Water Resources Department Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Water Resources Department - WRD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date29 Oct 2024
Closing Date11 Nov 2024
Tender Amount₹ 84,59,836 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
R.C.C. work of M-25 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including hoisting and laying including cost,carriage,royality as per direction of Engineer-in-charge.

292.31

8235

2407406.7

... More
R.C.C. work of M-30 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including hoisting and laying including cost,carriage,royality as per direction of Engineer-in-charge.

9.01

8260

74427.11

... More
Collecting and supplying sand and moorum and laying in sub-base in layers after admixing sand and moorum in ( 40:60 ) proportion not exceeding 100mm, watering and compaction to required density in O.M.C condition with P.R.R including cost of all labour and conveyance of sand and moorum, hire and running charges of P.R.R and all other T&P materials etc. complete as per the direction of the Engineer-in-Charge.

58

2026

117513.8

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia UPVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specification.

67.2

315

21201.6

... More
Filling foundation and plinth witrh excavated material including watering and ramming as directed by Engineer-in-charge

1309.06

53

70492.88

... More
Supplying ,fitting and placing uncoated HYSD bar reinforcement including cost,carriage,royality complete as per the direction of Engineer-in-charge.

271.85

8625

2344950.92

... More
Earth work in suitable type of soil in borrow area, loading into transport vehicle mechanically and transportation of earth by mechamical means unloading the same over the approved surface of embankment in proper profiles with 5.0km leads ,including rough dressing and breaking the clods to maximum 5cm. to 7cm. size including removal of roots ,bushes ,other deleterious materials from transported earth with all cost ,carriage , roralty , labour welfarecess & laying in layers not exceeding 22.5cm in depth with compacting by sheep foot Roller, hire &running charges of all machineries with all labour &T & P required for the work etc.complete in all respect as per specification and direction of the Engineer-in-Charge.

3230

292

946067

... More
Rigid and smooth centering shuttering for concrete work including dismentanling then after casting with all cost, carriage, labour T&P etc. Complete as per direction of Engineer-in-charge.

-

-

-

... More
Foundaiton & Plinth

360.68

247

89268.3

... More
Roof Slab

239.07

902

215832.4

... More
Wall & Fins

410.5

1055

433446.95



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.