Water Resources Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 16,100Document Cost
₹ 6,000Tender Fee
Refer Documents
Summary
Construction Of 2(two) Number Of Crematorium Including A Rest-shed For Displaced Families At R And R Colony In Village Kanseilo Of Hadua Irrigation Project, Narasinghpur.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SEHDP_108564_1Tender No
SE-HID(NSPR)-03/2024-25Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Flyash brick masonry in cement mortar (1:6) in foundation & plinth using Flyash bricks of 25x12x8cm size having a crushing strength of not less than 75 kg./sq.cm including splays cutting, circular moulding, chamfering and cur belling, watering and curing etc. complete including cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
11.96
5709
68281.43
... More
Providing R.C.C work (1:1½:3) with clean hard crusher broken granite chips of 12mm size of approved quality from approved quarry including hoisting, lowering and laying concrete with necessary slope and smoothness to receive tar felting or terracing, watering and curing for four weeks, excluding centring, shuttering and finishing the exposed surface and ceiling smooth to receive white washing or painting providing grooves or beads and fan hooks as per requirement in ceiling where necessary, cost of water, including cost, conveyance, royalty taxes of all the materials and labour, T&P and cess etc. complete in all respect but excluding cost of M.S rods or Tor steel and binding wire 18 to 20 gauge and labour charges for straightening, cutting, bending and binding and tying the grills and placing in proper position as per specification and direction of the Engineer-in-charge.
42.59
8757
372998.96
... More
Providing rigid, smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost, conveyance, royalty taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge for Column base
36.96
250
9240
... More
Providing rigid, smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost, conveyance, royalty taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge for Columns & Beams
168.69
1191
200909.79
... More
Providing rigid, smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost, conveyance, royalty taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge for Lintel
4.79
577
2763.83
... More
Providing rigid, smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost, conveyance, royalty taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge for Chajja, Roof Slab
146.65
757
111072.71
... More
Cutting, bending, binding and tying the grills and placing in proper position as per drawing and design including cost, conveyance and taxes of M.S rods and binding wire with all labour T&P and cess required for the work etc. complete in all respect in all floors(weight of binding wires will not be considered as measurement of M.S rods) as per specification and direction of the Engineer-in-charge.
57.05
8768
500234.37
... More
Flyash brick masonry in cement mortar (1:6) in super structure using Flyash bricks of 25x12x8cm size having a crushing strength of not less than 75 kg./sq.cm including splays cutting, circular moulding, chamfering and cur belling, watering and curing etc. complete including cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
6.24
5742
35833.2
... More
2.5cm thick A.S.flooring with C.C (1:2:4) including punning using 12mm size hard black broken granite chips of approved quality from approved quarry with watering , curing and finished smoot surface including warding and curing cost and carriage of water and with cost, conveyance, royalty and taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge
56.67
414
23467.05
... More
16mm th Cement plaster in C.M (1:6) to brick work finished smooth including watering curing and scaffolding with cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
64.81
272
17654.24
... More
12mm th Cement plaster in C.M (1:4) to over brick work with cement punning for skirting per 1Sqm finished smooth including watering curing and scaffolding with cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
7.7
210
1623.93
... More
12mm th Cement plaster in C.M (1:6) to brick work finished smooth including watering curing and scaffolding with cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
76.27
189
14430.28
... More
6mm th Cement plaster in C.M (1:4) to R.C.C surface finished smooth including closed deep chipping and slury treatment including watering, curing and scaffolding with cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
207.21
211
43742.03
... More
Distempering two coats with approved shade, over a coat of priming with cost, conveyance, taxes of all the materials required for the work and labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
348.29
170
59418.27
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%