Water Resources Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 15,300Document Cost
₹ 6,000Tender Fee
Refer Documents
Summary
Renovation To Kantiokateni Mip In Kamakhyanagar Block Of Dhenkanal District Under Critical Grant For The Year 2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMIB_107475_3Bid Award Id
ViewTender No
SEMIDJAJ-06/2024-25Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Excavation of foundation in all kinds of soil to proper section and profile with all leads, lifts and delifts including dressing and levelling the bed to proper slope and level and making it fit for laying concrete and depositing the excavated materials away from the work site with all leads, lifts and delifts including dewatering if necessary from foundation with all labour and T&P required for the item complete in all respect as directed by Engineer-in-Charge.
54.12
270
14661.11
... More
Cement Concrete work with cement concrete M-15 grade with crushed granite 20mm down graded course aggregate of approved quality mixing by concrete mixer including hoisting, lowering and laying the concrete in position to proper slope and level and compacting by Vibrators in layers .not exceeding 0.15m depth and finishing exposed surface smooth including watering, curing for required period with cost, conveyance, royalty and other taxes of all materials including all labour and T&P materials required for the item including hire and running charges of the machineries complete in all respect as directed by the Engineer-in-charge.
14.76
6088
89870.69
... More
Cement Concrete work with cement concrete M-20 using 20 mm down graded hard granite chips of approved quality mixing by concrete mixer including hoisting, lowering and laying the concrete in position to proper slope and level and compacting by Vibrators in layers .not exceeding 0.15m depth and finishing exposed surface smooth including watering, curing for required period with cost, conveyance, royalty and other taxes of all materials including all labour and T&P materials required for the item including hire and running charges of the machineries complete in all respect as directed by the Engineer-in-charge.
49.44
6546
323644.13
... More
Straightening, cutting, bending, binding, fitting and placing uncoated HYSD bar reinforcement and laying in position including cost of binding wire 18 to 20 gauge and fixing of reinforcement including lapping where necessary with all leads, lifts from bending yard to placement spot including cost ,conveyance & all taxes of reinforcement as directed by the Engineer-in-charge.
23.82
8707
207405.5
... More
Rigid smooth centering and shuttering for R.C.C works in foundation of all heights with wooden & steel shuttering plates including supply of ties supports rigidly fixed and removal including making good to the damaged surface where necessary with all scaffolding gangway etc. with cost, conveyance and other taxes of all materials including all labour and T&P materials required for the item complete in all respect as directed by the Engineer-in-charge.
387.33
247
95864.18
... More
Filling in foundaiton and plinth with sand including watering and ramming etc.complete including cost, conveyance ,royalty and all other taxes of all materials with supply of all labour and T & P required for the work etc.complete in all respect as directed by the Engineer in Charge.
19.68
847
16674.86
... More
Earth work in Ordinary soil with initial lead and lifts , laying in layers not exceeding 0.3m in depth including rough dressing & breaking clod minimum 5cm to 7 cm…. etc complete in all respects as directed by the Engineer-in-charge of the work..
880
16799
147839.12
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements