Water Resources Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Water Resources Department - WRD Tender

Civil And Construction
Eprocure
Opening Date29 Oct 2021
Closing Date17 Nov 2021
Tender Amount₹ 1,54,52,766 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fine dressing and turfing the slopes including filling rain cuts and slips with selected earth duly compacted and trimmed to the required profile and turfing the surface with compact dub grass, sods 8cm to 10cm thick with all leads and lifts including loading, unloading, cesss and othe taxes of all materials with all leads, lifts and delifts including laying and trimming to form a level and compact surface in line with the slopes and grade of the canal / dam section including watering until green growth of grass and B&OCWW cess but excluding GST etc. including mobilisation and demobilisatioin complete as per approved drawing, design, specification and direction of the Engineer-in-charge. (Measurements will be taken after survival of green growth )

3178

-

19.5

... More
Providing stone rip to the slope of earth dam & dyke with quarried granite stone boulders of size 0.30m & above including dumping in slope filling interstices with small stones & wedge & packing surface to proper line & level including fixing wave breakers complete with cost, carriage, royalty of all materials, cost of all labour, T&P, B&OCWW cess but excluding GST etc complete as per approved specification and direction of the Engineer-in-charge.

7062.52

-

1328.6

... More
Rough stone dry packing in approns & revetments with hard granite stones of 30cm above size from approved quarry, filling the intersticks with small stones & wedging to proper line & level with cost, carriage, royality of all materials, cost of all labour, T&P, B&OCWW cess but excluding GST etc complete as per approved specification and direction of the Engineer-in-charge.

871.95

-

1604.2

... More
Earth work in excavation of foundation in all kinds of soil including rough dressing, levelling the foundation bed and laying the excavated earth in layers not exceeding 0.30m depth in the specified filling sections, rough dressing and breaking clods to maximum 5 cm to 7 cm and disposing the excess earth away from work site with all leads , lifts, delifts including cost of all labour, T&P, B&OCWW cess but excluding GST etc. complete as per approved specification and direction of the Engineer -in- Charge.

274.19

-

186.4

... More
Filling foundation and plinth with clean course sand of approved quarry free from delitorious materials, well watered and rammed with cost, conveyance, royalty of all materials, cost of all labour, T&P, B&OCWW cess but excluding GST etc. complete as per approved specification and direction of the Engineer -in- Charge.

150.56

-

460.9

... More
Providing and laying Cement Concrete M15 grade using 20 mm size down graded black hard granite crusher broken chips and sharp sand of approved grading from approved quarry for cement concrete work conforming to specification, mixing by concrete mixture, hoisting, leading and laying concrete in position, compacting with vibrator and curing for specified days by suitable means with cost, conveyance, taxes, royalty of all materels, supervision charges including mobilization and demobilization with cost of construction and dismantling of gangway and scaffolding, chute with all materials, approach road, diversion road, site illumination, hire and running charges of machineries required for the work with cost of all labour, T&P, B&OCWW cess but excluding GST etc. complete as per approved drawing and specification and as directed by Engineer-in-Charge.

77.36

-

4460.1

... More
Providing and laying Plain Cement Concrete M-25 grade in approved surface using 20 mm size and down graded black hard granite crusher broken chips and sharp sand of approved grading from approved quarry for cement concrete work conforming to specification, mixing by concrete mixture, hoisting, leading and laying concrete in position, compacting with vibrator and curing for specified days by suitable means with cost, conveyance, taxes, royalty of all materials, supervision charges including mobilization and demobilization with cost of construction and dismantling of gangway and scaffolding, chute with all materials, approach road, diversion road, site illumination, hire and running charges of machineries required for the work with cost of all labour, T&P, B&OCWW cess but excluding GST etc. complete as per approved drawing and specification as directed by Engineer-in-Charge.

