Water Resources Department Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Water Resources Department - WRD Tender

Civil And Construction
Opening Date19 Dec 2018
Closing Date2 Jan 2019
Tender Amount₹ 14,74,402 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Nid-127-improvement To Janara Minor From Rd 0.00 Km To 1.00 Km 2019-20

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Collecting, supplying and Collecting , supplying and stacking good quality moorum of uniform colour and texture and free from weathered skin and detritus materials at work site irregular box heaps of size 1.50 x 1.50 x0.50M to be measured as one cum and conveying from stacks and spreading moorum to the required thickness of minimum 0.15M in depth on the road surface with all leads, lifts and delifts and consolidation with PRR including cost, conveyance, royalty ,taxes and hire & running charge of PRR, labour & T&P cess etc.complete as per direction of the Engineer in-charge.

322.25

320993

996.1

... More
Earth work in excavation of foundation in ordinary soil within initial lead & lifts including dressing and leveling the bed and depositing the excavated earth away from work site with all labour, T&P & cess etc. complete as per direction of the Engineer-in-charge.

9.81

1225

124.9

... More
Filling foundation and plinth with good quality sand from approved quarry, well watered and rammed with cost,conveyance,royalty, labour, T&P, cess etc. complete as per direction of the Engineer-in-charge.

1.36

543

399.8

... More
Cement Concrete (1:3:6) with 40mm size hard granite crusher broken metal of uniform colour and texture and free from weathered skin and detritus materials with cost, conveyance, royalty and curing properly including all labour, T&P, cess etc.complete as per direction of the Engineer-in-charge.

8.8

39086

4441.7

... More
Cement Concrete (1:1.5.:3) for RCC work with 12mm size hard granite crusher broken chips of uniform colour and texture and free from weathered skin and detritus materials with cost, conveyance, royalty and curing properly including all labour, T&P, cess etc.complete as per direction of the Engineer-in-charge.

0.55

3477

6322.7

... More
Supplying, cutting, bending binding tying the grills and placing in position of uncoated HYSD/M.S.bar reinforcement for RCC work including cost, carriage & cess of all materials ,labour,T&P and cost of binding wire etc.complete as per direction of the Engineer-in-charge.

0.55

3569

6490.4

... More
Rigid smooth centering and shuttering for C.C/R.C.C work including false work and dismantling them after required period of casting with cost, conveyance, royalty, labour, T&P, cess, etc.complete as per direction of the Engineer-in- charge. a) RCC wall and fins including attached pilasters.

24

14472

603

... More
Earthwork in excavation in all kinds of soil within initial lead of 50M and lift of 1.5M including rough dressing and leveling the bed and depositing excavated away from work site and breaking the clods to maximum 5cm. to 7cm. size and laying in layers not exceeding 0.30M in depth including labour , T&P cess etc.complete as per direction of the Engineer-in-charge.

2728

283984

104.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.