Water Resources Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Water Resources Department - WRD Tender

Works
Civil And Construction
Eprocure
Opening Date2 Sep 2024
Closing Date12 Sep 2024
Tender Amount₹ 16,93,672 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Providing Cc Channeling In Between Rd 0.500 Km To Rd 0.900 Km, Strengthening To Bank In Between Rd 1.080 Km To Rd 1.350 Km And De-silting From Rd 0.900 Km To Rd 1.630 Km Of Chidupalli S/m-v

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete of design mix of M15 grade having specified characteristic compressive strength of 15N/mm2 in design mix with minimum quantity of cement as specified in I.S. code of 150 mm cube at 28 days curing after mixing & tests conducted in accordance with relevant clauses of I.S. – 516 using crusher broken hard granite coarse aggregate 20mm down graded and proportion as specified in I.S. 456 code and subject to mix design in conformity to the grading and proportion of different materials of concrete in structures as specified in the relevant codes of approved quantity obtained from approved quarry and using the minimum quantity of cement about 2.80 Qntl per cum (as per nominal mix)of tested and approved quality free from weathered skin surface and any other deleterious materials, uniform colour & texture with all leads, lifts and delifts including cost, carriage, royalties, taxes of all materials excluding GST, but including cess and quality control test cost of all materials, dewatering, mixing and vibrating by mechanical means placing in proper place and providing grooves or beads wherever necessary including cost, carriage of water, curing , T&P, hire & running charges of all machineries, labour and supervision charges including mobilization and demobilization and working of machineries etc with cost of construction and maintenance of coffer dam and diversion arrangement and removal required in complete as per approved drawing , specification and direction of the Engineer in charge

171.66

997630

5811.8

... More
Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling then after specified date of casting and disposal of debries, clearing of work site including cost , conveyance, taxes, royalty of all materials with all labour, T&P required for the work etc. Complete in all respects as directed by the Engineer-in-Charge

760.8

188145

247.3

... More
Earth work in cutting in ordinary soil with all leads, lifts, delifts including dressing and leveling the bed to design section and depositing the excavated materials away from working area in spoil banks with all leads, lifts and delifts including dewatering, shoring, shuttering and propping of bullah piles and construction of coffer dam if required, bailing out water with all cost, conveyance, labour and cess and , taxes of all materials excluding GST, etc. complete as per the approved drawing, design, specification and direction of the Engineer-in-Charge. (Measurement shall be made on level section as per approved design)

233.31

39032

167.3

... More
Earth work in excavation in approved type of soil from approved borrow area by mechanical means free from logs, stumps, roots or any other ingredients likely to deteriorate or effect the stability of bed, bank with all leads on properly prepared & scientifically approved surface free from weeds, roots and shrub jungles, spreading & leveling the earth in 22.5 cm layers to make the fill ready for watering in canal / flood bank of all heights including cost of all materials, royalty, T&P, cost of quality control tests, mobilisation & demobilisation, supplying, operation, maintenance of all machineries, equipments, materials and labour, cess, taxes of all materials excluding GST required for the work, including supervision charges, cost of cutting and trimming the extra fill in the slopes of the Dam & Dykes to design section, construction, maintenance, watering and lighting of haul roads, borrow areas and cost of related diversion arrangement for diversion of flow during working seasons and removal and disposal of the same after completion of the work etc. complete as per approved design, drawing, and specification and direction of the Engineer-in-charge (Measurement is to be taken on the finished level section)

387.27

67617

174.6

... More
Providing weep holes in plain / reinforced concrete walls, abutment , wing wall/ return wall, retaining wall etc.having 8cmx 23 cm size including metal spall backing in rear extending through the full width of the structure with slope of 1V: 20 H towards drawing face complete as per approved drawing and technical specification including removal of clogged materials for weep holes and providing adequate filter materials at the face with cost, carriage, royalties , labour, supervision charges, cess, taxes of all materials excluding GST etc complete as per direction of the Engineer-in-charge

212

5066

23.9

... More
Filling in foundation and plinth with excavated materials including well watered and rammed etc. with all labour charges , T & P charges etc. Complete in all respect as directed by the Engineer-in-Charge. (Measurement shall be made on level section as per approved design)

91.14

13652

149.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.