Water Resources Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 22,000Document Cost
₹ 6,000Tender Fee
Refer Documents
Summary
(42) Improvement To Ksdr Embankment From Rd 40.300 Km. To 41.100 Km.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_CELBB_86355_42Bid Award Id
ViewTender No
e-Procurement Notice No.SEPRD-27/2022-23Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://www.dowrodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying, spreading and compacting stone aggregates of specific size of 45mm to 63mm (IRC Grade - II) to W.B.M specification including cost, carriage, royality and all other taxes to water bound macadam specification in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tones in stages to proper grade and camber including conveying, spreading of filter material with gravel or moorum and filling the interstices by spreading the same over surface consolidation with PRR and brooming requisite type of binding materials to fill up the interstices to course aggregate, watering and compacting to the required density as epr Clause - 404 of MORST & H. specification for road work including all taxes, cess, labour, T & P & quality control testing charges of materials etc. complete as per direction of the Engineer-in-Charge.
210.6
-
2643.8
... More
Quarrying, collecting & supplying of good quality of moorum from approved quarry and stacking near work site in regular box heaps of 1.5 x 1.5 x 0.5 m to be measured as one cum with all leads, lifts and delifts including cost, conveyance, royalty, taxes of all materials etc. complete & spreading the same on the road surface and flank, consolidation with PRR including watering etc. complete with all labour, T & P, taxes, cess etc. all complete as per the direction of the Engineer-in-Charge
230.4
-
1125.9
... More
Earth work in approved type of soil in borrow area by mechanical means and loading in to transportation vehicle and transportation of earth by mechanical means and unloading the earth over the approved surface of the embankment in proper profiles with all leads, lifts,delifts including rough dressing and breaking the clods in to 5 cm to 7 cm size including removal of all foreign materials, debrises, grass, bushes, vegetations, shrubs, roots from transportated earth including laying in layers not exceeding 22.50 cm in depth excluding watering and ordinary compaction by PRR including construction and maintenance of haul road, cost of hire & running charges of all machineries, T & P, cost of fuel, lubricants, cost of labour,carriage, royalty, cess , taxes etc. all complete as per specification and direction of the Engineer-in-Charge.(Measurement will be taken on finished compacted level section only and earth to be arranged by the contractor at his own cost and responsibility.)
1681.6
-
145.7
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements