Water Resources Department Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Water Resources Department - WRD Tender

Civil And Construction
Eprocure
Opening Date29 Oct 2021
Closing Date17 Nov 2021
Tender Amount₹ 3,64,91,197 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing stone rip-rap to the slope of earth dam & dyke with quarried granite stone boulders of size 0.30m & above including dumping in slope filling interstices with small stones & wedge & packing surface to proper line & level including fixing wave breakers complete with cost, carriage, royalty of all materials, cost of all labour, T&P, B&OCWW cess but excluding GST etc complete as per approved specification and direction of the Engineer-in-charge.

19458.92

-

1517

... More
Rough stone dry packing in approns & revetments with hard granite stones of 30cm above size from approved quarry, filling the intersticks with small stones & wedging to proper line & level with cost, carriage, royality of all materials, cost of all labour, T&P, B&OCWW cess but excluding GST etc complete as per approved specification and direction of the Engineer-in-charge.

1146.78

-

1792.6

... More
Earth work in excavation of foundation in all kinds of soil including rough dressing, levelling the foundation bed and laying the excavated earth in layers not exceeding 0.30m depth in the specified filling sections, rough dressing and breaking clods to maximum 5 cm to 7 cm and disposing the excess earth away from work site with all leads , lifts, delifts including cost of all labour, T&P, B&OCWW cess but excluding GST etc. complete as per approved specification and direction of the Engineer -in- Charge.

1080.3

-

186.4

... More
Filling foundation and plinth with excavated materials laying in layers not exceeding 0.30M in depth including well watered and rammed with cost of all labour , T &P, B&OCWW cess but excluding GST etc. complete as per approved specification and direction of the Engineer -in- Charge.

360.1

-

103.6

... More
Collecting, supplying and stacking of good quality moorum and sand in regular box heap size of 1.50m X 1.50m X 0.44m to be measured as one cum, conveying from stacks and admixing moorum and sand in (70:30) proportion and laying in sub-base of road in layers not exceeding 150 mm thick, consolidation with P.R.R, with all leads , lifts and delifts including cost, conveyance, royalty of all materials, cost of all labour, T&P, hire and running charges of machineries, B&OCWW cess excluding GST etc.complete as per approved specification and direction of the Engineer-in-Charge.(Measuremnt will be taken on finished compacted sections only)

1122.5

-

1120.1

... More
Collecting and supplying of approved quality of hard granite Grade-II Metal ( 63 mm to 45 mm.) and binding materials (moorum from approved querry and stacking at work site in regular stacks of 1.50 x 1.50 x 0.44 m to be measured as 1 cum for premeasurement inclduing cost, carriage, royality and all other taxes of all materials etc complete and conveying from stacks, spreading in layers and compacting stone aggreegates of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheeled Road Roller 8 to 10 Tonns in stage to proper grade and camber, applying and brooming requisite type screening binding materials to fill up the interstics of coarse aggregates, watering and compacting to the required density as per clause 404 of M.O.R.T & H specification of Road and Bridge work (4th Revision) complete with cost of all labour T&P, hire and running charges of machinery & equipments, B&OCWW cess but excluding GST etc complete as per approved specification and direction of the Engineer-in-charge.

281.25

-

2692.9

... More
Collecting and supplying of approved quality of hard granite IRC Grade-III Metal ( 53 mm to 22.40 mm. ) and binding materials (moorum from approved querry and stacking at work site in regular stacks of 1.50 x1.50x 0.44 m to be measured as 1 cum for premeasurement inclduing cost, carriage, royalty and all other taxes of all materials etc complete and conveying from stacks, spreading in layers and compacting stone aggreegates of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheeled Road Roller 8 to 10 Tonns in stage to proper grade and camber, applying and brooming requisite type screening binding materials to fill up the interstics of coarse aggregates, watering and compacting to the required density as per clause 404 of M.O.R.T&H specification of Road and Bridge work (4th Revision) complete with cost of all labour T&P, hire and running charges of machinery & equipments, B&OCWW cess but excluding GST etc complete as per approved specification and direction of the Engineer-in-charge.

281.25

-

2761.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.