Water Resources Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Water Resources Department - WRD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date17 Aug 2024
Closing Date27 Aug 2024
Tender Amount₹ 82,83,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation of foundation in ordinary socil with initial lead and lift including rough dressing and leveling the bed and fit for laying concrete and depositing the excavated materials clear of work site as & where directed with all leads & lifts including showing shuttering propping bulla & dewatering from foundation if necessary etc. complete in all respect by the Engineer in charge.

532.9

106956

20070.72

... More
Filling of foundation with sand with all leads and lifts, delfts including watering and ramming in layers complete in all respect including cost, conveyance, royalty and other charges etc. completed as directed by the Engineer in charge.

87.29

52446

600.83

... More
Cement Concrete (M 15) with 20 mm down grade crusher broken hard granite chips quarried & free from weathered skin of approved quality mixing by concrete mixer including hoisting, lowering and laying concrete in position to proper slope and level and compacting by Vibrator in layers not exceeding 0.15m in depth finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty and other taxes of all materials labour, T&P materials required for this item complete as directed by Engineer-in-charge.

245.33

1326148

5405.55

... More
Rainforced Cement concrete in (M 20) with 20 mm down grade hand broken hard granite chips quarried & free from weathered skin of approved quality mixing by concrete mixer including hoisting, lowering and laying concrete in position to proper slope and level and compacting by Vibrator in layers not exceeding 0.15m in depth finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty and other taxes of all materials labour, T&P materials required for this item complete as directed by Engineer-in-charge.

264.6

1549243

5855.15

... More
Supplying, straightening, cutting, bending, binding and tying the HYSD bars and placing in position as reinforcement and anchoring including lapping where necessary, cost of HYSD bars & binding wire with all leads, lifts for bending yard to placement point including cost, conveyance, labour, T&P & all taxes required for this item etc. complete as directed by the Engineer-in-charge.

79.38

687088

8655.69

... More
Providing & removing rigid smooth centering & shuttering for R.C.C./ C.C works including false work including cost, conveyance, royalty & other taxes of all materials required for the work complete in all respect and dismantling the same after casting and proper curing including depositing the debris clear of work site with all leads & lifts delfts including supply of all labour and T & P required for the items etc. complete in all respect as directed by Engineer in charge. (For foundation and plinth)

1500.36

371009

247.28

... More
Filling of foundation with the excavated earth with all leads and lifts, delfts including watering and ramming in layers complete in all respect etc. completed as directed by the Engineer in charge.

362.94

54380

14983.35

... More
Earth work in ordinary soil with all leads and lifts, delfts and depth of cutting to proper slope and level including rough dressing and breaking the clods to maximum 5 cm to 7 cm & laying in layers not exceeding 0.30 cm (1’) in depth and depositing the excavated earth on bank to proper embankment and profile with all leads and lifts labour and depositing the balance spoil away from work site with all leads and lifts as directed by the Engineer in charge. (Measurement should be taken on finished level section).

815

136313

16725.6

... More
Removing old aprons and revetments and repacking with old stones with all labour and T&P materials required for the works etc. complete as directed by the Engineer in charge

174

294402

1691.97

... More
Dismetaling and removing of RCC Columns, beams, slab staircase, landing, lintels including stacking the useful materials for reuse and removing the debris within 50m lead per 1 sqm. including cost of all T&P materials and labour required for this item etc. complete as directed by the Engineer in charge.

304.19

503468

1655.14

... More
Collecting, conveying and stacking of moorum in regular stack and spreading with consolidation by H.R.R or rammer including watering etc. complete including cost and conveyance & royalty of moorum with all T&P and labour charges required for the item etc. complete as directed by the Engineer-in-charge.

104.85

98006

934.73



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.