Water Resources Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 8,500Document Cost
₹ 4,000Tender Fee
Refer Documents
Summary
Nid-242 - Construction Of Road From Deuliathenga Bridge Right Side Of Khandasahi Distributary.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CELBB_100297_16Bid Award Id
ViewTender No
e-Procurement Notice No.- 08 of 2023-24Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://www.dowrodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Cement Concrete (1:2:4 )proportion using 53 grade cement with crusher broken hard granite coarse aggregate of size 12mm good quality from approved quarry of uniform colour and texture and free from weathered skin and detritus materials using screened and washed coarse sand , mixing by mechanical mixer, placing in proper position, compacting, by mechanical vibrator including cost, conveyance, royalty and all other taxes of all materials with all leads, lifts and delifts, curing properly , hire & running charges of all machineries including all labour, T&P,fixing of embedment's if any cess etc.complete in all respect as per direction of the Engineer-in-charge.
43.6
322679
7400.9
Rigid smooth centering and shuttering for C.C/R.C.C work including false work and dismantling them after required period of casting with cost, conveyance, royalty, labour, T&P, cess, etc.complete as per direction of the Engineer-in- charge.
-
-
-
(a) Walls & fins.
49
46334
945.6
Filling foundation and plinth with excavated earth well watered and rammed with all leads,lifts,delifts labour, T&P, cess etc.complete as per direction of the Engineer-in-charge.
56
4883
87.2
Collecting,supplying and stacking good quality moorum at work site in regular box heaps of size 1.5mx1.5mx0.5m to be measure as 1 cum and spreading the same on prepared road surface including all cost,conveyance ,royalty,labour,cess taxes with watering,ramming in all respect etc complete as per direction of the Engineer in charge.
42
62151
1479.8
Earthwork in all kinds of soil except sand, sandy or slushy soil in borrow area by mechanical means and transportation of excavated earth by mechanical means with all leads, lifts, delfts, rehandling, conveyance, royalty, cess, including loading and unloading the same on prepared and approved surface including rough dressing and breaking the clods to maximum 5 cm. to 7 cm. in size and laying in layers not exceeding 22.5 cm.layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area with labour, T & P etc. complete as per direction of the Engineer-in-charge. (Earth will be arranged by the bidder at his own cost and risk. Earth should be free from clods, roots, brickbats and other debris.)
56
12577
224.6
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements