Works Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 8,59,500Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_EICCL_61198_1Bid Award Id
ViewTender No
Bid_Identification_No_SE_R andB PLB_01_2020_21Tender Authority
Works Department ViewPurchaser Address
-Website
http://https://www.worksodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing Wet Mix Macadam using crushed stone aggregates as per approved drawing and technical specification as per clause 406, section 900 and all relevant sections/ clauses of the MoRT&H Speification for road & Bridge works (5th Revision) & including all cost i.e cost of all matericals,all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
13695.25
-
1708.45
... More
Providing & applying primer coat with slow setting (SS-1) Bitumenn Emulsion on prepared surface of granular base includingclearing road surface and spraying primer @ 0.60 Kg / Sqm using mechinical means as per clause 501, 502 and section 900 and all relevant sections/ clauses of the specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
54780.98
-
17.72
... More
Providing & applying tack coat with rapid setting (RS-1) Bitumen Emulsion on prepared surface including cleaning of road surface and spraying tack coat @ 0.20 K.g / Sqm using mechanical means as per Cluse No. 501, 503 and Section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
54780.98
-
6.61
... More
Providing and laying compacted Semi Dense Bitminous Concrete using 60/70 grade Bitumen and crusher broken hard granite aggregates of specified grading premixed with bitumenous binder @ 5 percent of mix and filler transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade and level and alignment rolling with smooth wheeld vibratory and tandom rollers to achieve the desired compaction as per section 500, 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
1369.52
-
6109.08
... More
Construction of embankment with approved materials deposited at site from road-way cutting and other structures with all lifts and leads graded and compacted to meet requirement as per approved drawing and techinacal specfication as per Section 900 and Clause 305 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
1242.91
-
55.2
... More
Construction of embankment with approved materials obtained from borrow pits with all leads and lifts transporting to site spreading, grading slope and compacting to meet required etc complete as per Clause No 305, section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
39265.95
-
128.7
... More
Providing compacted shoulder with granular materials by using moorum of approved quality, watering and compacting the required density in OMC with VRR as per approved drawing and technicial specification as per Section 900 and SECTION 400 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
4183.65
-
575.96
... More
Fine dressing and turfing the slopes of the embankment with grass sods with initial lead of 50m and 1.5m initial lift as per clause 307, section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
73227.9
-
16.86
... More
Reinforced cement concrete M-30 compacted by vibration including curing for 14 days as per Section No.900,1500,1700,2300,2700 & all relevant sections/ clauses of MORT&H specifcation and cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect but excluding the cost and conveyance of M.S Rod or TOR steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending ,bindind and tying the grills and placing in proper position and as per specification and direction of the Engineer- in- charge.
1074.6
-
5019.69
... More
Supplying, fitting and placing uncoated HYSD bar reinforcement including cutting, bending and binding as per drawing and technical specification as per section 1600, section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P etc complete in all respect and as per direction of the Engineer- in- charge.
