Water Resources Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Water Resources Department - WRD Tender

Works
Civil And Construction
Eprocure
Opening Date2 Feb 2024
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Removing old revetment and aprons and repacking with Departmental stone of approved quality including filling the interstices with small stone to proper slope and level with cost, conveyance and other taxes of all materials , labour and T&P required for the item complete as directed by the Engineer in charge. (1/6 voids volume will be deducted from the quantity)

142.5

-

1235.6

... More
Collecting, supplying, stacking good quality moorum of approved quality free from all deleterious materials including cost of loading and unloading with cost, conveyance, royalty and all other taxes with all lead, lift and delifts and spreading the same upto required height over compacted earth with all labour and T&P materials required for the item etc complete as directed by the Engineer - in - charge.

135

-

1133.7

... More
Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area on pre-measurement required etc. with supply of all labour and T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge.

4505.68

-

2.1

... More
Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris with all leads & lifts including all labour, T & P required for the item complete in all respect as per direction of the Engineer-in-charge.

52.03

-

1228

... More
Excavation of foundation to proper profile in all kinds of soil with all leads and lift including dressing and leveling the bed to proper slope and level and making it fit for laying concrete with disposal of the excavated materials with spoil bank, depositing the excavated materials clear of work site within all leads and lifts etc including dewatering from foundation if necessary etc with supply of all labour, all taxes as per prevailing norm and T&P required for the work etc complete in all respects as directed by the Engineer-in-charge. (If mechanically done rates will be reduced accordingly)

61.86

-

211

... More
Filling in foundation & plinth with course sand well watered and rammed to proper layer & level, dewatering if required for the work with all cost, conveyance, royalty & taxes of all materials with all labour, required for the item complete in all respect as directed by the Engineer-in-charge.

11.21

-

1227.7

... More
Providing Cement Concrete M-15 grade with nominal reinforcement (excluding cost of M.S. rod carriage and labour for cutting, binding, binding and fixing of M.S. rod) using 20mm down grade crusher broken hard granite stone aggregate of approved quality quarried free from weathered skin, quarry debris and foreign materials using clean and sharp sand of approved grading and quality confirming to the design specification including hoisting, lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with Vibrators and finishing the exposed surface smooth including watering, curing for required period providing beads and grooves wherever necessary including cost, conveyance, royalty and other taxes of all materials with all cost of tools & plant, cost and carriage of water etc with supply of all labour, taxes as per prevailing norm and supervision charges including mobilisation and de-mobilisation of men & machineries, T&P with all incidental charges required for the work complete in all respect as directed by the Engineer-in-charge.

58.79

-

5754.7

... More
Providing Cement Concrete M-20 grade for RCC works on approved surface or shape and size using 20mm down grade crusher broken hard granite stone aggregate of approved quality quarried free from weathered skin, quarry debris and foreign materials using clean and sharp sand of approved grading and quality confirming to the design specification including hoisting, lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with Vibrators and finishing the exposed surface smooth including watering, curing for required period providing beads and grooves wherever necessary including cost, conveyance, royalty and other taxes of all materials with (excluding cost of M.S. rod carriage and labour for cutting, binding, binding and fixing of M.S. rod) all cost of tools & plant, cost and carriage of water etc with supply of all labour, taxes as per prevailing norm and supervision charges including mobilisation and de-mobilisation of men & machineries, T&P with all incidental charges required for the work complete in all respect as directed by the Engineer-in-charge.

17.61

-

6187.3

... More
Supplying, Straightening, cutting, bending , binding and tying the grills and placing HYSD bars reinforcement in position as per approved design & drawing for fabrication and fixing of reinforcement including lapping where necessary including cost, conveyance & supply of binding wires of 18 to 20 gauge with supply of all labour , with all leads, lifts from bending yard to placement spot with cost & conveyance and all taxes of steel bars of any reinforcement supplying all labour and T & P required for the work etc. complete in all respect as directed by the Engineer-in-charge. (weight of the binding wire will not be included in the measurement of for payment)

6.92

-

8822.8

... More
Providing rigid smooth centering & shuttering (with box type steel shuttering plates with keys for intermediate construction joints in rafts, wherever required) for concrete works as per site requirement including falsework and including cost, conveyance, royalty & other taxes of all materials required for the work complete in all respect and dismantling the same after casting and curing with water for specified period including depositing the debris clear of work site with all leads & lifts, delifts including supply of all labour, all taxes as per prevailing norm and T&P required for the items etc complete in all respect as directed by Engineer-in-charge (for Foundation, Plinth band and footing bases of columns mass concrete pre cast slab, walls and fins including attached pilasters, floor & roof slab, landings, balconies, projecting sun shades, chajjas upto 4.30M etc )

306.08

-

247.5

... More
Filling in foundation & plinth with excavated materials including watering and ramming to all heights with all leads & lifts with supply of all labour, all taxes as per norm and T&P required for the work etc complete in all respects as directed by the Engineer-in-charge.

20.62

-

117.2

... More
Earth work in all kinds of soil with all leads and lifts to proper slope and profile as per the requirement including the rough dressing and disposing off the soil at designated place marked for the purpose (Filling of low lying areas only to avoid all types of environment hazards) alongwith supply of all labour and tools & plants, all materials, labour including all taxes as per prevailing norm & supervision charges to complete the item of work and as per the direction of the Engineer-in-charge. (comparison of Measurement will be made both at excavated area & dump area for tallying the quantity ,if mechanical excavation is adopted the rate will be reduce accordingly and measurement will be taken on the finished level section and 12.5 voids volume will be deducted towards settlement of earth in filling section )

176.1

-

175.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.