Water Resources Department Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Water Resources Department - WRD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date19 Feb 2025
Closing Date3 Mar 2025
Tender Amount₹ 13,61,564 
Notes
Download

Costs

Summary

Repair And Renovation Of Staff Quarter At Canal Colony, Bargarh (e And F Type)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Wall painting two coat with weather coat paing of Approved shade on New work including cost of all materials and Labour charges etc. Complete as per the direction of the Engineer-in-charge.

490.99

184

90513.45

... More
Earthwork exavation in all kind of including dressing and levelling the bed and depositing the excavated materials away from the work site with all leads, lifts, sundries, T&P required for the work etc complete as directed by the engineer in Charge.

10.24

270

2774.02

... More
Filling foundation and plinth with sand including cost, conveyance & royalty of all materials to the work site including watering & ramming with all leads, lifts, sundries & T&P etc . complete, as per direction of Engineer-in-Charge.

3.14

646

2029.7

... More
Cement concrete (1:3:6) with 40mm size hard granite crusher broken metal including cost,conveyance, royalty & taxes of all materials to the work site, mixing & laying of concrete in position & compacted properly with all leads ,lifts , sundries, T&P required for the work, curing etc. complete as directed by Engineer-in-charge.

1.08

5815

6280.74

... More
Filling in foundation and Plinth with excavated materials incluiding watering , ramming etc complete as per direction of Engineer in charge

2.88

150

433.44

... More
Brick work with Flyash bricks having crushing strength not less than 75 Kg./Cm.2 in Cement mortar (1:4) in super structre per cum. Complete as per the direction of Engineer-in-charge.

13.01

5657

73605.38

... More
Cement concrete (1:2:4) with 12mm size hard granite crusher broken chips including cost,conveyance, royalty & other taxes of all materials to the work site, mixing & laying of concrete in position & compacted properly with all leads ,lifts , sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction & curing etc. complete as directed by Engineer-in-charge.

9.82

7435

73014.65

... More
Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification including cost, convenyance and royality of all materials to site, T&P sundries, etc. complete as per direction of Engineer- in- charge.

6.09

8701

52976.56

... More
Rigid smooth centering & shuttering for cement concrete works including false work & dismantling after casting and clearing the debries from worksite with all leads,lifts, sundries including cost ,conveyance labour T&P etc. complete as directed by Engineer-in-charge. ( In Slab )

54.72

761

41658.34

... More
6 mm thick Cement Plaster(1:4) to RCC surface finished smooth including closed deep chipping & slurry treatment (per one Sq. Mtr.) etc. complete as per direction of Engineer-in-charge.

9.02

196

1774.23

... More
12mm. Thick cememnt plaster (1:4) for brick work per 1 Sqm.complete as per thedierction of Eingeer-in-charge.

116.24

196

22817.91

... More
Supplying, fitting & fixing of vertified tiles in floor s of size 600mmx600mm of approved make confirming to IS 13755 laid on 20mm thick cement mortar (1:4) (1 cement :4 course sand) and filling joints with white cement of approved quality including cost of all materials labour T & P etc required for the work all complete as per the direction of the Engineer-in-charge.

138.52

1170

162134.25

... More
Fixing ceramic tiles in floors treads for steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to mach the shades of the tiles including rubbing and polishing complete including cost of precoat tiles and as per the direction of the Engineer-in-charge.

103.09

1574

162325.51

... More
Painting two coats with approved paint by old wood & new work etc. complete as per the direction of Engineer-in-charge.

147.79

185

27473.42

... More
Dismentaling brick or stone mesonary in lime or cement mortar under 3mtr. Height including stacking the useful materials for reuse and removing the debris within 50m Lead etc. complete as per the direction of Engineer-in-charge.

8.44

927

7830.88

... More
Dismantling G.C.I. or A.C. sheet roofing after carefully removing the bolts and nuts including stacking of he materialsfor reuse and removing the debries within 50m lead etc. complete as per the direction of Engineer-in-charge.

67.8

100

6800.04

... More
Dismantling and removing doors, windows and ventiletors including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris within 50m lead etc. complete as per the direction of Engineer-in-charge.

19.46

435

8466.41

... More
Supplying fitting & fixing colour coated Durashine roofing sheet of size 0.45mm (TCT) x 1072mm in roof including cost of sheet and all charges etc. Complete as per direction of the Engineer-in-charge.

63.42

831

52723.54

... More
supplying fitting & fixing of M.S. Channel/M.S.Angle (ISI marked) & struss in position in roof frame including cost of all charges etc all complete as per direction of the Engineer-in-charge.

2.83

12371

35010.92

... More
Labour for fitting and fixing of M.S. Gates as per approved design including cost of all materials complete as per the direction of Engineer-in-charge.

12.51

93

1167.43

... More
Supplying fitting of M.S. Door, Window Grill made out of M.S.flat conforming to IS:2062/2006, as per the design approved by the purchaser etc. complete as per the direction of Engineer-in-charge.

366.3

79

28937.7

... More
supplying all materials, Labour, T&P and fitting, fixing of 5.8'/2.5' Fiber door with acccessories etc. complete as per the direction of Engineer-in-charge.

5

3000

15000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.