Water Resources Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Water Resources Department - WRD Tender

Works
Civil And Construction
Civil Works Others
Excavation
Irrigation Work
Eprocure
Opening Date12 Sep 2024
Closing Date14 Oct 2024
Tender Amount₹ 27,47,72,455 
Notes
Download

Costs

Summary

Excavation Of Darpani Branch Canal From Rd 62.907km To Rd 65.890km

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation of Hard rock of all toughness in canal/foundation of structures and cutoff trench of earth dam and other deep cutting sections in wet, dry and submerged condition by mechanical drilling and appropriate blasting including all accessories, machine charges etc. with all lifts and delifts, loading into and transportation by transport vehicle and depositing the excavated materials neatly in specified dump yard with all leads,lifts & delifts and trimming of canal bed and slope/foundation of structures by manual/mechanical means to the designed finished section, dewatering wherever necessary with all cost and running charges of pumps and accessories and providing coffer dam including diverting the water away from the work site complete with all costs for site illumination, mobilisation, demobilisation, approach road, diversion road, coffer dam, royalty, cess, T & P etc. complete with all costs incidental to the work as per specification and direction of the Engineer-in-Charge. (Payment will be made on finished level section. Recovery of useful materials of all sizes will normally be 0.7 cum per cum of excavation measured in dump condition. In case of change of recovery due to rock condition, percentage is to be fixed by Chief Engineer-in-charge).

32505

11896830

366

... More
Excavation in all kinds of soil including moorum, stoney earth, gravel etc. excepting all kinds of rock and boulders exceeding 0.014 cum in volume for cut-off trenches out-fall drains,filter drains, etc. and for base stripping of seat of embankments in heavy banking section including dressing and levelling the bed and laying the excavated earth in layers not exceeding 0.225m in depth including breaking clods complete or removing the excavated earth away from the work site etc. including all leads, lifts and delifts and all cost incidental to the work, cess, T & P etc. complete as directed by the Engineer-in-Charge. (Payment will be made on finished level section )

12844

1051923

81.9

... More
Excavation of Hard compact laterite rock of all toughness in canal/foundation of structures and cutoff trench of earth dam and other deep cutting sections in wet, dry and submerged condition by means of Rock Breaker including all accessories, machine charges etc. with all lifts and delifts, loading into and transportation by transport vehicle and depositing the excavated materials neatly in specified dump yard with all leads,lifts & delifts and trimming of canal bed and slope/foundation of structures by manual/mechanical means to the designed finished section, dewatering wherever necessary with all cost and running charges of pumps and accessories and providing coffer dam including diverting the water away from the work site complete with all costs for site illumination, mobilisation, demobilisation, approach road, diversion road, coffer dam, royalty, cess, T & P etc. complete with all costs incidental to the work as per specification and direction of the Engineer-in-Charge.(Payment will be made on finished level section )

392303

103081536

262.76

... More
Watering earth work up to OMC condition, rolling and compacting by vibratory roller and dozer, in layers not exceeding 22.50 cm in canal embankment fill of all heights with all leads, lifts, delifts including specified proud section at optimum moisture content to achieve the required compaction of 95% dry density including hire and running charges of all machineries, mobilisation, demobilisation, approach road, diversion road, site illumination, royalty, cess, labour, water, T&P etc. with all costs incidental to the work complete as per drawing, specification and the direction of the Engineer-in-Charge. (Measurement to be taken on the finished compacted section of the fill under OMC condition. Payment will be made on finished level section)

53072

1783219

33.6

... More
Fine dressing of earthwork in slopes including filling of earth in rain cuts and slopes with selected earth at contractors own cost duly compacted and trimmed to the required profile and turfing with dub sods of rectangular shape of minimum 6.25cm thick, conveyance by manual/mechanical means with all leads, lifts and delifts with royalty, cess including mobilisation, demobilisation, supervision charges with cost of all other materials, approach road, diversion road, site illumination etc. laying, trimming to proper design section as per approved drawings and specifications including watering the sods till survival of grass etc. complete with all costs incidental to the work as per the direction of the Engineer-in-Charge. (Measurement will be taken after survival of grass)