491.7
-
6055.78
... More
ROAD SAFETY MEASURES
Road marking with Hot applied thermoplastic compound with Reflectorising Glass beads on bituminous surface by providing and laying of hot applied thermoplastic compound 2.5mm thick including Reflectorising glass beads @ 250gms per sqm area thickness of 2.5mm.is exclusive of surface applied glass beads The finished surface to be level uniform and free from streaks and holes as per IRC: 35 and Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
5458.05
-
388.28
... More
Providing retro-reflectorised cautionary, Mandatory and Informatory sign boards as per IRC. 67 made of high intensity grade sheeting vide clause no. 801.3 fixed over aluminium sheeting 1.5mm thick supported on a mild steel angle iron post 75 x 75mm x 6mm size as per approved drawing as per clause no.801.08 of MoRT&H specification and Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
-
-
-
... More
A. Mandatory sign boards
(i). 800mm x 600mm size Rectangular (Informatory)
60
-
4916.49
... More
(ii) Route marker sign (450mm x 600mm)
60
-
3475.64
... More
B.Cautionery sign board
(i)900mm size Equilateral Tringle (Mandatory)
50
-
4024.53
... More
(ii) 600mm size Circular (Cautionery)
50
-
3564.84
... More
(iii) 900mm high octagon
40
-
6233.83
... More
Reinforcement cement concrete M-15 using 10mm to 12mm size chips for Km Stone of standard design as per IRC-25-1967 as per Section 1500,1600, 1700, Section 900 & all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) fixed in position , finishing and lettering including painting & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
-
-
-
... More
(i) 5th Km stone
3
-
2899.82
... More
(ii) Ordinary km stone
12
-
1747.99
... More
(iii) 200 mt Stone
61
-
494.22
... More
Supplying and fixing 15cm dia 1.00m long guard posts of RCC (1:2:4) using 7.5Kg of steel for each guard post with 12mm size black hard granite stone chips including cost of all reinforcement and materials centering shuttering and watering carrying etc complete. including fixing by excavation 0.45 x 0.45 x 0.45 and making base by using CC 1:3:6 as per Section1500,1600, 1700 & all relevant sections/ clauses of Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
520
-
288.68
... More
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-1967, fixed in position including finishing and lettering but excluding painting as per section 1500,1600, 1700 & all relevant sections/ clauses of Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
304
-
549.6
... More
Dismantling of Cement Concrete Grade M-15 & M- 20 including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead upto 1000 metres as per clause 202 & all relevant sections/ clauses of Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
680.64
-
412.22
... More
Removing all types of hume pipe including earthwork and dismanting of cement concrete/ masonry work including T&P and scaffolding whenever necessary, sorting the dismantling materials, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead upto 1000mtr. as per Clause No.202 & all relevant sections/ clauses of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P etc complete in all respect and as per direction of the Engineer- in- charge.
-
-
-
... More
(i) Upto 600mm dia
52.5
-
188.22
... More
(ii) Above 900mm
37.5
-
434.2
... More
Earth work in excavation in soil for road works drain toe wall and CD works with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and techinical specification including setting out dressing of section to correct line level grade & camber and loading into tippers transporting to embankment site within all lifts and lead upto 1000 mtr and utilising the surplus earth locally for road work whenevre required, backfilling the excavation earth to the extent required complete Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per section 300 & all relevant sections/ clauses of Specification for road & bridge work of MoRT &H (5th Revision) & direction of Engineer in charge.
6114.44
-
42.28
... More
Filling foundaction and pilnth with excavated earth ramming etc complete as per approved drawing and techinical specification as per section 300, 400, 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
3135.9
-
335.68
... More
Plain cement concrete M-15 in foundation with crushed stone aggregates 20mm size and mixed , placed in foundation and compacted as per section 900, 1500, 1700, 2100, 2900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
3242.6
-
4048.98
... More
Plain cement concrete M-15 in Sub structure with crushed stone aggregates 20mm size and mixed , placed in foundation and compacted as per section 900, 1500, 1700, 2200,2900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
1253.79
-
4267.85
... More
Providing laying and fixing in position reinforced cement concrete 1200 mmd ia NP4 hume pipes for culverts on first class beddings of granular materials/ concrete including pointing ends fixing collars with cement morter 1:3 for finished item of work as per section 1000 & 2900 & all relevant sections/ clauses of road & Bridge works Hghhway (5th Revision) Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. 1200 mm dia
275
-
9565.39
... More
Providing and applying 2 coats of water based cement paint to unplastered concrete surface over a coat of cement wash after cleaning the surface of dirt dust, oil grease, efflorescence and applying paint @ 1 Ltr for 2 sqm including all cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect and as per direction of Engineer - in- charge.
2687.91
-
45.7
... More
Gravel backing to approns & revetments and providing fliter material using gravel underneath pitching in slope as per approved drawings and techinical specification as per section 2500, 900 of Spectification for Road & Bridge works (5th Revision) and including all cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect and as per direction of Engineer - in- charge.
285.5
-
608.72
... More
Rough stone dry packing in aprons revetments stone pitching in slopes and stone packing in boulder apron etc with hard granite stone of size 30 cm and above as per approved drawing and Section 2500, 900 of specifications for road and bridge works of Minister of Road Transfort & Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
1160.36
-
1438.43
... More
Laying R.C.C pipe 900mm dia NP3 /Prestressed Concrete pipe for culverts on first class bedding of granular materials / concrete in single row including fixing collar with Cement mortar(1:2) as per section 1000 & 2900 & all relevant sections/ clauses of road & Bridge works Hghhway (5th Revision) including all cost, conveyance of all materials, royalities with all labour, T&P required for the work etc complete in all respect and as per direction of Engineer - in- charge.
25
-
4998.37
... More
Laying R.C.C pipe 1000 mm dia NP3 /Prestressed Concrete pipe for culverts on first class bedding of granular materials / concrete in single row including fixing collar with Cement mortar(1:2) as per section 1000 & 2900 & all relevant sections/ clauses of road & Bridge works Hghhway (5th Revision) Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
325
-
5926.56
... More
Laying R.C.C pipe 1200 mm dia NP3 /Prestressed Concrete pipe for culverts on first class bedding of granular materials / concrete in single row including fixing collar with Cement mortar(1:2) as per section 1000 & 2900 of road & Bridge works Highway (5th Revision) Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
35
-
7547.41
... More
Reinforced cement concrete M-20 compacted by vibration including curing for 14 days as per Section 900, 1500,1700,2100 & all relevant sections/ clauses of MORT&H specifcation and cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect but excluding the cost and conveyance of M.S Rod or TOR steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending ,bindind and tying the grills and placing in proper position and as per specification and direction of the Engineer- in- charge.
190.89
-
4714.88
... More
Drain wall RCC M20
135.9
-
5993.32
... More
Cover Slab RCC M20
40.77
-
4864.11
... More
Reinforced cement concrete M-25 compacted by vibration including curing for 14 days as per Section 900,1500,1700,2100, 2200, 2300 & all relevant sections/ clauses of MORT&H specifcation and cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect but excluding the cost and conveyance of M.S Rod or TOR steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending ,bindind and tying the grills and placing in proper position and as per specification and direction of the Engineer- in- charge.
-
-
-
... More
Foundation
38.96
-
5049.52
... More
Sub Structure
29.88
-
7996.53
... More
Super structure
23.52
-
7053.4
... More
Providing and fixing drainage spouts in deck slab with 1000 mm diameter G.I pipe completed for finished item of work as per approved drawing and techinical specifiations as per section 2700 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
8
-
767.83
... More
Providing laying of filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in section 900 and 2500 of MoRT&H specification to a thickness not less than 600mm with small size towards the soil and bigger towards the wall and provided over the entire surface behind abutment wing walls return walls to the full height compacted to a firm condition complete as per drawing and technical specification & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
133.84
-
2104.43
... More
Grouting to aprons and revetments ( 23cm deep) with cement mortar (1:4:8) using 25mm size broken granite aggregates Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
67.05
-
224.69
... More
Plain cement concrete (1:3:6) Nominal mix in foundation with crushed stone aggregates 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curring for 14 days including all costs i.e. cost of all materials,all labour, all T&P, royalty etc complete in all respect and as per clause 1500, 1700, 2100 and other relevant clauses of MORT&H Specifications and as per the direction of the Engineer - in- charge.
199.43
-
4239.06
... More
Providing weep holes in brick masonry / plain or RCC /abutment / wing wall , retaining wall/ toe wall with 100mm dia AC pipe extending through the full width of structure with slope of 1V : 20H towards draining face complete as per drawing and technical specification as per Clause - 2706 of MoRT&H Specition for Road & Bridge works (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
613.7
-
84.99
... More
Back Filling in F& P with excavated material including watering ramming etc complete as per section300,400,900, 2900 & all relevant clauses/ sections of MORT&H Specifications Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
591.86
-
28.19
Evaluation Notes How It Works ?