Water Resources Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 20,000Document Cost
₹ 6,000Tender Fee
Refer Documents
Summary
Improvement To Tangarpada Mip In Bhuban Block Of Dhenkanal District Under Improvement To Tank And Mip Scheme For The Year 2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMIB_105664_9Bid Award Id
ViewTender No
DMID/04/2024-25Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Dismenting and removing brick or stone masonry including stacking the useful material for reuse at site etc. Complete in all respect as directed by the Engineer in Charge
65.55
1569
102906.95
... More
Dismenting and removing concrete including stacking the useful material for reuse at site etc. Complete in all respect as directed by the Engineer in Charge
14.53
836
12151.44
... More
Cement Concrete work with cement concrete M-15 grade with crushed granite 20mm down graded course aggregate of approved quality mixing by concrete mixer including hoisting, lowering and laying the concrete in position to proper slope and level and compacting by Vibrators in layers .not exceeding 0.15m depth and finishing exposed surface smooth including watering, curing for required period with cost, conveyance, royalty and other taxes of all materials including all labour and T&P materials required for the item including hire and running charges of the machineries complete in all respect as directed by the Engineer-in-charge.
75.5
6198
468001.85
... More
Straightening, cutting, bending, binding, fitting and placing uncoated HYSD bar reinforcement and laying in position including cost of binding wire 18 to 20 gauge and fixing of reinforcement including lapping where necessary with all leads, lifts from bending yard to placement spot including cost ,conveyance & all taxes of reinforcement as directed by the Engineer-in-charge.
7.55
8596
64899.8
... More
Providing formwork for concrete with F1 finish for upstream faces of dam, spillway, glacis of barrages, unexposed surfaces of foundation, block joints etc. with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour materials and T & P complete as directed by the Engineer in charge.
74.33
896
66659.14
... More
Rough stone dry packing in approns and revetments to all heights and thickness using hard old granite stone of 15cm to 30 Cm and laterite of 1cutf and above size weighing 140 Lbs/Cft and above of approved quality free from weathered skin including filling the interstices with small stones by edging and hammering to proper slope and level with cost, conveyance, royalty and other taxes of all materials including all labour and T&P materials required for the item complete in all respect as directed by the Engineer-in-charge. (1/6th volume is to be deducted towards voids.)
39.33
865
34032.25
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements