Works Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Works Department Tender

Works
Civil And Construction
Eprocure
Opening Date19 Dec 2023
Closing Date2 Jan 2024
Tender Amount₹ 3,36,060 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete (1:2:4) using 12mm hard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge.

1.42

8953

6305.33

... More
R.C.C-M-25 using 20mm and down graded chips laying & lowering concrete watering curing etc complete including cost of Steel Centering and Shuttering all comp. (Plinth band)

1.18

6376

5403.86

... More
Lintel

0.29

2534

8739.36

... More
Chajja

1.11

966

870.38

... More
Roof slab

0.63

5975

9485.07

... More
Supplying cutting, bending, straightening,placing & binding of uncoated HYSD bar reinforcement complete as per drawing and technical specification

2.85

26578

9325.94

... More
Fly ash brick masonry in cement mortar ( 1:6 ) in foundation & plinth cost, carriage, royalty etc. complete. (In foundation & Plinth)

14.31

70008

4892.31

... More
In superstructure

3.69

18175

4925.64

... More
16mm thick cement plaster ( 1:6 ) over brick work with cost, carriage royalty etc. complete.

62.67

13939

222.43

... More
12mm thick cement plaster ( 1:6 ) over brick work with cost, carriage royalty etc. complete.

91.9

14341

156.05

... More
Supplying, fixing and fitting of M.S.Door and window shutters and grills with frames and all other fittings including all cost, conveyance and taxes etc.

172.35

15856

92

... More
Labour for fixing GCI sheet in roof drilling hole in wind ties including fixing of ridges valleys wind tiles etc including cost of fittings

26.98

14126

523.59

... More
Providing and laying CERAMIC FLOOR TILES of premium grade and of approved size & shade in flooring on a bed of 20 mm thick cement mortar 1:4 (1 Cement :4 Coarse sand) finished with flush pointing in white cement & pigment to match the shade of the tiles.

3.72

2629

706.8

... More
Supplying, fitting & fixing of Ceramic wall tiles of premium grade of size 300x200/200x200mm having thickness 6.5mm to 6.7mm confirming to IS 13753 in dadoes, skirting and risers of steps laid on 12 mm thick cement mortar (1:3) (1 cement : 3 course sand) jointed with slurry mixed with pigment to match the shades of the tiles etc. complete including cost of all materials, labour T&P etc. required for the work all complete as per direction of the Engineer-in-charge

16.03

12614

786.9

... More
Supplying, fitting and fixing Vitrified industrial floor Tile of premium grade having thickness 8mm to 10mm confirming to IS 4457 of size 300mm x 300mm of approved make in floors treads or steps and landing on 20 mm thick bed of cement mortar 1:4 (1cement : 4 sand) and filling joints with white cement of approved quality including rubbing and polishing complete including all cost of materials, labour, T & P etc required for the work all complete as per direction of engineer-In-Charge ( for New Works only)

5.57

4820

865.4

... More
Providing Finished wall surface of walls with ACRYLIC Wall Putty ( water based ) of approved make and finished smooth and Even surface to receive painting including cost of materials, labour, T&P all comp.

234.92

21943

93.41

... More
Providing and Painting wall Surface one coat with wall Primer to give an even shed before applying distemper including cost of Primer , labour, T&P all comp.

234.92

15316

65.2

... More
Distempering two coats to walls with approved make distemper of approved shed on new work to give an even shed including cost of distemper , labour, T&P all comp.

234.92

16632

70.8

... More
Providing and Painting Finished wall surface with Weather Coat Paint two coats of approved shed including cost of paint, labour, T&P all comp.

284.09

19829

69.8

... More
Fitting and fixing of American Pan including all cost of material etc complete.

1

10000

10000

... More
Fitting and fixing of tab,sawar,pvc pipes including all cost of material etc complete.

1

6200

6200



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.