Water Resources Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Water Resources Department - WRD Tender

Civil And Construction
Road Construction
Opening Date31 Jan 2019
Closing Date11 Feb 2019
Tender Amount₹ 17,83,379 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Pid-89,improvement To Budhanga Distributary From Rd 12.500 Km To 17.700 Km

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation of foundation in all kinds of soil by manual/Mechanical means with all leads, lifts & delifts including leveling and dressing the foundation bed & slope upto design bed level and depositing the excavated earth away from the working area including breaking clods maximum 5cm to 7cm in size and laying in layers not exceeding 0.30mtr. in depth including bailing out water and dewatering if requred etc. complete as per direction of Engineer-In-Charge

133.7

16696

124.88

... More
Earth work in excavation of foundation of all kinds of soil with all leads, lifts and delifts including breacking clods maximum 5cm to 7cm in size and laying in layers not exceeding 0.30m in depth and levelling the bed and slope and deposited the earth aweay from the foundation trench etc. etc. complete asper direction of Engineer-in-Charge

411.6

42835

104.07

... More
Filling foundation and plinth with sand including watering & ramming with all labour and T&P’s with all leads, lifts and delifts including cost carriage & royalty of all materials etc. complete asper direction of Engineer-in-Charge

6.08

3889

639.78

... More
Cement concrete (1:3:6) using 40mm size hard granite crusher broken metal free from weathered skin surface of uniform colour and texture from approved quarry and approved quality conferming to specification, mixing by concrete mixture including hoisting and laying concrete in position with all leads, lifts, and delifts including cost conveyance, royalty and taxes of materials including dewatering by suitable means, supplying T&P quaring for specified period with hire and running charges of machineries required for the work, construction and maintenance of coffer dam and approach road if required till completion of work etc. complete as per direction of Engineer-in-Charge.

8.11

37834

4665.13

... More
Cement concrete (1:3:6) using 25mm size hard granite crusher broken metal free from weathered skin surface of uniform colour and texture from approved quarry and approved quality conferming to specification, mixing by concrete mixture including hoisting and laying concrete in position with all leads, lifts, and delifts including cost conveyance, royalty and taxes of materials including dewatering by suitable means, supplying T&P quaring for specified period with hire and running charges of machineries required for the work, construction and maintenance of coffer dam and approach road if required till completion of work etc. complete as per direction of Engineer-in-Charge.

25.4

126207

4968.8

... More
Rigid smooth centering and shuttering for RCC/CC work including false work and dismantling them after casting and removing the debris away from the working area and stacking the useful materials for reuse including cost, carriage, royalty and taxes of all materials with all labour to the site of work etc. complete asper direction of Engineer-in-Charge.

32.4

3146

97.11

... More
Providing and laying cement concrete M15 with 20mm downgraded hard granite chips for concrete lining to the bed and slopes of canal with sleeper beams, keys etc. free from weathered skin and other deleterious materials of approved quality of uniform colour and texture aggregate and sharp sand of approved grading and quality for CC work with all leads, lifts delifts including cost, carriage, royalties and taxes of all materials by suitable means mixing concrete by concrete mixer hoisting, laying in position and compacting with space vibrator or manually and finishing the concrete surface including trimming and dressing of canal bed and slopes with cutting trenches for sleeper beams, keys and drainage etc. including watering and compacting slopes and bed with hand ramming to proper profile and supplying and laying polythene film of 100 micron etc. complete asper direction of Engineer-in-Charge.

244.37

1176883

4815.99

... More
Providing good quality sand & gravel / moorum backing to CC lining apron and revetment and spreading to proper slope and level with all leads, lifts and delifts with cost of watering, ramming etc. including cost, carriage, royalty and all other taxes etc. complete as per the direction of the Engineer-in-Charge.

205.8

215499

1047.13

... More
Labour for laying and fixing in position of RCC spun Pipe NP3 900mm dia with collars jointed with Cement mortar (1:3) including cost conveyance, royalty of all materials and curing including supply of hume pipes with cost, carriage and all taxes to the site of work including curing etc. complete as per direction of Engineer-in-Charge.

15

42748

2849.87



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.