.28

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

4.51

525

116.51

... More
GI barbed wire anticlimbing device 3 Kg. Per support

45

5592

124.28

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

18.05

2103

116.51

... More
11 KV pin insulator polymer, 3 Nos. required for each support

45

13981

310.7

... More
Earthing of Support ( Coil Type )

15

3868

257.88

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

3.93

457

116.51

... More
GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point)

21.75

2635

121.17

... More
55 mm2 AAAC

2.63

122571

46605

... More
Black Paint

15

5126

341.77

... More
Yellow Colour Paint for Background

30

7743

258.12

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

6.75

43875

6500

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

1.69

10985

6500

... More
WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

1

33961

33961.85

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 2 no's channel required =( 2x9.56x1.2)

183.6

16674

90.82

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280)

42.3

4928

116.51

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 2 no's channel required =(2x9.56x0.306)

46.8

4250

90.82

... More
Danger Plate, 1 no's.

1

124

124.28

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.3

34

116.51

... More
GI barbed wire anticlimbing device 3 Kg. Per support

3

372

124.28

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

1.2

139

116.51

... More
11 KV pin insulator polymer

24

7456

310.7

... More
H W fitting(B&S) 70KN, 3Bolt

48

26098

543.73

... More
Disc insulator (B&S) 70 KN polymer

48

85753

1786.53

... More
Earthing of Support ( Coil Type )

1

257

257.88

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.26

30

116.51

... More
PG Clamp for 55 sq.mm AAA conductor

48

35792

745.68

... More
GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole)

28.4

3441

121.17

... More
Black Paint

0.5

170

341.77

... More
Yellow Colour Paint for Background

2

516

258.12

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

0.45

2925

6500

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.11

715

6500

... More
WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

4

135847

33961.85

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 2 no's channel required =( 2x9.56x1.2)

183.55

16670

90.82

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280)

54.19

6313

116.51

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 2 no's channel required =(2x9.56x0.306)

46.81

4250

90.82

... More
Danger Plate, 1 no's.

4

497

124.28

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

1.2

140

116.51

... More
GI barbed wire anticlimbing device 3 Kg. Per support

12

1491

124.28

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

4.81

560

116.51

... More
11 KV pin insulator polymer

22

6835

310.7

... More
H W fitting(B&S) 70KN, 3Bolt

33

17942

543.73

... More
Disc insulator (B&S) 70 KN polymer

33

58955

1786.53

... More
Earthing of Support ( Coil Type )

4

1031

257.88

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

1.05

122

116.51

... More
PG Clamp for 55 sq.mm AAA conductor

33

24607

745.68

... More
H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)

5

889

177.94

... More
H.T. Stay set (Complete )

5

7473

1494.68

... More
H.T. Stay Insulator Type-C

5

355

71.18

... More
7/10 SWG Stay Wire 15kg /stay

75

8007

106.76

... More
GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole)

29.73

3602

121.17

... More
Black Paint

2

683

341.77

... More
Yellow Colour Paint for Background

8

2064

258.12

... More
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.

5

11250

2250

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

1.8

11700

6500

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.5

3250

6500

... More
WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

1

33961

33961.85

... More
11 KV V cross Arm (10.2 K.g. each )

1

1258

1258.34

... More
Top bracket 100x50X6 mm GI channel (2kg each)

1

233

233.03

... More
Danger Plate, 1 no's. for each pole

1

124

124.28

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.3

34

116.51

... More
GI barbed wire anticlimbing device 3 Kg. Per support

3

372

124.28

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

1.2

139

116.51

... More
11 KV pin insulator polymer, 3 Nos. required for each support

3

932

310.7

... More
Earthing of Support ( Coil Type )

1

257

257.88

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.26

30

116.51

... More
GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point)

