Water Resources Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 2,33,300Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEBBS_109330_6Tender No
ACE-RHWC-03/2024-25Tender Authority
Water Resources Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation of any approved type of soil in approved borrow area by mechanical means, loading into and transportation by mechanical means and unloading the soil with lead of 3km on prepared surface including spreading and leveling the earth in 22.5 cm layers for all heights including construction, maintained watering and lightening of haul road and borrow area etc. including all lift,lead,delift & cost of machinary, labour, Material, T & P, royalty and all Taxes cess (excluding GST) etc complete and as per the direction of Engineer-In-Charge.
8134.5
155
1262474.4
... More
Providing laying spreading & compacting stone aggregates of IRC grade-II (63mm to 45mm) to water bound macadam specification including spreading in uniform thickness hand picking roiling with 3 wheeled steel roller 8-10 ton in stages to proper grade & camber applying & booming requisite type & screening/ binding materials to fill up the interstices of course aggregate watering & compacting to required density as per clause 404 of MORST&H etc including all lift,lead,delift & cost of machinary, labour, Material, T & P, royalty and all Taxes cess (excluding GST) etc complete and as per the direction of Engineer-In-Charge.
1485
3781
5615379
... More
Providing , laying, spreading and compacting stone aggregates using IRC Gr-III size granite metal to Water Bound Macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonne in stages to proper grade and camber, applying and brooming requisite type of screening / blinding materials as crusher dust to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of MoSRT&H Specifications for Road & Bridge works (4th Revision) including all lift,lead,delift & cost of machinary, labour, Material, T & P, royalty and all Taxes cess (excluding GST)etc complete and as per the direction of Engineer-In-Charge.
1588.5
3868
6145588.8
... More
Supplying & stacking good quality moorum at road sides in regular box heaps of ( 1.5m x 1.5m x 0.44m ) to be measured as one cum & conveying from stacks & spreading in uniform thickness on road surface including watering & rolling with P.R.R including all lift,lead,delift & cost of machinary, labour, Material, T & P, royalty and all Taxes cess (excluding GST) etc complete and as per the direction of Engineer-In-Charge.
6830.5
1103
7539505.9
... More
Earthwork excavation of foundation in hard soil or gravelly soil including rough dressing and breaking the clods to maximum 5 cm to 7 cm and laying in layers not exceeding to 0.30 m in depth including all lift,lead,delift & cost of machinary, labour, Material, T & P, royalty and all Taxes cess (excluding GST) etc complete and as per the direction of Engineer-In-Charge.
297.3
270
80538.57
... More
Filling in foundation and plinth with sand well watered and rammed including all lift,lead,delift & cost of machinary, labour, Material, T & P, royalty and all Taxes cess (excluding GST) etc complete and as per the direction of Engineer-In-Charge.
95.4
1436
137051.64
... More
Providing and laying cement concrete of M15 grade with 40mm and downgraded granite course aggregates with good quality sand for concrete lining of canal compacting with space vibrator and finishing the conc. surface including all lift,lead,delift & cost of machinary, labour, Material, T & P, royalty and all Taxes cess (excluding GST) etc complete and as per the direction of Engineer-In-Charge.
100.35
7698
772524.41
... More
Providing & laying RCC work of M20 grade with 20mm & down grade black hard granite stone chips with centering & shuttering including all lift,lead,delift & cost of machinary, labour, Material, T & P, royalty and all Taxes cess (excluding GST) etc complete and as per the direction of Engineer-In-Charge.
42.3
8798
372172.32
... More
Providing and laying cement concrete of M15 grade with 20mm and downgraded granite course aggregates with good quality sand for concrete including all lift,lead,delift & cost of machinary, labour, Material, T & P, royalty and all Taxes cess (excluding GST) etc complete and as per the direction of Engineer-In-Charge.
78.75
8002
630173.25
... More
Supply,fitting & placing uncoated HYSD bars reinforcement complete as per technical specification including all lift,lead,delift & cost of machinary, labour, Material, T & P, royalty and all Taxes cess (excluding GST) etc complete and as per the direction of Engineer-In-Charge.
32.61
8386
273490.29
... More
Rigid and smooth centering and shuttering for plain C.C/R.C.C works including removing the same after specified days of casting including all lift,lead,delift & cost of machinary, labour, Material, T & P, royalty and all Taxes cess (excluding GST)etc complete and as per the direction of Engineer-In-Charge.
263.82
247
65295.45
... More
Filling foundation and plinth with excavated earth including all lift,lead,delift & cost of machinary, labour, Material, T & P, royalty and all Taxes cess (excluding GST)etc complete and as per the direction of Engineer-In-Charge.
23.1
150
3476.55
... More
Providing and fixing 18mm/16mm thick joint filler (Bitumenous expansion joint board I.S.I) in position including all lift,lead,delift & cost of machinary, labour, Material, T & P, royalty and all Taxes cess (excluding GST)etc complete and as per the direction of Engineer-In-Charge. (Unit=RM)
21
515
10831.8
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%