Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 37,600Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Pid-90,restoration To Basantapur Minor From Rd 00 Km To 1.00 Km
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_CELBB_52960_19Bid Award Id
ViewTender No
EPROCUREMENT TENDER CALL NOTICE NO. PID07/2018-19Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://www.dowrodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying cement concrete M15 with 20mm downgraded hard granite chips for concrete lining to the bed and slopes of canal with sleeper beams, keys etc. free from weathered skin and other deleterious materials of approved quality of uniform colour and texture aggregate and sharp sand of approved grading and quality for CC work with all leads, lifts delifts including cost, carriage, royalties and taxes of all materials by suitable means mixing concrete by concrete mixer hoisting, laying in position and compacting with space vibrator or manually and finishing the concrete surface including trimming and dressing of canal bed and slopes with cutting trenches for sleeper beams, keys and drainage etc. including watering and compacting slopes and bed with hand ramming to proper profile and supplying and laying polythene film of 100 micron etc. complete asper direction of Engineer-in-Charge.
64.08
295551
4612.22
... More
Labour charges for straighting, cutting, bending , binding and tying the grils and placing in position for fabrication and finishing of reinforcement including topping when necessary including supply of binding wire 18 to 20 gauge with all leads, lifts from binding yard including cost, carriage of un coated HYSD bar confirming to Fe 415 grade including over lapping, and wastage, welding as per direction of Engineer-in-Charge.
36.33
175027
4817.72
... More
Rigid smooth centering and shuttering for RCC/CC work including false work and dismantling them after casting and removing the debris away from the working area and stacking the useful materials for reuse including cost, carriage, royalty and taxes of all materials with all labour to the site of work etc. complete asper direction of Engineer-in-ChargeRCC slab wall
207.76
120014
577.66
... More
Rigid smooth centering and shuttering for RCC/CC work including false work and dismantling them after casting and removing the debris away from the working area and stacking the useful materials for reuse including cost, carriage, royalty and taxes of all materials with all labour to the site of work etc. complete asper direction of Engineer-in-ChargeCC wall
15.6
1516
97.18
... More
Earth work in excavation of foundation of all kinds of soil with all leads, lifts and delifts including breacking clods maximum 5cm to 7cm in size and laying in layers not exceeding 0.30m in depth and levelling the bed and slope and deposited the earth aweay from the foundation trench etc. etc. complete asper direction of Engineer-in-Charge
64.95
8110
124.88
... More
Filling foundation and plinth with excavated materials including watering ramming with all labour and all T&P’s with all leads, lifts and delifts including cost carriage & royalty of all materials etc. complete asper direction of Engineer-in-Charge
52.58
20554
390.92
... More
Cement concrete (1:3:6) using 40mm size hard granite crusher broken metal free from weathered skin surface of uniform colour and texture from approved quarry and approved quality conferming to specification, mixing by concrete mixture including hoisting and laying concrete in position with all leads, lifts, and delifts including cost conveyance, royalty and taxes of materials including dewatering by suitable means, supplying T&P quaring for specified period with hire and running charges of machineries required for the work, construction and maintenance of coffer dam and approach road if required till completion of work etc. complete as per direction of Engineer-in-Charge.
17.44
75404
4323.66
... More
Cement concrete (1:2:4) using 12mm size hard crusher broken chips/aggregate free from weathered skin surface of uniform colour and texture from approved quarry and approved quality confirming to specification mixing by concrete mixture including hoisting and laying concrete in position with all leads, lifts and delifts including cost, conveyance, royalty and taxes of materials including dewatering by suitable means, supplying T&P quarrying for specified period with hire and running charges of mechaniries required for the work etc. complete as per direction of Engineer-in-Charge.
12.33
69069
5601.75
... More
Dismantling and removing RCC slab including stacking the useful materials for reuse and removing the debris away from the working area and stacking the useful materials for reuse including cost, carriage, royalty and taxes of all materials and with all labours to the site of work etc. complete asper direction of Engineer-in-Charge.
2.3
2404
1045.4
... More
Labour for laying and fixing in position of RCC spun Pipe 150mm dia NP2 with collars jointed with Cement mortar (1:3) including cost conveyance, royalty of all materials and curing including supply of hume pipes with cost, carriage and all taxes to the site of work including curing etc. complete as per direction of Engineer-in-Charge.
18
5909
328.32
... More
Providing and laying cement concrete M-15 with 20mm downgraded hard granite chips for concrete lining to the bed and slopes of canal with sleeper beams, keys etc. free from weathered skin and other deleterious materials of approved quality of uniform colour and texture aggregate and sharp sand of approved grading and quality for CC work with all leads, lifts delifts including cost, carriage, royalties and taxes of all materials by suitable means mixing concrete by concrete mixer hoisting, laying in position and compacting with space vibrator or manually and finishing the concrete surface including trimming and dressing of canal bed and slopes with cutting trenches for sleeper beams, keys and drainage etc. including watering and compacting slopes and bed with hand ramming to proper profile and supplying and laying polythene film of 100 micron etc. complete asper direction of Engineer-in-Charge.
261.75
1210633
4625.15