Water Resources Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Water Resources Department - WRD Tender

Civil And Construction
Opening Date19 Dec 2018
Closing Date2 Jan 2019
Tender Amount₹ 25,12,494 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Nid-108-improvement To Astarang Minor 2019-20

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement Concrete (1:2:4) with 12mm size hard granite crusher broken chips of uniform colour and texture and free from weathered skin and detritus materials with cost, conveyance, royalty and curing properly including all labour, T&P, cess etc.complete as per direction of the Engineer-in-charge.

187.68

1112717

5928.8

... More
Cement Concrete (1:1.5.:3) with 12mm size hard granite crusher broken chips for RCC work of uniform colour and texture and free from weathered skin and detritus materials with cost, conveyance, royalty and curing properly including all labour, T&P, cess etc.complete as per direction of the Engineer-in-charge.

102.13

670953

6569.6

... More
Supplying, cutting, bending binding tying the grills and placing in position of uncoated HYSD/M.S.bar reinforcement for RCC work including cost, carriage & cess of all materials ,labour,T&P and cost of binding wire etc.complete as per direction of the Engineer-in-charge.

13.69

89084

6507.3

... More
Rigid smooth centering and shuttering for C.C/R.C.C work including false work and dismantling them after required period of casting with cost, conveyance, royalty, labour, T&P, cess, etc.complete as per direction of the Engineer-in- charge.(a) Walls

823.79

88063

106.9

... More
Filling foundation and plinth with excavated earth well watered and rammed with all leads,lifts,delifts labour, T&P, cess etc.complete as per direction of the Engineer-in-charge.

168.85

11718

69.4

... More
Earthwork in all kinds of soil except sand, sandy or slushy soil in borrow area by mechanical means and transportation of excavated earth by mechanical means with all leads, lifts, delfts, rehandling, conveyance, royalty, cess, including loading and unloading the same on prepared and approved surface including rough dressing and breaking the clods to maximum 5 cm. to 7 cm. in size and laying in layers not exceeding 30 cm. in depth with labour, T & P etc. complete as per direction of the Engineer-in-charge. (Earth will be arranged by the bidder at his own cost and risk. Earth should be free from clods, roots, brickbats and other debris. Measurement will be in finished level section only)

580

84506

145.7

... More
Collecting , supplying and stacking good quality moorum at work site in irregular box heaps of size 1.50 x 1.50 x0.50M to be measured as one cum and free from weathered skin surface and detritus materials and conveying from stacks and admixing them in proportion of 60:40( 60% moorum: 40% sand) and laying on sub-base in layers not exceeding 22.50 cm. thick including watering and consolidation with P.R.R with hire and running charges of P.R.R. including cosrt,conveyance,royalty,labour, T&P, cess etc.complete as per direction of the Engineer-in-charge.

189

236722

1252.5

... More
Earthwork in excavation in all kinds of soil within initial lead of 50M and lift of 1.5M including rough dressing and leveling the bed and depositing excavated away from work site and breaking the clods to maximum 5cm. to 7cm. size and laying in layers not exceeding 0.30M in depth including labour , T&P cess etc.complete as per direction of the Engineer-in-charge.

274.05

28528

104.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.