Water Resources Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 6,200Document Cost
₹ 4,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_CEBMB_61501_10Bid Award Id
ViewTender No
e- BNID-02/ 2020-21Tender Authority
Water Resources Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Filling in foundation & plinth with sand well watered & rammed with all cost, conveyance & royalty of sand including all leads, lifts, delifts, all incidental charges, labour charges & cess etc but excluding GST and complete the work in all respect as per drawing, design & specification and direction of Engineer-In-Charge.
54.9
-
291.2
Cement concrete in proportion in (1:2:4) with 12 mm size crusher broken hard granite coarse aggregate of approved quality from appproved quarry, free from weathered skin surface and any other deleterious materials of uniform colour and texture including dewatering, with all labour, all cost, conveyance, royalty ofl materials, tools and plants and placed to work site and, finished smooth to all heights with all leads, lifts and delifts watering and curing etc. complete with all labours for mixing concrete by concrete mixture, placing in position manually/ mechanically and compacting with vibrators, including hire and running charges of all machineries, all incidental charges etc. complete in all respect but excluding GST and as per approved drawing, design, specification and direction of Engineer-in-charge.
46.9
-
5408.4
Providing Rigid Shuttering with the box type steel shuttering plates with keys for intermediate construction joints in rafts of weir, barrages and dam blocks including cost of all materials, labour, T&P etc complete, but excluding GST and as per drawing design and specification and direction of Engineer-in-charge including removal of forms.
59.76
-
196.3
Filling in foundation & plinth with excavated materials including watering, ramming and finishing to the required level, with all cost, labour, Cess, T & P including cost and carriage of all materials etc. complete in all respect but excluding GST and as per direction of Engineer-in-charge.
39.6
-
99.2
Earth work filling by approved quality of soil by manual means with all leads, lifts and delifts, re-handling for filling section including benching, marking, trimming the slopes and bed to the required section and level including clearing and grubbing light jungles, uprooting stumps, small bushes and trees etc. and breaking the clods to max. 5 cm to 7cm and laying in layers to the design section of bank in 22.5 cm thick layers including cost, conveyance and taxes, all incidental charges & cess etc.and complete in all respect but excluding GST and as per design, drawing, specification and as per direction of Engineer-in-charge. (Measurement will be taken on finished level section, deduct 12.5% towards settlemt of the fill)
1422
-
148.8
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements