Water Resources Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 58,200Document Cost
₹ 10,000Tender Fee
Refer Documents
Summary
Improvement To Nibrutijore M.i.p In Tarava Block Of Subarnapur District Under Erm Scheme
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMIB_105528_1Bid Award Id
ViewTender No
SNPMI_1_2024_25Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Filling in Foundation with sand including watering and ramming as directed by the Engineer -in- Charge
74.4
53530
719.49
Cement concrete M 15 grade with crushed granite 20mm downgraded coarse aggregate of approved quality mixing by concrete mixer including hoisting, lowering & laying concrete in position to proper slope and level & compacting by vibrator in layers not exceeding 0.15m depth & finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty & other taxes of all materials labour T & P materials required for this item including hire and running charges of machineries complete as directed by the Engineer-in-charge.
291.74
1537236
5269.2
Reinforced Cement concrete M 20 grade with crushed granite 20mm downgraded coarse aggregate of approved quality mixing by concrete mixer including hoisting, lowering & laying concrete in position to proper slope and level & compacting by vibrator in layers not exceeding 0.15m depth & finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty & other taxes of all materials labour T & P materials required for this item including hire and running charges of machineries complete as directed by the Engineer-in-charge.
207.6
1198204
5771.7
Straightening, cutting, bending, binding, and tying of HYSD steel rod of approved specification laying the grills as per approved design & placing in position including cost,conveyance and other taxes complete in all respect including all leads and lifts from bending yard to placement spot wit supplying of labour and T&P required for the work etc complete .( Weight of binding wire will not be considered for payment purpose.)
143.47
1248992
8705.6
Providing removing rigid smooth centering & shuttering for R.C.C works including false work including cost, conveyance, rayalty & other taxes of all materials required for the work complete in all respect and dismantling the same after casting and proper curing including depositing the debris clear of work site with all leads & lifts delifts including supply of all labour & T & P required for the items etc. complete in all respect as directed by Engineer in charge.
1523.18
374093
245.6
Escavation in ordinary soil with all leads and lifts to proper section including dressing and levelling the bed to proper slope and level and depositing the excavated materials away from work site with all leads &lifts complete as directed by EIC.and ng the earth in 22.5 cm layer for all heights etc complete as per the direction of EIC ( measurment will be taken all finished level section)
4853.3
811762
167.26
Filling in Foundation and Plinth with Excavated marerials including watering and ramming as directed by the Engineer -in- Charge
818.4
122620
149.83
Fixing 20mm dia anchor bars in foundation rock including drilling 30mm dia holes fixing wedged anchor and grouting with cement mortar 1:4 complete as per direction of EIC including cost of M.S rod including pull testing of30% of anchors( Depth pf holes only measured for payment purposes)
160
69728
435.8
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements