Water Resources Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Water Resources Department - WRD Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date24 Jan 2025
Closing Date3 Feb 2025
Tender Amount₹ 6,71,224
Costs
EMD
₹ 6,800Document Cost
₹ 4,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEMIB_109742_1Tender No
07 MID(JSP/2024-25)Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
RCC M 20 grade with crushed granite 20mm down graded coarse aggregate of approved quality mixing by concrete mixer including hoisting, lowering & laying concrete in position to proper slope and level & compacting by vibrator in layers not exceeding 0.15m depth & finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty all materials labour, T & P materials required for this item including hire and running charges of machineries complete as directed by the Engineer-in-charge.
23.95
6303
150973.62
... More
Providing rigid shuttering with box type steel shuttering plates with keys for intermediate construction joints in rafts of weirs, barrages and dam blocks including cost of all materials and labour T & P. etc. complete as directed by the Engineer- in- charge including removal of forms.
88.55
294
26113.39
... More
Straightening,cutting, bending, binding and lying the grills as per approved design & placing in position including cost, conveyance of M.S. Rod & binding wire 18 to 20 gauge complete as directed by the Engineer-in-charge.(Weight of binding wire is not including for payment)
5.99
9377
56168.23
... More
Filling foundation & plinth with excavated materials including watering & ramming to all heights with all leads & lifts with supply of all labour, all taxes as per norm and T&P required for the work etc complete in all respects as directed by the Engineer-in-charge.
22.43
150
3375.72
... More
Earth work in hard soil with all leads and lifts including rough dressing and breaking clods to maximum 5 cm to 7cm , laying in layers not exceeding 0.30m in depth etc completed as per the direction of Engineer in charge. (Measurement will be taken on the finished level section and 12.5 voids volume will be deducted towards settlement of earth in filling section )
190.62
225
43022.93
... More
Rough stone dry packing in aprons and revetments to all heights with Hard Stone other than graniteof 1cuft. and above size (weighting 140lbs/cuft. and above) of approved quality quarried and free from weathered skin including filling interstices with small stones with cost,conveyance, royalty and all other taxes of all materials required for the work and finished to proper slope and level complete in all respect as directed by the Engineer - in -charge.(Minimum 1/6 volume will be deducted towards voids)
17.23
2068
35635.09
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements