Water Resources Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Water Resources Department - WRD Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date27 Dec 2024
Closing Date5 Jan 2025
Tender Amount₹ 24,58,368 
Notes
Download

Costs

Summary

Nid-132- Addition, Auternation And Renovation Of Nimapara Irrigation Division Office Building.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement Concrete (1:1.5.:3) for RCC work using 53 grade with 12mm size and down graded hard granite crusher broken chips of good quality and any approved quarry of uniform colour and texture and free from weathered skin and detritus materials with cost, conveyance, royalty and curing properly including all labour, T&P, cess etc.complete as per direction of the Engineer-in-charge.

-

-

-

... More
(a) Ground Floor

6.54

8451

55275.43

... More
(b) 1st Floor

10.45

8848

92461.6

... More
Rigid smooth centering and shuttering for C.C/R.C.C work including false work and dismantling them after required period of casting with cost, conveyance, royalty, labour, T&P, cess, etc.complete as per direction of the Engineer-in- charge.

94.36

1061

100115.96

... More
Supplying, cutting, bending binding tying the grills and placing in position of uncoated HYSD reinforcement for RCC work including cost, carriage & cess of all materials ,labour,T&P and cost of binding wire etc.complete as per direction of the Engineer-in-charge.

5.89

8595

50625.14

... More
Supplying, fitting and fixing ceramic wall tiles (30cmx20cm & 20mmx20cm) in floors,dados, skirting and rises of steps on 12mm thick cement plaster in cement mortar(1:3) joined with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost, conveyance, royalty, taxes, labour, T&P, cess etc.complete and as per direction of the Engineer-in-charge.

-

-

-

... More
(a) Ground Floor

9.76

1242

12125.82

... More
(b) 1st Floor

158.21

1271

201195.66

... More
Supplying fitting and fixing of stainless steel of 304 grade in hand railing using 50 mm dia of 2 mm thick cicular pipe with blustrade of size 32 mm x 32 mm x 2 mm @ 0.90 mtr c/c and stainless square pipe bracing of size 32 mm x 32 mm x 2 mm in 3rows in stair case as per approved design and specification,buffing,polishing etc. with cost,conveyance,taxes of all materials,labour,T&P etc. requred for the work complete in all respect as per direction of the Engineer-in-Charge.

7.47

3589

26811.32

... More
Brick work in cement mortar (1:6) with Fly ash 2.5cm.x 12 cm x 8cm size with having crushing strength not less than 75Kg./Cm² with dimensional tolerance (+/-)2% in superstructure with cost, conveyance, royalty of all materials & curing properly including all labour, T&P cess etc.complete as per direction of the Engineer-in-charge.

41.17

8600

354066.12

... More
12mm thick cement plaster in cement mortar (1:6) over the brick work including racking out joints with cost, conveyance, royalty and taxes of all materials and labour for the work ad curing etc.complete as per direction of the Engineer-in-charge.

247.08

190

46945.2

... More
16mm thick cement plaster in cement mortar (1:6) to RCC surface in all floors finished smooth with cost, conveyance, royalty and taxes of all materials and labour for the work and curing etc.complete as per direction of the Engineer-in-charge.

-

-

-

... More
(a) Ground Floor

37.6

267

10065.52

... More
(b) 1st Floor

127.95

279

35710.85

... More
Finishing walls surface of walls with Acrylic wall putty(water based) of approved shade and finished smooth and even surface to receive painting including cost of scaffolding,staging charges with cost of all materials, labour, brushes, T&P, cess etc.complete as per direction of the Engineer-in-charge.

375.03

93

34990.3

... More
Scraping old paint with scrapers,sand paper and washing with soap water or soda including cost of all materials, labour, brushes, T&P, cess etc.complete as per direction of the Engineer-in-charge.

1121.56

5

5719.96

... More
Priming 1 (one) coat with any approved primer paint for wall over new/old work including cost of primer , labour, brushes & T&P etc. complete as per direction of the Engineer-in-charge.

-

-

-

... More
(a) Ground Floor

1121.56

84

94771.82

... More
(a) Ground Floor

127.95

86

11080.47

... More
Wall painting two coats with plastic emulsion paint of approved shade over old/new work including cost of paint , labour, T&P,brushes etc. complete as per direction of the Engineer-in-charge.

127.95

109

14036.12

... More
Supplying , fitting and fixing Vetrified tiles in floors of size 600mmx600mm of approved make with application of polymer modified cement based water resistant adehesive bed of requred thickness of 10mm and filling joints with epoxy grout of approved quality including rubbing and polishing including cost, conveyance, royalty, taxes, labour, T&P, cess etc.complete as per direction of the Engineer-in-charge.

70.46

1505

106056.39

... More
Dismantling brick or stone masonry in lime or cement mortar in all heights including stacking the usefull materials for re-use and removing the debris away from work site etc. complete as per direction of the Engineer-in-charge.

0.39

1655

645.68

... More
Finishing walls with weather coat of approved shade over wall two coats to give an even shade with cost of cement paint, labour, brushes, putty, T&P, cess etc.complete as per direction of the Engineer-in-charge.

-

-

-

... More
(a) Ground Floor

1121.56

277

310784.28

... More
(b) 1st Floor

116

280

32561.2

... More
4cm. Thick grading with cement concrete (1:2:4) on roof slab using 12mm size hard granite crusher broken chips with all cost, conveyance, royalty of materials and labour for work etc.complete as per direction of the Engineer-in-charge.

472

921

434900.8

... More
Supplying of M.S.Door,Window with grills.collapsible gates made out of M.S.Angle frame,M.S.flat,sheet etc. of approved section & design,electrically welded properly with all necessary locking arrangement and 1 coat red oxide primer including cost of all materials,labour T&P,carriage of all materials to site etc.complete in all respect as per direction of the Engineer-in-Charge.

