Water Resources Department Tender
... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Water Resources Department Tender
Civil And Construction
Building Construction
Eprocure
Opening Date21 Mar 2025
Closing Date2 Apr 2025
Tender Amount₹ 16,78,001
Costs
EMD
₹ 16,800Document Cost
₹ 6,000Tender Fee
Refer Documents
Summary
Renovation Of Dhatikia Mip In Jashipur Block Of Mayurbhanj District Under Ermscheme 2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEMIB_111785_1Tender No
SE 09/MIDJSP/2024-25Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Filling foundation & plinth with excavated materials including watering & ramming to all heights with all leads & lifts with supply of all labour, all taxes as per norm and T&P required for the work etc complete in all respects as directed by the Engineer-in-charge.
60.27
54
3294.96
... More
Earth work in excavation of foundation in all kinds of soil with all leads and lifts including dressing and leveling the bed of foundation to proper slope and level and making it fit for laying concrete including depositing the excavated materials clear of work site with all leads, lifts and delifts etc. complete including dewatering from foundation if required etc. with supply of all labour and T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge.
6.26
270
1695.83
... More
Filling in foundation & plinth with sand well watered and rammed in layers including cost, conveyance of materials and supply of all labour, taxes as per prvailing norm and T&P, dewatering if required for the work etc. complete and as directed by Engineer-in-charge.
59.33
1343
79686.12
... More
Cement concrete M15 grade with crushed granite coarse aggregate of 20 mm down graded mixed in concrete mixture including cost of all materials ,machineries and labouer with all lead for materials upto the mixing yard and transportation of mixed concrete within initial lead of 50m and laying in dams, barrages,power house and pen stock with all lift/delift upto 1.50m height above average ground level etc. complete in all respect to proper slope & level with all cost, conveyance, royalty & other taes of all materials complete in all respect as directed by the Engineer-in-charge.
38.27
6071
232341
... More
RCC M 20 grade with crushed granite 20mm down graded coarse aggregate of approved quality mixing by concrete mixer including hoisting, lowering & laying concrete in position to proper slope and level & compacting by vibrator in layers not exceeding 0.15m depth & finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty all materials labour, T & P materials required for this item including hire and running charges of machineries complete as directed by the Engineer-in-charge.
97.87
6517
637867.73
... More
Straightening,cutting, bending, binding and lying the grills as per approved design & placing in position including cost, conveyance of M.S. Rod & binding wire 18 to 20 gauge complete as directed by the Engineer-in-charge.(Weight of binding wire is not including for payment)
32.21
9373
301910.77
... More
Providing rigid shuttering with box type steel shuttering plates with keys for intermediate construction joints in rafts of weirs, barrages and dam blocks including cost of all materials and labour T & P. etc. complete as directed by the Engineer- in- charge including removal of forms.
804.9
294
237284.52
... More
Excavation of any approved type of soil from borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil with all leads and lifts and delifts of One KM on properly prepaired surface including spreading and levelling the earth in 22.50 cum layers in dam and dyke for all heights including royality of earth etc as specification and direction of the engineer-in charge (Measurment should be taken in finished leval section and 12.5 volume will be deducted towards settlement of earth in filling section ).
630.57
173
109340.84
... More
Supplying, Laying and fixing 150mm dia RCC hume pipes of approved quality for outlets including cost, conveyance of pipes to the work site with cost of all other materials and supply of all labour and T&P required for the work etc. complete in all respect as directed by Er. In charge
12
483
5799.6
... More
Earth work in hard soil with all leads and lifts including rough dressing and breaking clods to maximum 5 cm to 7cm , laying in layers not exceeding 0.30m in depth etc completed as per the direction of Engineer in charge. (Measurement will be taken on the finished level section and 12.5 voids volume will be deducted towards settlement of earth in filling section )
30.38
225
6856.77
... More
Fine dresing & turfing the slopes of the dam or canal including filling of rain cuts and slopes with selected earth duly compacted and trimmed to required profile and turfing with approved quality of compact dub grass including collection and supply of the same from approved site including loading & unloading, conveyance charges royalty of all materials with all leads, lifts & delifts as per the approved drawing, specification including mobilization & demobilization including supplying of all machineries & equipments and their running, maintenance charges, inclusive of materials and labour required the work, supervision charges, cost of watering & making arrangement for survival of grass till its growth etc. completed as directed by Engineer-in-Incharge (Measurement will be taken after full survival of grass turf)
308.16
35
10908.86
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements