Water Resources Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Water Resources Department - WRD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date11 Jul 2024
Closing Date12 Aug 2024
Tender Amount₹ 38,39,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing rigid shuttering with the box type steel shuttering plates with keys for intermediate construction joints in rafts of weirs, barrages, and dam blocks including cost of materials,labour ,T&P etc. complete as directed by the Engineer-in-charge.

106.2

-

291.1

... More
R.S dry packing in appron and revetments & slopes of dam and dyke with h.g stone 30 cm and above size of approved quality including filling the interstices with small stone to proper slope and level with cost, conveyance, rayality and other taxes of all materials , labour and T&P required for the item complete as directed by the Engineer in charge.

654.5

-

2096.8

... More
6 mm thick cement plaster (1:4) over brick work finished smooth after racking out joints 1/2" deep including watering & curing for required period including cost, conveyance, royalty of all materials ,labour and T & P required for the item complete as directed by engineer in charge.

336

-

181.1

... More
Filling the foundation and plinth with excavated earth including watering and ramming properly,with cost of all labour, t&p reqd. for the item complete and as directed by the Er. In charge.

22.03

-

149.8

... More
Supplying, Laying and fixing 110mm dia PVC pipes of approved quality for outlets including cost, conveyance of pipes to the work site with cost of all other materials and supply of all labour and T&P required for the work etc. complete in all respect as directed by Er. In charge

25

-

934.2

... More
Providing,Supplying, Stacking for premeasurement & Speading moorum and consolidation with HRR including watering, cost of moorum and conveyance of moorum etc complete required for the item as per direction of Engineer incharage

548.45

-

1049.2

... More
Earth work in ordinary soil with all leads, lifts and delifts including dressing and levelling the bed to the design profile as per direction of the Engineer-in-charge. (Measurement will be taken on the finished level section )

1738.5

-

167.3

... More
Earth work in hard soil with all leads and lifts including rough dressing and breaking clods to maximum 5 cm to 7cm , laying in layers not exceeding 0.30m in depth including rayality of earth etc completed as per the direction of Engineer in charge. (Measurement will be taken on the finished level section and 1/6 voids volume will be deducted towards settlement of earth in filling section )

1561.88

-

315.9

... More
Fine dresing & turfing the slopes of the dam or dyke including filling of rain cuts and slopes with selected earth duly compacted and trimmed to required profile and turfing with approved quality of compact dub grass including collection and supply of the same from approved site including loading & unloading, conveyance charges royalty of all materials with all leads, lifts & delifts as per the approved drawing, specification including mobilization & demobilization including supplying of all machineries & equipments and their running, maintenance charges, inclusive of materials and labour required the work, supervision charges, cost of watering & making arrangement for survival of grass till its growth etc. completed as directed by Engineer-in-Incharge (Measurement will be taken after full survival of grass turf)

3500

-

40.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.