10.07

3337

33612.65

... More
Supplying fitting and fixing of non-sal wood work framed and fixed (wrought and put up) in trusses, purling, frames of doors, windows, choukaths,ventilators and beams with all cost of materials, labour, T&P etc.complete as per direction of the Engineer-in-charge.

0.24

89863

21567.29

... More
25 mm thick piasal wood or local teak wood false panelled shutters complete with all labour,iron,fittings and wooden hinged cleats etc. fitted fixed complete in all respects and as per direction of the Engineer-in-charge.

7.18

4212

30245.03

... More
Priming 1 (one) coat with any approved primer paint for new/old wood work including cost of primer , labour, brushes & T&P etc. complete as per direction of the Engineer-in-charge.

7.18

82

588.76

... More
Painting two coats with enamel paint of approved shade over old/new wood work including cost of paint , labour, T&P,brushes etc. complete as per direction of the Engineer-in-charge.

7.18

333

2390.94

... More
(A) Bath Room Door

33.91

750

25432.5

... More
(B) Window

82.56

550

45408

... More
(C) Sliding opening/partition

51.67

700

36169

... More
(D) Ventilation/casment window

9.69

600

5814

... More
Providing & laying in trenches, C PVC pipe grade conforming to IS- 15778/2007 (SDR-11.), of the following nominal bore & pipe fittings including testing as per specification & direction of Engineer-in- charge complete excluding earth work.

-

-

-

... More
40mm dia CPVC Pipe-

120

448

53784

... More
25mm dia CPVC Pipe-

150

219

32940

... More
20mm dia CPVC Pipe-

163

143

23309

... More
25mm dia UPVC elbow-

20

38

766

... More
20mm dia UPVC elbow-

5

20

102.5

... More
25mm dia UPVC Tee-

2

49

98.8

... More
25mm dia UPVC Union-

6

65

393.6

... More
25mm dia UPVC MTA-

4

23

95.2

... More
25mmx15mm dia UPVC brass Tee-

4

225

903.6

... More
25mmx20mm dia UPVC brass Tee-

4

263

1052.4

... More
25mm brass G.M.Check Valve (ISI)-

2

657

1315.96

... More
25 mm PVC Ball Valve (FT)-

2

577

1155.18

... More
25mm UPVC brass FTA=

8

288

2308.8

... More
Solvent Cement=

2

944

1888.08

... More
15 mm conceal stop cock with brass body=

3

463

1389.84

... More
20mmx15mm brass elbow=

12

463

5560.8

... More
20mmx15mm UPVC Elbow Metal =

12

145

1742.4

... More
Supplying all materials, labour, T&P for fittings & P.H. fixture etc. complete as per direction of Engineer-in-charge.

-

-

-

... More
15mm dia c.p long body bib cock=

4

815

3260.92

... More
15mm dia c.p.short body bib cock=

4

751

3005.68

... More
15mm dia c.pangular stop cock=

4

751

3005.68

... More
10 litr pvc low level cistern with fittings=

2

1775

3551.42

... More
C.P.revolving shower with arm (overhead)=

2

535

1070.36

... More
C.P. towel rail. (600x20)mm=

2

704

1409.4

... More
C.P.soap holder/disc =

2

136

273.26

... More
C.P Sink waste(80/32)=

-

-

-

... More
CP Health Foucet with 1.0 mtr PVC Tube=

2

683

1366.08

... More
24"x 18" STEEL sink single bowl (Parry ware)=

-

-

-

... More
Standard wash hand basin 550x400mm Cera Clair 1025=

4

1738

6952.52

... More
15mm dia c.p. pillar cock

4

263

1052.88

... More
Basin Bracket in pair

5

170

854.8

... More
C.P. waste (32mm - Small)=

4

233

933.84

... More
15mmx450mm PVC connection pipe

4

70

283.44

... More
23" I.W.C. (Orissa Pan)=

2

2279

4558.88

... More
32-5" long mm dia waste pipe=

4

324

1298.2

... More
Bath room mirror.

2

1393

2786.96

... More
Teflon tape

2

28

57.68

... More
Supplying all materials, labour, T&P for fixing of 110mm SWR PVC pipes and fittings to wall materials robbing and wooden plugs as per specification or laying on trenches including earth work in excavations in all kinds of soils and refilling the trenches as per specification and as per direction of the Engineer-in-charge.

-

-

-

... More
110mm dia SWR/PVC pipe,-

45

302

13612.5

... More
100mm diaP.V.C. SWR door bend-

2

168

336

... More
110 x 110 x 110mm dia PVC SWR Tee-

2

185

370

... More
100mm dia P.V.C. SWR Cowl-

2

40

81.4

... More
100mm dia P V.C. SWR.pipe clip-

16

32

516.8

... More
110mm dia PVC "p" trap=

2

276

553.4

... More
110mm dia PVC SWR Repair coupler=

4

104

417.6

... More
Supplying all materials, labour T&P and fitting and fixing and installing 1000 Itr capacity double Layer Rotational Moulded Cylinderical Vertical water storage tanks over the machinary staging constructed over the roof slab etc all complete as per direction of the Engineer-in-charge.

-

-

-

... More
4 x 1000 ltr @ Rs.7.83/ltr

4000

7

31320

... More
Supplying all materials, labour, T&P for laying & jointing G.I pipe & fitting etc complete as per direction of the Engineer-in-charge.

-

-

-

... More
40mm dia G.I. Elbow-

5

107

538

... More
40mm G.I short piece-

4

306

1224.4

... More
Providing fitting and fixing of 30mm PVC Bath room door etc all complete as per the direction of the Engineer -in-charge.

3.33

2373

7902.09



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.