342.65

-

5161.9

... More
Providing and laying RCC M-25 grade in approved surface using 20 mm size and down graded black hard granite crusher broken chips and sharp sand of approved grading from approved quarry for cement concrete work conforming to specification, mixing by concrete mixture, hoisting, leading and laying concrete in position, compacting with vibrator and curing for specified days by suitable means with cost, conveyance, taxes, royalty of all materials, supervision charges including mobilization and demobilization with cost of construction and dismantling of gangway and scaffolding, chute with all materials, approach road, diversion road, site illumination, hire and running charges of machineries required for the work with cost of all labour, T&P, B&OCWW cess but excluding GST etc. complete as per approved drawing and specification and as directed by Engineer-in-Charge. (but excluding cost of reinforcement steel)

35.1

-

5185.4

... More
Supplying, straightening, cutting, bending, binding and tying the grills using uncoated HYSD bars ( Fe-500) confirming to IS :1786 ( make TATA / SAIL) of designed diameters and placing in position, fabrication and fixing the reinforcement grills including laps, ties, providing chairs and welding whenever necessary with all leads, lifts and delifts with cost, conveyance of HYSD bars & binding wire of 18 to 20 gauge and cost of all labour, T&P, B&OCWW cess but excluding GST etc complete as per approved specification and direction of the Engineer -in- Charge.

30.62

-

7905

... More
Rigid smooth centering & shuttering for plain C.C / R.C.C. works including false works and dismantling then after specified days of casting, with cost, conveyance of all material, cost of all labour, T&P, cost of nail, B&OCWW cess but excluding GST etc. completeand as per approved specification and direction of the Engineer -in- Charge

1192.24

-

103.5

... More
Filling foundation and plinth with excavated materials laying in layers not exceeding 0.30M in depth including well watered and rammed with cost of all labour , T &P, B&OCWW cess but excluding GST etc. complete as per approved specification and direction of the Engineer -in- Charge.

161.06

-

103.6

... More
Supplying, laying & fixing in position 300mm dia R.C.C. NP3 Hume pipe with collar joint with cement mortar (1:3) including cost conveyance, royalty taxes of all materials including hume pipe,cost of all labour, T&P, B&OCWW cess (but excluding GST) etc. complete as per approved specification and direction of Engineer-in-Charge.

20

-

846.2

... More
Collecting, supplying and stacking of good quality moorum and sand in regular box heap size of 1.50m X 1.50m X 0.44m to be measured as one cum, conveying from stacks and admixing moorum and sand in (70:30) proportion and laying in sub-base of road in layers not exceeding 150 mm thick ,consolidation with P.R.R, with all leads , lifts and delifts including cost, conveyance, royalty of all materials, cost of all labour, T&P, hire and running charges of machineries, B&OCWW cess excluding GST etc.complete as per approved specification and direction of the Engineer-in-Charge.

319.25

-

943.6

... More
Collecting and supplying of approved quality of hard granite Grade-II Metal ( 63 mm to 45 mm.) and binding materials (moorum from approved querry and stacking at work site in regular stacks of 1.50 x1.50x 0.44 m to be measured as 1 cum for premeasurement inclduing cost, carriage, royality and all other taxes of all materials etc complete and conveying from stacks, spreading in layers and compacting stone aggreegates of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheeled Road Roller 8 to 10 Tonns in stage to proper grade and camber, applying and brooming requisite type screening binding materials to fill up the interstics of coarse aggregates, watering and compacting to the required density as per clause 404 of M.O.R.T & H specification of Road and Bridge work (4th Revision) complete with cost of all labour T&P, hire and running charges of machinery & equipments, B&OCWW cess but excluding GST etc complete as per approved specification and direction of the Engineer-in-charge.

140.63

-

2409.6

... More
Collecting and supplying of approved quality of hard granite IRC Grade-III Metal ( 53 mm to 22.40 mm. ) and binding materials (moorum from approved querry and stacking at work site in regular stacks of 1.50 x1.50x 0.44 m to be measured as 1 cum for premeasurement inclduing cost, carriage, royalty and all other taxes of all materials etc complete and conveying from stacks, spreading in layers and compacting stone aggreegates of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheeled Road Roller 8 to 10 Tonns in stage to proper grade and camber, applying and brooming requisite type screening binding materials to fill up the interstics of coarse aggregates, watering and compacting to the required density as per clause 404 of M.O.R.T&H specification of Road and Bridge work (4th Revision) complete with cost of all labour T&P, hire and running charges of machinery & equipments, B&OCWW cess but excluding GST etc complete as per approved specification and direction of the Engineer-in-charge.

140.63

-

2477.9



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.