13311

427283

32.1

... More
Providing and laying plain/reinforced cement concrete confirming to M-15 grade in approved surface using 20mm size and down graded hard granite well graded crusher broken stone aggregate, sharp sand and cement of approved grading and quality confirming to the specification, mixing in concrete mixer/batching and mixing plant with all leads, lifts, delifts and transportation by mechanical/manual means including cost, carriage, royalty, cess etc. of all materials including dewatering by suitable means with all costs, vibrating concrete by mechanical means, supplying all T&P, curing for specified days by suitable means, supervision charges including mobilisation and demobilisation with cost of construction and dismantling of gangways and scaffolding, chute, coffer dam with all materials, hire and running charges of machineries required for the work, approach road, diversion road and site illumination etc. complete as per approved drawings and specification with all costs incidental to the work and as directed by the Engineer-in-Charge.

492.41

2860163

5808.5

... More
Providing and laying plain/reinforced cement concrete confirming to M-20 grade in approved surface using 20mm size and down graded hard granite well graded crusher broken stone aggregate, sharp sand and cement of approved grading and quality confirming to the specification, mixing in concrete mixer/batching and mixing plant with all leads, lifts, delifts and transportation by mechanical/manual means including cost, carriage, royalty, cess etc. of all materials including dewatering by suitable means with all costs, vibrating concrete by mechanical means, supplying all T&P, curing for specified days by suitable means, supervision charges including mobilisation and demobilisation with cost of construction and dismantling of gangways and scaffolding, chute, coffer dam with all materials, hire and running charges of machineries required for the work, approach road, diversion road and site illumination etc. complete as per approved drawings and specification with all costs incidental to the work and as directed by the Engineer-in-Charge.

5738.67

35536713

6192.5

... More
Providing and laying plain/reinforced cement concrete confirming to M-25 grade in approved surface using 20mm size and down graded hard granite well graded crusher broken stone aggregate, sharp sand and cement of approved grading and quality confirming to the specification, mixing in concrete mixer/batching and mixing plant with all leads, lifts, delifts and transportation by mechanical/manual means including cost, carriage, royalty, cess etc. of all materials including dewatering by suitable means with all costs, vibrating concrete by mechanical means, supplying all T&P, curing for specified days by suitable means, supervision charges including mobilisation and demobilisation with cost of construction and dismantling of gangways and scaffolding, chute, coffer dam with all materials, hire and running charges of machineries required for the work, approach road, diversion road and site illumination etc. complete as per approved drawings and specification with all costs incidental to the work and as directed by the Engineer-in-Charge.

3654

23955624

6556

... More
Providing and laying plain/reinforced cement concrete confirming to M-30 grade in approved surface using 20mm size and down graded hard granite well graded crusher broken stone aggregate, sharp sand and cement of approved grading and quality confirming to the specification, mixing in concrete mixer/batching and mixing plant with all leads, lifts, delifts and transportation by mechanical/manual means including cost, carriage, royalty, cess etc. of all materials including dewatering by suitable means with all costs, vibrating concrete by mechanical means, supplying all T&P, curing for specified days by suitable means, supervision charges including mobilisation and demobilisation with cost of construction and dismantling of gangways and scaffolding, chute, coffer dam with all materials, hire and running charges of machineries required for the work, approach road, diversion road and site illumination etc. complete as per approved drawings and specification with all costs incidental to the work and as directed by the Engineer-in-Charge.

306

2012806

6577.8

... More
Providing form work for concrete with F-1 finish in canal structures for PCC/RCC work using steel shuttrer plates of approved specifications for all surface including supply of shutter plate and all other materials, T&P, labour and transportation of shuttering materials by mechanical/ manual means, dismantling & removing of form work, making good to the surface where ever necessary and finishing complete with all cost for mobilisation and demobilisation, construction & maintenance of coffer dam, diversion road, approach road & site illumination and royalty, cess, etc.with all leads, lifts & delifts including all costs incidental to the work complete as per specification and direction of the Engineer-in-Charge.

16241.03

14480502

891.6

... More
Rigid and smooth centering and shuttering at all heights of trough and road slab of aqueduct ,bridges, deck slab and soffit slabs using required nos of pylons for vertical supports of scaffolding, centering and shuttering with joists, N.G. rails and channels and shuttering plates including welding ,bolting, cost, conveyance, royalty and all other charges with all leads, lifts & delifts of all materials, labour and cost of scafolding gangway etc. including cost , conveyance of dismantling and depositing debris clear of work site complete to receive reinforcement grill and concrete as per requirement, making good to the surface where ever necessary and finishing complete with all cost for mobilisation and demobilisation, construction and maintenance of coffer dam, diversion road, approach road, site illumination and royalty, cess, etc. including all costs incidental to the work complete as per specification and direction of the Engineer-in-Charge.