1.45

175

121.17

... More
55 mm2 AAAC

1.11

51731

46605

... More
Crimping type Midspan Compression joint for 55mm² AAAC

1

319

319.64

... More
Black Paint

1

341

341.77

... More
Yellow Colour Paint for Background

2

516

258.12

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

0.45

2925

6500

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.11

715

6500

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 2 no's channel required =( 2x9.56x1.2)

45.9

4168

90.82

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280)

10.6

1235

116.51

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 2 no's channel required =(2x9.56x0.306)

11.7

1062

90.82

... More
11 KV pin insulator polymer

6

1864

310.7

... More
H W fitting(B&S) 70KN, 3Bolt

12

6524

543.73

... More
Disc insulator (B&S) 70 KN polymer

12

21438

1786.53

... More
PG Clamp for 55 sq.mm AAA conductor

12

8948

745.68

... More
GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole)

7.1

860

121.17

... More
WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

5

169809

33961.85

... More
11 KV V cross Arm (10.2 K.g. each )

5

6291

1258.34

... More
Top bracket 100x50X6 mm GI channel (2kg each)

5

1165

233.03

... More
Danger Plate, 1 no's. for each pole

5

621

124.28

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

1.5

174

116.51

... More
GI barbed wire anticlimbing device 3 Kg. Per support

15

1864

124.28

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

6.02

701

116.51

... More
11 KV pin insulator polymer, 3 Nos. required for each support

15

4660

310.7

... More
Earthing of Support ( Coil Type )

5

1289

257.88

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

1.31

152

116.51

... More
GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point)

7.25

878

121.17

... More
55 mm2 AAAC PVC Insulated

0.74

48848

66011.8

... More
Black Paint

5

1708

341.77

... More
Yellow Colour Paint for Background

10

2581

258.12

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

2.25

14625

6500

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.56

3640

6500

... More
WPB 160x152 (11Mtr. Long, 30.44KG/Mtr.)

2

67923

33961.85

... More
9 Mtr. long 300 Kg. PSC Pole (For Raising of LT ABC)

1

5050

5050.5

... More
Pole clamp for EYE hook for (XLPE Aerial bunched Cable)

2

621

310.7

... More
EYE hook for XLPE Aerial bunched Cable

2

186

93.21

... More
Dead End Clamp suitable for messenger XLPE Aerial bunched Cable

2

201

100.98

... More
Top Channel GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg)

57.36

5209

90.82

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280)

3.97

461

116.51

... More
AB Switch Mounting Channel 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg)

42.84

3890

90.82

... More
AB Switch Side Support Channel 100X50X6mm,9.56 KG/Mtr., each channel length 0.35 mtr., 2 no's channel required =( 9.56x2x0.35)

6.69

607

90.82

... More
Channel Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each channel length 0.8 Mtr., 1 no's channel required =( 7.14x0.8x1)

5.71

518

90.82

... More
HG/ DO Fuse Mounting Channel 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg)

42.84

3890

90.82

... More
Cantilever Support Channel 75x40x4.8 mm GI Channel (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg)

11.57

1050

90.82

... More
Cantilever Support Angle 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg)

11.54

1048

90.82

... More
Transformer Base GI Channel 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg)

57.36

5209

90.82

... More
Transformer Base Support GI Channel 100 X 50 X 6 MM (515 mm long) (9.56Kg./Mtr, 2 No's) (Each 2x0.515x9.56= 9.85Kg)

9.85

894

90.82

... More
Transformer Belting Angle 50 X 50 X 6MM GI (3000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x3.0x4.5 Kg)

27

2452

90.82

... More
Transformer Belting Support Angle 50 X 50 X 6MM GI (580 mm long)(4.5Kg./Mtr,2 No's) (Each 2x0.580x4.5= Kg)

5.22

474

90.82

... More
LTDB Mounting Angle 50 X 50 X 6MM GI (1000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x1x4.5 Kg)

9

817

90.82

... More
50x6mm GI Flat for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg)

154.82

18038

116.51

... More
LT Distribution Box with MCCB, Aluminium Busbar of 2 Bay with kit kat fuse for 100 KVA S/S

1

37934

37934.92

... More
55mm2 All Alloy Aluminum Conductor (AAAC) - PVC Insulated (50 Mtr. Each Dtr.)

