Water Resources Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 83,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMIB_107464_7Bid Award Id
ViewTender No
BID IDENTIFICATION No-08/2024-25Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in hard or gravely soil with all leads and lifts, delfts and depth of cutting to proper slope and level including rough dressing and breaking the clods to maximum 0.30 cm (1’) in depth and depositing the excavated earth on bank to proper embankment and profile with all leads and lifts labour and depositing the balance spoil away from work site with all leads and lifts as directed by the Engineer in charge (Measurement should be taken on finished level section).
1463.61
225
330409.96
... More
Excavation of foundation in hard soil with initial lead and lift including rough dressing and leveling the bed and fit for laying concrete and depositing the excavated materials clear of work site as & where directed with all leads & lifts including showing shuttering propping bulla & dewatering from foundation if necessary etc. complete in all respect by the Engineer in charge.
447.96
270
121347.88
... More
Filling of foundation with sand with all leads and lifts, delfts including watering and ramming in layers complete in all respect including cost, conveyance, royalty and other charges etc. completed as directed by the Engineer in charge.
138
758
104730.96
... More
Cement Concrete (M 15) with 20 mm down grade crusher broken hard granite chips quarried & free from weathered skin of approved quality mixing by concrete mixer including hoisting, lowering and laying concrete in position to proper slope and level and compacting by Vibrator in layers not exceeding 0.15m in depth finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty and other taxes of all materials labour, T&P materials required for this item complete as directed by Engineer-in-charge.
121.32
5645
684938.75
... More
Rainforced Cement concrete in (M 20) with 20 mm down grade hand broken hard granite chips quarried & free from weathered skin of approved quality mixing by concrete mixer including hoisting, lowering and laying concrete in position to proper slope and level and compacting by Vibrator in layers not exceeding 0.15m in depth finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty and other taxes of all materials labour, T&P materials required for this item complete as directed by Engineer-in-charge.
302.15
6095
1841700.94
... More
Supplying, straightening, cutting, bending, binding and tying the HYSD bars and placing in position as reinforcement and anchoring including lapping where necessary, cost of HYSD bars & binding wire with all leads, lifts for bending yard to placement point including cost, conveyance, labour, T&P & all taxes required for this item etc. complete as directed by the Engineer-in-charge.
164.99
8658
1428541.17
... More
Providing & removing rigid smooth centering & shuttering for R.C.C./ C.C works including false work including cost, conveyance, royalty & other taxes of all materials required for the work complete in all respect and dismantling the same after casting and proper curing including depositing the debris clear of work site with all leads & lifts delfts including supply of all labour and T & P required for the items etc. complete in all respect as directed by Engineer in charge. (For foundation and plinth)
2127.71
247
526629.5
... More
Removing old revetment aprons and toe wall and repacking with old stones including filling the interstices with small stones to proper profile and section including all leads, lifts to all heights as directed by the Engineer in charge.
172.5
1970
339861.23
... More
Filling of foundation with the excavated earth with all leads and lifts, delfts including watering and ramming in layers complete in all respect etc. completed as directed by the Engineer in charge.
158.16
150
23803.08
... More
Collecting, conveying and stacking of moorum in regular stack and spreading with consolidation by H.R.R or rammer including watering etc. complete including cost and conveyance & royalty of moorum with all T&P and labour charges required for the item etc. complete as directed by the Engineer-in-charge.
228.38
937
214030.77
... More
Ramming rolling with light H.R.R in embankment in layers not exceeding 0.30m in depth including running and hire charges of H.R.R. with all labour and T&P charges for the item etc. complete in all respect as directed by the Engineer-in-charge.
593.61
23
13759.88
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements