Water Resources Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Water Resources Department - WRD Tender

Civil And Construction
Civil Works Others
Eprocure
Opening Date15 Oct 2022
Closing Date25 Oct 2022
Tender Amount₹ 7,07,234 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
C.C.( 1:3:6) using 40mm & down graded Crusher broken hard granite metal from approved quarry and of approved quality free from weathered skin & foreign materials mixing them properly using concrete mixer including laying in position and compacting by vibrators with all cost, conveyance, royalty& taxes of all materials with all leads, lifts, delifts including watering and curing , labour charges , cess & all T&P materials etc complete as per specification & as directed by the Engineer-In-charge.

46.85

-

4418

... More
C.C.( 1:2:4) with12mm Crusher broken hard granite stone chips from approved quarry and of approved quality free from weathered skin & foreign materials ,sand of approved quality ,cement of approved quality and Grade,mixing them properly using concrete mixer including laying in position and compacting by vibrators with all cost, conveyance, royalty& taxes of all materials including , labour charges , cess T&P ,scaffolding watering & curing with all leads, lifts, delifts etc complete as per specification & as directed by the Engineer-In-charge.

21.16

-

5754.2

... More
Rigid & smooth centering & shuttering for C.C works including false work and dismantling them after specified period of casting including removing the debries clear & away from work site including cost of all materials, conveyance, all taxes with all leads, lifts & delifts, labour charges, labour cess, all T&P materials and all costs incidental to the work etc complete as per specification & direction of the Engineer -In- charge.

130.6

-

105.2

... More
Filling in foundation and plinth with previous excavated earth in layers not exceeding 22.5 cm thick including watering and ramming with all lead, lift and de-lifts etc. complete as per the direction of the Engineer-in-charge

25.23

-

80.8

... More
Earth work in ordinary soil by manual labour as per drawing, design, specification with all leads, lifts, de lifts & depositing the excavated earth away from the work site with rough dressing, breaking the clods to maximum 5 to 7cm & laying in layers not exceeding 0.3m in depth etc. complete as directed by the Engineer-in-charge. (Measurement and payment will be made on the level section) only.

555

-

121.2

... More
Earth work in excavation in approved type of soil in borrow area by manual means, loading the earth into the transporting vehicle, transporting of the earth to the filling zone of the canal section within 5 K.M lead with all lifts and de lifts, un loading the earth from the transport vehicle in the canal section as per drawing and specifications spreading in layers not exceeding 23 cm thick breaking clods to maximum 5 cm to 7 cm size including removal of roots shrubs, bushes and debris from the earth including cost, labour charges, T&P materials, royalty, taxes etc.. complete as directed by the Engineer – in – charge.

840

-

296.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.