50

3300

66.01

... More
4 Cx 150 mm2 LT XLPE Cable(Armoured) - FOR 100 KVA Trf.

15

13534

902.29

... More
AB Switch(11KV,200A.3pole,50Hz)

1

11418

11418.23

... More
H.G.Fuse( 11KV.200A.3Pole)

1

9507

9507.42

... More
PG Clamp for 55 sq.mm AAA conductor

6

4474

745.68

... More
Disc insulator (B&S)70 KN polymer

3

5359

1786.53

... More
H W fitting (B&S)70KN(3bolted)

3

1631

543.73

... More
Lightning Arrester(12KV,10KA) Station Class 2

3

16544

5514.93

... More
11KV pin insulator polymer

3

932

310.7

... More
HT stay set complete

2

2989

1494.68

... More
HT stay Clamp (1.9Kg/pair)

2

355

177.94

... More
HT stay insulator TYPE-C

2

142

71.18

... More
7/10 SWG GI stay wire, Grade -2 (15Kg./ Set)

30

3202

106.76

... More
40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long

7

10462

1494.68

... More
GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP)

25

3029

121.17

... More
GI Barbed wire/Anticlimbing device (3Kg /Pole)

6

745

124.28

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510)

2.41

280

116.51

... More
Danger plate 11kv

2

248

124.28

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no's = (2x0.59x0.510)

0.6

70

116.51

... More
Name plate

1

124

124.28

... More
Yellow Colour Paint for Background

2

516

258.12

... More
Black Colour Paint for numbering

1

341

341.77

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.450Cu.mtr (For WPB Pole)

0.9

5850

6500

... More
Couping ratio 1:1.5:3 (500mmX500mmX450mm) = 0.113Cu.mtr

0.23

1469

6500

... More
Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6 size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator .

2

4500

2250

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

7

25900

3700

... More
LTDB Plinth

1

3000

3000

... More
Laying of 4 Cx 150 mm2 LT XLPE Cable

15

1080

72

... More
Supply and Erection of GI Fencing with Gate

15

54000

3600

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr (For PSC Pole)

0.38

2437

6500

... More
9 Mtr. long 300 Kg. PSC Pole

2

10101

5050.5

... More
LT Stay set Complete

3

2220

740.22

... More
7/12 SWG GI stay wire, Grade -2

36

3843

106.76

... More
LT stay Clamp ( 1.40Kg/pair)

3

469

156.59

... More
LT Stay insulator

3

128

42.71

... More
Pole clamp for EYE hook for (XLPE Aerial bunched Cable)

6

1864

310.7

... More
EYE hook for XLPE Aerial bunched Cable (25-70 sq.mm)

6

559

93.21

... More
Dead End Clamp suitable for messenger XLPE Aerial bunched Cable (25-70 sq.mm)

6

605

100.98

... More
3X95 + 1X70 + 1x16mm²(LT AB Cable)

74

27935

377.5

... More
Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm

1

135

135.13

... More
Coil Earthing

2

515

257.88

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

1

116

116.51

... More
Danger plate (LT)

2

248

124.28

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

1

116

116.51

... More
GI barbed wire anticlimbing device 3 Kg. Per support

6

745

124.28

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

2.41

280

116.51

... More
GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole)

1

121

121.17

... More
Black Paint

2

683

341.77

... More
Yellow Colour Paint for Background

4

1032

258.12

... More
Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.)

