Water Resources Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 43,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Pid-94,restoration To Satasankha Distributary From Rd 00 To 6.500 Km
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_CELBB_52960_23Bid Award Id
ViewTender No
EPROCUREMENT TENDER CALL NOTICE NO. PID07/2018-19Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://www.dowrodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement concrete (1:3:6) using 25mm size hard granite crusher broken metal free from weathered skin surface of uniform colour and texture from approved quarry and approved quality conferming to specification, mixing by concrete mixture including hoisting and laying concrete in position with all leads, lifts, and delifts including cost conveyance, royalty and taxes of materials including dewatering by suitable means, supplying T&P quaring for specified period with hire and running charges of machineries required for the work, construction and maintenance of coffer dam and approach road if required till completion of work etc. complete as per direction of Engineer-in-Charge.
561.44
2508233
4467.5
... More
Rigid smooth centering and shuttering for RCC/CC work including false work and dismantling them after casting and removing the debris away from the working area and stacking the useful materials for reuse including cost, carriage, royalty and taxes of all materials with all labour to the site of work etc. complete asper direction of Engineer-in-Charge.
1525.44
157410
103.19
... More
Filling foundation and plinth with excavated materials including watering ramming with all labour and all T&P’s with all leads, lifts and delifts including cost carriage & royalty of all materials etc. complete asper direction of Engineer-in-Charge
212.45
17686
83.25
... More
Providing weep holes in brick masonary/plain/reinforce concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width ofl the structure with slope of IV 20H towards drawing foce etc. complete asper direction of Engineer-in-Charge.
109.2
9587
87.8
... More
Laterite stone masonry in Cement mortar (1:4) in foundation & plinth of approved quality of laterite stone including cost, carriage, royalty & taxes of all materials to the site of work with curing to the required period etc. complete as per direction of Engineer-in-charge.
14
63271
4519.36
... More
20mm thick cement plaster in Cement mortar (1:4) over stone work or masonary including cost, conveyance, royalty and all other taxes of the materials to the site of work etc. complete including curing upto required period etc. as per direction of Engineer-in-Charge.
52
10575
203.38
... More
Labour for laying and fixing in position of RCC spun Pipe NP2 150mm dia with collars jointed with Cement mortar (1:3) including cost conveyance, royalty of all materials and curing including supply of hume pipes with cost, carriage and all taxes to the site of work including curing etc. complete as per direction of Engineer-in-Charge.
30
14090
469.69
... More
Cement concrete (1:2:4) using 12mm size down hard granite crusher broken granite chips free from weathered skin surface of uniform colour and texture including cost, conveyance, royalty and taxes of materials to the site of work and de watering with supply of working pump mixing by concrete mixture and laying concrete in position compacted with needle vibrator & curing to required period with hire and d running charges of pump and construction and maintenance of coffer dam and approach road if required till completion of work etc. complete as per direction of Engineer-in-Charge.
31.75
181793
5725.78
... More
Earth work in all kinds of soil except sand, sandy and slushy soil with all leads, lifts and delifts including breacking clods maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth over the properly prepared surface including uprooting stumps with cost of hire and running charges of transport vehicle, T&P, royality and all other incidential charges etc. complete asper direction of Engineer-in-Charge
7124
741394
104.07
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements