Water Resources Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 9,500Document Cost
₹ 4,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEBBS_103490_1Bid Award Id
ViewTender No
SEDID-01/2024-25Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Filling foundation and plinth with sand including cost, conveyance and royalty of all materials to the work site including watering and ramming with all leads, lifts, sundries and T&P etc. complete as per direction of the Engineer-in-charge.
26.02
46802
1798.7
... More
Cement concrete (1:2:4) with20mm down graded size hard granite crusher broken chips including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge.
89.98
672024
7468.6
... More
Cement concrete (1:1.5:3) with 12mm hard granite crusher broken chips including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge.
3.67
33669
9174.2
... More
Rigid smooth centering & shuttering for C.C. work including false work and dismantling then after casting including cost & conveyance of materials complete as per drawing & specification with all leads, lifts, sundries and T&P etc. complete as per the direction of Engineer-in-charge.
297.56
73794
248
... More
Supplying, cutting, bending and binding and tying the HYDS bars placing in position as per drawing and technical specification including cost ,conveyance, taxes of all materials and cost of all labours etc. complete as per the direction of Engineer-in-charge.
2.94
26770
9105.7
... More
Filling foundation and plinth with excavated materials with all leads, lifts and delifts including watering, ramming with all leads, lifts, sundries and T&P etc.complete as per direction of the Engineer -in charge.
26.25
3932
149.8
... More
Earth work in hard soil including rough dressing and breaking the clods to maximum 5.c.m to 7c.m and laying in layers not exceeding 0.30m. With five extra lead over initial lead of 50m and one extra lift over initial lift of 1.50m including sundries, T&P required for the work etc complete as per the direction of Engineer-in-Charge.
83.4
18748
224.8