Works Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Works Department Tender

Works
Eprocure
Opening Date12 Nov 2024
Closing DateCancelled
Tender Amount₹ 3,78,199 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Painting two coats with any approved type of paint over on the new wood work and iron work including cost of the paint sand papering polishing the surface with cost of all materials labour and T&P required for the work etc complete as per the direction of the EIC

116.82

258

30139.56

... More
Supplying, fitting and fixing of M.S. door, window, grills and grill gate including making holes in walls in proper position making good to the damages of walls of RCC or other structurals complete including cutting sizes or grooves in walls with Labour T & P required for the work including cost of fittings etc. complete as per direction of Engineer in charge..

331.11

80

26488.8

... More
Fitting and fixing glass louvers in position in window frames with cost of all materials and all labour etc. complete as per the direction of the Engineer in charge.

2.88

1125

3240

... More
Earth work in excavation in foundation in hard soil with initial leads and lifts including dressing and leveling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour and T&P and dewatering if required for the work etc. complete as per the direction of the Engineer in charge.

15

270

4063.35

... More
Filling Foundation and plinth with Fine course sand of approved quality from approved quarry including watering and ramming with all cost,conveyance,royalty taxes etc.of all materials with all labour T&P required for the work etc.complete as per specification and direction of the Engineer-in-charge.

7.5

843

6325.05

... More
Cement Concrete of proportion (1:3:6) in foundation and plinth using 4cm size clean hard black hand broken granite metal of approved quality from approved quarry including hoisting lowering and laying concrete in layers not exceeding 9" thick to the required level including cost, conveyance and royalty of all materials with all taxes and compacting watering curing and all labour with T&P articles required for the work etc. complete as per specification and direction of the EIC.

10

5684

56840

... More
R.C.C.(1:1.5:3) with 12mm size hard black crusher broken granite chips of approved quality and from approved quarry including hoisting, lowering, laying and compacting concrete, watering, curing for four weeks ,centering ,shuttering and finished the exposed surface smooth ,providing beads where necessary including cost, conveyance, royality & taxes of all materials, labour ,T&P articles required for the work etc. complete but excluding cost of bending, binding of M.S. for Tor Steel & tying the grills and placing in position as per the specification and direction of the Engineer-in-charge.

10

7306

73066.3

... More
Providing , fitting, fixing of PVC Door including all cost of labour T&P hire charges of drilling machine etc complete.bcomplete as per the direction of the Engineer in charge.

4.61

3025

13945.25



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.