Water Resources Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 14,35,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_CELBB_49340_1Bid Award Id
ViewTender No
CELMB NMPD 06 of 2018-19Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://www.dowrodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Fine dressing of earth work in slope of embankment including filling of earth of rain cuts and slopes with selected earth at contractors own cost and duly compacted and trimmed to the required profile and turfing with dub sods of rectangular shape of minimum 8.0 cm to 10.0 cm thick with cost, conveyance with all leads, lifts and delifts ,cess including mobilisation, demobilisation, supervision charges with cost of all other materials, approach road, diversion road, site illumination including watering the sods till survival of grass with all cost incidental to the work complete as per specifications and the direction of the Engineer-in-Charge. (Measurement will be taken after survival of grass).
17100
379620
22.2
Quarrying, collecting, supplying blasted hard granite stone boulder of 30 cm and above size from approved quarry free from weather skin surface and other deleterious materials, packing the stones in rip raps and slope protection works in river embankments to required profile in all heights and depths including filling the interstices with small stones, wedging and hammering using 5 Kg hammer including fixing wave breakers with all cost, conveyance,labour,T and P required for the work, royalty, cess, hire and running charges of machineries and transportation of all materials of approved quality with all leads, lifts, delifts handling and re-handling charge including all other incidental charges required to complete the work as per the specification and direction of the Engineer-in-charge. (Measurement will be taken on finished level sections)
7479
12715795
1700.2
Quarrying, collecting, supplying blasted hard granite stone boulder of 30 cm and above size , 0.028 cum in volume from approved quarry (other than laterite, sand stone) materials, dumping the stones in rip raps,spur, and slope protection works including surface packing in all heights and depths including filling the interstices with small stones ,wedging and packing surface to proper line levels including fixing wave breakers including cost, conveyance,labour, T & P required for the work, royalty, cess of all materials of approved quality with all leads, lifts, delifts including dumping in water, hire charges of boat with boatman and, lunch with driver and all other incidental charges complete as per specification and direction of the Engineer-in-charge.
37634.87
56836180
1510.2
(Measurement to be taken in level section & 1/6th voids will be deducted from the finished level section and payment will be made to the quantity so arrived between the stack measurement and level section after deduction of 1/6th voids, which ever is less)
-
-
-
Earth work in excavation of foundation of structures by manual means in all kinds of soil including stoney earth mixed wth gravel in both wet and dry condition including jungle clearance, removal of stumps, shoring, shuttering & proping bullah , dewatering the foundation, providing coffer dam, diverting the water away from the structure if required,levelling and dressing the slopes and bed and depositing the excavated materials away from the working area / in the embankment section in layers not exceeding 15 cm in depth and breaking clods to maximum 5 cm. to 7 cm. size with all leads, lifts, delifts, handling and rehandling charges complete including construction and maintenance of approach road, diversion road, T and P, cess including mobilisation and demobilisation of men and machineries with all cost of incidental charges complete as per drawing ,specification and the direction of Engineer-in-Charge.
787.43
78775
10004.1
Earth work in excavation of foundation in slucy soil ( in water up to 0.60 m depth requiring the aid of pan and vessels ) by manual means including levelling and dressing the bed and depositing the excavated earth away from the working area with with all leads, lifts, delifts, handling and rehandling charges etc.complete including construction and maintenance of approach road, diversion road, T and P, cess including mobilisation and demobilisation of men and machineries with all cost of incidental charges complete as per drawing ,specification and the direction of Engineer-in-Charge.
4908.38
675182
13755.7
Providing double under reamed pile foundation of 375 mm dia excluding the labour charges for bending and binding and cost of reinforcement upto required depth from the specified level made of RCC M30 grade using 20 mm hard granite crusher broken chips from approved quarry free from weathered skin dust and other deleterious materials including mixing in concrete mixture, hoisting and laying concrete with all lead lifts and delifts and placing over scientifically approved surface , supplying T&P including watering and curing for specified days with cost of all materials, carriage ,royalty ,labour cess, hire and running charges machineries dewatering by suitable means , approach roads, diversion roads , including quality control tests as per the specification and direction of Engineer-in-charge.
-
-
-
Double under reamed pile of 9.60 m depth
64
736480
11507.5
Double under reamed pile of 9.00 m depth
80
874264
10928.3
Providing and laying Cement concrete M15 for CC work with 20 mm down graded hard granite crusher broken chips from approved quarry free from weathered skin dust and other deleterious materials including mixing in concrete mixture, hoisting and laying concrete with all lead lifts and delifts and placing over scientifically approved surface ,compaction by vibration of concrete by mechanical means supplying T&P including watering and curing for specified days with cost of all materials, carriage ,royalty ,labour cess, hire and running charges machineries dewatering by suitable means , construction of coffer dams/approach roads, diversion roads, diverting the water away from the structure including quality control tests as per the specification and direction of Engineer-in-charge.
155.75
720343
4625
Supplying, driving and fixing Z type sheet pile cutoff including fabrication and welding as specified in the approved drawings with interlocking arrangements in sheet piles and jointing the sheet piles by welding if necessary including cost and conveyance of sheet piles to the work site and driving them to proper level as per drawing and specification including mobilisation and demobilisation , dewatering including incidental charges with labour cess ,lighting arrangements complete as per the specification and direction of Engineer-in-charge.
659.39
5359851
8128.5
Providing and laying Reinfoced Cement concrete M30 for CC work with 20 mm down graded hard granite crusher broken chips from approved quarry free from weathered skin dust and other deleterious materials including mixing in concrete mixture, hoisting and laying concrete with all lead lifts and delifts and placing over scientifically approved surface ,compaction by vibration of concrete by mechanical means supplying T&P including watering and curing for specified days with cost of all materials, carriage ,royalty ,labour cess, hire and running charges machineries dewatering by suitable means ,approach roads, diversion roads ( excluding labour charges for bending and biding and cost of reinforcement steel) including quality control tests as per the specification and direction of Engineer-in-charge.
967.78
5246432
5421.1
Providing and laying Reinfoced Cement concrete M25 for CC work with 20 mm down graded hard granite crusher broken chips from approved quarry free from weathered skin dust and other deleterious materials including mixing in concrete mixture, hoisting and laying concrete with all lead lifts and delifts and placing over scientifically approved surface ,compaction by vibration of concrete by mechanical means supplying T&P including watering and curing for specified days with cost of all materials, carriage ,royalty ,labour cess, hire and running charges machineries dewatering by suitable means ,approach roads, diversion roads ( excluding labour charges for bending and biding and cost of reinforcement steel) including quality control tests as per the specification and direction of Engineer-in-charge.
31.27
168861
5400.1
Providing and laying Reinfoced Cement concrete M20 for CC work with 20 mm down graded hard granite crusher broken chips from approved quarry free from weathered skin dust and other deleterious materials including mixing in concrete mixture, hoisting and laying concrete with all lead lifts and delifts and placing over scientifically approved surface ,compaction by vibration of concrete by mechanical means supplying T&P including watering and curing for specified days with cost of all materials, carriage ,royalty ,labour cess, hire and running charges machineries dewatering by suitable means , construction of coffer dams/approach roads, diversion roads, diverting the water away from the structure , diversion roads ( excluding labour charges for bending and biding and cost of reinforcement steel) including quality control tests as per the specification and direction of Engineer-in-charge.
3836
19530610
5091.4
Supplying, fitting and placing HYSD tor steel reinforcement bars of required dia of approved quality with straightening ,cutting ,bending ,binding and tying and placing in position including cost of rod and binding wire of 18 to 20 gauge and carriage charges, labour , etc complete including all incidental charges with labour cess in all heights and depths as per approved drawing , specification and direction of Engineer-in-charge. (Measurement will be taken and quantity will be derived as per the standard weight )
808.61
4883438
6039.3
Rigid & smooth centring, shuttering for RCC works including false works and dismantling them after casting including proper curing with cost,T & P,carriage,including all incidental charges with labour cess in all heights and depths as per approved drawing , specification all complete as per specification and direction of Engineer-in-Charge.
2926
258073
88.2
Providing form work for concrete with F2 finish with steel shutters or plywood shutters including supply of rigid tie and supports with all labour, material , T&P including all incidental charges with labour cess in all heights and depths as per approved drawing , specification all complete as per specification and direction of Engineer-in-Charge. (Abrupt surface irregularities over 5 mm & gradual over 10 mm measured with 1.50 mtr template is not permitted)
1498.19
707894
472.5
Providing form work for concrete with F1 finish for with steel shutters rigidly fixed and removal forms and making good to the surfaces where necessary with all labour, material , T&P including all incidental charges with labour cess in all heights and depths as per approved drawing , specification all complete as per specification and direction of Engineer-in-Charge.
11375
5035712
442.7
Collecting and supplying of 125 mm diameter sal bullah of 5.50 m long for pilling and fixing in position for construction of coffer dam with all cost, T&P, conveyance, cess complete as per approved specification and direction of Engineer-in-Charge.
1137
84285
74.13
Labour for driving of 125mm bullah to required depth , T&P reqired for the work with all incidental charges, labour cess , all complete as per specification and direction of Engineer-in-Charge.
816
25867
31.7
Filling empty cement gunney bags (HDPE) with filling sand and sewing and laying under water in position for coffer dam including cost of gunney bags sewing string and cost of sand with conveyance and royalty of all materials to site with all leads,lifts and delifts with cost of all labour,T & P, hiring and running charges of all machineries, cess complete in all respect and removing from site after completion of structure work and as per direction of Engineer-in-Charge.
6492
142174
21.9
Filling foundation and plinth with excavated earth by manual means and laying in layers duly compacted, watering including cost,T & P,carriage, royalty with all leads, lifts, delifts, cess all complete as per drawing and specification and as per the direction of Engineer-in-Charge.
2600
144505
5557.9
Removing old revetment and aprons and stacking the useful materials for reuse and removing the debries away from the work site and repacking with old stones with filling the interstices with small stones including all costs of labour, T&P, labour cess, hire charges of machineries and incidental charges required to complete the work in all respect as per the direction of Engineer-in-Charge.
81
63026
778.1
Scarifying of existing bituminous road surface to a depth of 50mm and depositing the scarified materials away from the working area with all leads, lifts, delifts, cost of labour,cost of hire & running charges of all machineries, T and P,cost of fuel, lubricants, cess complete as per direction of Engineer-in-Charge.
6000
21000
3.5
Removing soling of road surface and stacking the available good and useful materials within 50 mtr clear of the work site with all leads, lifts and delifts and labour cess complete in all espects as per specification and direction of the Engineer-in-Charge.
1800
331380
184.1
Quarrying, collecting, supplying and stacking of good quality of moorum and sand in regular box heap size of 1.50m X 1.50m X 0.50m to be measured as one cum and admixing moorum and sand in (70 : 30) proportion and laying in sub-base of road in layers not exceeding 150 mm thick with all leads , lifts and delifts including cost,conveyance, royalty,cess including hire charges of T&P materials required for the work , watering and consolidation with P.R.R. , hire and running charges of machineries complete as per specification and direction of the Engineer-in-Charge.
1984.38
2283029
1150.5
Providing and laying , spreading and compacting stone aggregates to 100 mm thickness with IRC grade - I material ( 90 mm to 45 mm ) to WBM specification including spreading in uniform thickness , hand packing , rolling with 3 wheeled steel roller 8-10 tones in stages to proper grade and camber , applying and brooming using moorum as binding materials to fill up the interstices of coarse aggregates, watering and compacting to the required density as per clause 404 of MoSRT & H specifications for road & Bridge works (4th Revision) with all leads , lifts and delifts including cost ,conveyance, royalty, cess including cost of labours ,T&P materials required for the work, hire and running charges of machineries complete as per specification and direction of the Engineer-in-Charge.
952.5
2355246
2472.7
Filling foundation and plinth with sand by manual means and laying in layers duly compacted, watering including cost,T & P, carriage, royalty with all leads, lifts, delifts , cess all complete as per approved drawing and specification and as per the direction of Engineer-in-Charge.
943.21
629404
667.3
Providing and laying Cement concrete M15 for CC work with 40 mm down graded hard granite crusher broken metal/chips from approved quarry free from weathered skin dust and other deleterious materials including mixing in concrete mixture, hoisting and laying concrete with all lead lifts and delifts and placing over scientifically approved surface ,compaction by vibration of concrete by mechanical means supplying T&P including watering and curing for specified days with cost of all materials, carriage, royalty ,labour cess, hire and running charges machineries dewatering by suitable means ,approach roads, diversion roads , including quality control tests as per the specification and direction of Engineer-in-charge.
975
4278787
4388.5
Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris away from the work site and depositing at any specified space with all leads, lifts, delifts handling and rehandling charges complete , T& P, including mobilization and demobilization of men and machineries complete with all cost of incidental charges with labour cess as per drawing & specification and the direction of the Engineer-in-Charge.
584.75
243723
416.8
Triangular or square section of 0.15 mt trench cutting for bonding of old earth with new purpose of dug belling 10 cm to 15 cm with all cost, conveyance, cess complete as per direction of Engineer-in-Charge.
33021
141990
4.3
Providing weep holes in RCC abutments ,wing walls /return walls with 100mm dia AC pipes , extending through the full width of the structure with slope of 1V:20 H towards drawing face including all cost of materials and labour charges complete including all incidental charges with labour cess as per approved drawing and specification and direction of Engineer-in-charge.
502
44075
87.8
Evaluation Notes How It Works ?