Water Resources Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Water Resources Department - WRD Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date17 Sep 2024
Closing Date7 Oct 2024
Tender Amount₹ 20,07,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation of foundation in hard soil within 50mt initial lead and initial lift 1.50mt inicluding rough dressing and breaking clods to max5cm to 7cm and laying in layers not exceeding 0.30mt in depth etc complete and as per the direction of the Engineer-in-Charge.

177.38

47839

269.7

... More
Providing ,mixing,spreading of moorum and sand addmixture and consolidation with HRR including watering,ramming etc.with all cost,conveyance ,royalty,taxes and cess etc. complete as directed by the Engineer-in-Charge.

50.1

52028

1038.5

... More
Providing and laying cement concrete of grade M10 with 40mm size CBHG metal of approved quality including cost,conveyance,royalty of materials with all labour charges, T&P,Cess etc complete in all respect as per the direction of the Engineer-in-Charge.

118.22

615323

5204.9

... More
C.C./ R.C.C. work of M-15 grade with 20mm and down graded black hard granite ( Crusher broken) chips including hosting and laying over the prepared surface with ramming and including cost ,carriage and royalty of all materials and curing upto required period etc. complete and as per the direction of the Engineer-in-Charge.

121.82

734160

6026.6

... More
Providing and laying cement concrete of grade M20 with 20mm and down graded crusher broken hard granite coarse aggregate with supply of all materials labour and machinaries including hoisting and laying etc completeand as per the direction of the Engineer-in-Charge.

5.96

39409

6612.4

... More
Supplying,fitting and placing uncoated HYSD bar for R.C.C. works including cutting, bending and binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge etc complete and as per the direction of Engineer-in-Charge .

3.77

34949

9270.5

... More
Earth work filling in foundation and plinth with excavated material including watering and ramming etc.all complete and as per the direction of the Engineer-in-Charge.

59.13

8857

149.8

... More
Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling the same after specified date of casting and disposal of debries,clear of work site including cost, carraige of all materials along with the labour charges etc. complete and as per the direction of the Engineer-in-Charge .

576.52

142573

247.3

... More
Earth work in excavation in ordinary soil within initial lead of 50mt and initial lift of 1.50mt inicluding rough dressing and breaking clods to max5cm to 7cm and laying in layers not exceeding 0.30mt in depth and as per the direction of the Engineer-in-Charge.

1505.13

251808

167.3



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.