2

4500

2250

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr

0.38

2470

6500

... More
9 Mtr. long 300 Kg. PSC Pole

6

30303

5050.5

... More
LT Stay set Complete

2

1480

740.22

... More
7/12 SWG GI stay wire, Grade -2

24

2562

106.76

... More
LT stay Clamp ( 1.40Kg/pair)

2

313

156.59

... More
LT Stay insulator

2

85

42.71

... More
Pole clamp for EYE hook for (XLPE Aerial bunched Cable)

8

2485

310.7

... More
EYE hook for XLPE Aerial bunched Cable (25-70 sq.mm)

3

279

93.21

... More
Dead End Clamp suitable for messenger XLPE Aerial bunched Cable (25-70 sq.mm)

3

302

100.98

... More
Suspension Clamp with EYE hook for ABC (25-70 sq.mm)

5

2640

528.19

... More
3X35+1X25mm² (LT AB Cable)

157.5

31807

201.96

... More
Insulated piercing connector.Type-B-main 25 to 150 sq.mm & Tap-6 to 35 sq.mm

2

148

74.25

... More
GI Pipe Earthing (each 5th pole to earth)

1

1494

1494.68

... More
Coil Earthing

5

1289

257.88

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

1.57

183

116.51

... More
Danger plate (LT)

6

745

124.28

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

1.81

210

116.51

... More
GI barbed wire anticlimbing device 3 Kg. Per support

18

2237

124.28

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

7.22

841

116.51

... More
GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole)

3

363

121.17

... More
Black Paint

6

2050

341.77

... More
Yellow Colour Paint for Background

12

3097

258.12

... More
Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.)

2

4500

2250

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr

2.25

14625

6500

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

1

3700

3700

... More
Dismantling of 09/11 Mtr. Jost/WPB Pole- 116X100mm (Serviceable Pole) after digging the pit and taking out the pole, transportation and stacking the pole at a proper place in safe position within 10km/site store and reflling the pit with loose earth and ramming including removal and disposal of malba at proper location as per instruction of EIC

10

13809

1380.92

... More
Dismantling of ACSR/AAAC 34/ 55mm2 from overhead line, recolling, loading, transportation,unloading and staking at a proper place in safe position/ site store

5490

34806

6.34

... More
Stringing of Weasel (ACSR/AAAC) Conductor including jumpering & earthing connection & making of connection hooks ete

1440

31680

22

... More
Dismantling of 9/8 Mtr PCC/Joist Pole (Serviceable Pole) after digging the pit and taking out the pole, transportation and stacking the pole at a proper place in safe position within 10km/site store and refilling the pit with loose earth and ramining including removal and disposal of malba af proper location as per instruction of EIC

24

22094

920.61

... More
Dismantling of existing 11/0.4kV, 33/0,4KV, Three Phase Distribution Transformer 100KVA including removal of HT/LT leads, earth connections and unloading by crane if required. Scope of work also includes loading, transportation, unloading and staking at a proper place in safe position/site store

1

3262

3262.31

... More
Dismantling/Removal of MS Channel, from Double Pole Structure /pole including loading. transportation, unloading and staking of dismantled material at a proper place in safe position at Site store

260

2106

8.1

... More
Installation, Testing and Commissioning of 11/0.4kV, 100 kVA 3-Phase Distribution Transformer on existing structure as per TP Central Orissa Distribution Co. Ltd. specification including loading.unloading, Testing of Transformer at Site. shifting/transportation from site /tent upto 15KM. Scope of work includes jumpering/connection at HT and LT side & Earthing Connections. BA will provide necessary control cable ferruling, control cable schedule, connectors, lugs & cable gland at both end of terminations of control cable

1

18412

18412.2

... More
Stringing of Different size of LT AB Cable from 2x35+1x35 upto 3 x50+ 1x35mm². BA will provide necessary manpower, tools, machinery etc, ladder etc for stringing activities. Transport cost will be paid separately

60

1800

30

... More
Dismantling of varous size of LT AB Cable from over head line, recoiling, loading, transportation, unloading and staking at a proper place in safe position/BA site store.

290

6675

23.02



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.