Works Department Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Works Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date3 Feb 2025
Closing Date17 Feb 2025
Tender Amount₹ 35,55,549 
Notes
Download

Costs

Summary

Shifting And Re Erection Of Ht/lt Line With Road Crossing Under Ground Cable And Lt Line At Ch 45/200 To 45/800 Panchabhuti Due To Improvement Such As Widening And Strengthening Of Njb Road Sh-21 From 38/000 Km To 82/000 Km In District Of Ganjam.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply and Installation of earthing Device Coil(GI) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

23

309

7112.06

... More
Supply and Installation of 8SWG GI wire 0.131Kg/mtr. 2mtr for concreting pole with coil earthing as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

6.03

139

841.89

... More
Supply and Installation of 100x50x6mm channel for Straight Cros arm 1.2mtr each 24nos. &0.2mtr. long36Nos. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

77.28

139

10796.79

... More
Supply and Installation of 100x50x6mm channel for Straight Cros arm 1.5mtr each 2nos &5x50x6mm GI angle as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

912

139

127415.52

... More
Supply and Installation of Back Clamp as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

40

149

5960.8

... More
Supply and Installation of 11 kv pin insulator 320CD Polymer as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

69

372

25706.64

... More
Supply and Installation of 80sqmm AAA Conductor, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

2.22

80100

177822.13

... More
Supply and Installation of Disc insulator (B&S) 45KN Polymer RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

45

2142

96399.45

... More
Supply and Installation of 11KV H/W Fittings(B&S) re Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

45

653

29422.8

... More
Supply and Installation of PG for Clamp for 80mm2 AAA Conductor (Cut Point)as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

45

987

44427.6

... More
Supply and Installation of Fish Plate as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

39.6

139

5532.52

... More
Supply and Installation of HT Stay set complete, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

9

1955

17603.37

... More
Supply and Installation of Stay insulator, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

9

93

838.26

... More
Supply and Installation of Stay clamp(1.4KG/Pair), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

9

232

2095.65

... More
Supply and Installation of 7/10 SWG stay wire, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

90

139

12573.9

... More
Supply and Installation of Anti Climbing device(GI barbed Wire 3kg per Support), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

60

149

8941.2

... More
Supply and Installation of Back clamp for Barbed Anti Climbing device, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

24.07

139

3362.82

... More
Supply and Installation of Danger Board per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

20

149

2980.4

... More
Supply and Installation of Back clamp for Danger Board, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

6.02

139

841.05

... More
Supply and Installation of G.I Nuts , Bolts and Washer as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

36

145

5230.8

... More
Saundries(Aluminium,Binding tap,insulating tape etc) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

1

2739

2739.4

... More
PART-B(LT Line) Supply, Fabrication and Installation of 10mtr. Long 330kg. PSC Pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

1

13096

13096.46

... More
Supply, Fabrication and Installation of 9mtr. Long 300kg. PSC Pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

40

6044

241780.8

... More
Supply and Installation of RCC Base Plate, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

41

558

22912.44

... More
Supply and Installation of earthing Device Coil(GI) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

41

309

12678.02

... More
Supply and Installation of 8SWG GI wire 0.131Kg/mtr. 2mtr for concreting pole with coil earthing as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

10.74

139

1500.76

... More
Supply and Installation of (3x95+1x70+1x16) mm2 LT XLPE AB Cable as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

2

452658

903053.63

... More
Supply and Installation of Suspension clamp with I hook Cement as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

45

633

28500.75

... More
Supply and Installation of Dead ene clamp with I Hook as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

23

232

5355.55

... More
Supply and Installation of Pole clamp for Eye Hook as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

68

372

25334.08

... More
Supply and Installation of GI Nuts , Bolts and Washer as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

34

145

4940.2

... More
Supply and Installation of LT Stay set complete, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

10

968

9686.5

... More
Supply and Installation of Stay insulator, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

10

55

558.8

... More
Supply and Installation of LT Stay Clamp 1.4Kg/Pair) , as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

10

204

2049.1

... More
Supply and Installation of 7/12 SWG GI stay wire, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

80

139

11176.8

... More
Supply and Installation of Danger Board per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

41

149

6109.82

... More
Supply and Installation of Back clamp for Danger Board, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

12.34

139

1724.02

... More
Supply and Installation of Anti Climbing device(GI barbed Wire 3kg per Support), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

123

149

18329.46

... More
Supply and Installation of Back clamp for Barbed Anti Climbing device, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

49.35

139

6894.69

... More
Saundries(Aluminium,Binding tap,insulating tape etc) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

1

2739

2739.4

... More
Supply and Installation of concrete material for stay anchore plate as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

22

1457

32075.56

... More
Supply and Installation of Cement concrete for PSC pole Support with C.c 1:3:6 by using 4cm size HBG metal as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

41

2832

116112

... More
Supply and Installation of Cement concrete for WPB pole Support with C.c 1:3:6 by using 4cm size HBG metal as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

20

3398

67968

... More
Supply and Installation of Couping in Ratio C.c 1:1.5:3 as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

61

849

51825.6

... More
Labour Charges for Dismentalling of LT Pole including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

22

590

12980

... More
Labour Charges for Dismentalling of LT Line including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

23

472

10856

... More
Labour Charges for Dismentalling of HT Pole including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

12

1146

13763.52

... More
Labour Charges for Dismentalling of HT Line including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

13

590

7670

... More
PART-C(Under Ground Line) Supply and Installation of 1.1KV 4C×300mm2 XLPE Insulated Armoured Cable as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

68

1958

133192.28

... More
Supply and Installation of 1C×95mm2 LT XLPE Armoured Cable as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

34

273

9310.22

... More
Supply and Installation of HDPE160mm Dia, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

102

1201

122525.46

... More
Supply and Installation of Heat sahrinkable Jiointing kit suitable for 4Cx300sqmm 11KV XLPE Cable (out door Type) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

4

5565

22260.24

... More
Supply and Installation of clamp to holding of pipe with Channel and angle as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

8

149

1192.16

... More
Supply and Installation of GI Nuts , Bolts and Washer as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

5

145

726.5

... More
Saundries(Aluminium,Binding tap,insulating tape etc) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

1

2739

2739.4

... More
Labour Charges for Earth Work Excluding Hard Work including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

11.52

386

4449.6

... More
Labour Charges for BA will Back filling the excavation site with same earth BA will provide necessary tools ,Machinary and manpower for the activity including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

4.6

386

1776.75

... More
Labour Charges for shifting of excavation soil including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

2.8

202

566.8

... More
Labour Charges forsand work including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

5.12

1207

6179.94

... More
Supply, Laying and fixing of 1st class fly ash brick including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

70

13

954.1

... More
Labour Charges for BA will Back Break asphalt road and Remove the Debris necessary tools ,Machinary and manpower for Cable trench t including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

5.76

1163

6702.16

... More
Labour Charges for laying of HDPE pipe from size 110mm to 200mm in open inside trench including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.

102

362

36935.22



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.