1542

2790557

1809.7

... More
Supplying, providing and straightening the coiled or bent up uncoated HYSD bars, cutting, bending and placing the grills in position with ties, chairs, spacers and binding with binding wire 18 to 20 gauge, lapping, splicing, welding the joints where ever necessary for R.C.C works as per approved design, drawing with all costs, conveyance, cess, royalty etc.with all leads, lifts & delifts of the reinforcement bars, binding wire and all other materials with cost for mobilisation, demobilisation, construction and maintenance of diversion road, approach road and site illumination etc. with all costs incidental to the work complete as per specification and direction of the Engineer-in-Charge. (Weight of binding wire, overlapping, wastage, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire for binding and placing shall not be considered for measurement & payment in any shape at all)

5386.22

47227454

8768.2

... More
Providing P.V.C. water stop for structures/drainage gallery as per approved design including fixing in proper alignment and jointing with araldite etc. including cost, conveyance, royalty, etc.with all leads,lifts & delifts of PVC water stop and all other materials complete as per specifications and direction of the Engineer-in-Charge.

629

717248

1140.3

... More
Providing weep holes in masonry/plain/reinforced concrete abutment, wing wall/return wall etc. of specific size with 100mm dia AC/ PVC Pipe, extending through the full width of the structure with slope 1V:20H towards drowning face at regular intervals as per the approved design, drawing and tehnical specification including cost, conveyance, royalty, cess with all leads ,lifts & delifts of all materials required for the work and including cost of inverted filter packing in rear side of the walls as per specification with all costs, labour, T&P etc. with all costs incidental to the work complete as directed by the Engineer-in-Charge.

1171.4

114328

97.6

... More
Rough stone dry packing in aprons and revetments, slopes of embankment including collecting, supplying quarried and blasted hard stones of approved quality of 0.025cum or above in volume and size not less than 17.50 cm in any direction to the required shape, transporting mechanically/manually including filling the interstices with quarried broken stone spalls with all leads, lifts and delifts including cost, carriage, royalty etc. of all materials, dressing of earthwork in bed and slopes, filling the rain cuts and slips with compact earth and trimming to the required profile and grade including dewatering if required with all charges complete with all costs of mobilisation, demobilisation, site illumination, construction and maintenance of approach road ,diversion road, T&P, labour, cess etc. and with all costs incidental to the work complete as per the direction of the Engineer-in-Charge.

60

137844

2297.4

... More
Filling foundation and plinth with sand by mechanical/ manual means and laying in layers including watering, ramming and compacting by suitable means with all leads, lifts and delifts, royalty, cess etc. and all cost incidental to the work complete as per the direction of the Engineer-in-Charge.

18.41

20059

1089.6

... More
Filling foundation and plinth with selected excavated materials by mechanical/manual means and laying in layers including watering, ramming and compacting with all leads, lifts and delifts including labour, cess, T&P and all cost incidental to the work etc. complete as per the direction of the Engineer-in-Charge.

14747

805186

54.6

... More
Collecting, supplying, admixing and laying approved quality of sand and moorum admixture (1:2) in sub-base in layers not exceeding 100 mm thickness, watering and compacting to the required density in OMC with PRR including cost, conveyance, royalty and all other charges with all leads, lifts & delifts of all materials, labour, cess, T&P etc. complete including hire & running charges of PRR and all other charges incidental to the work etc. complete as per the direction of the Engineer-in-Charge ( Payment will be made on finished level section )

1745

3333997

1910.6

... More
Supplying and laying R.C.C Spun Pipes NP-3 of 1000 mm dia and collar jointing with necessary twisted and coal-tarred hemp yarn including caulking and filling with cement mortar 1:1/flush jointing as per drawing and specification and finishing smooth and curing including cost,conveyance royalty, cess etc. of all materials and with all leads,lifts and delifts etc. complete as directed by the Engineer-in- charge.

15

97212

6480.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.