Water Corporation Of Odisha Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Water Corporation Of Odisha - WATCO Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date12 Jan 2024
Closing Date24 Jan 2024
Tender Amount₹ 19,30,000
Costs
EMD
₹ 19,300Document Cost
₹ 7,080Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GWCDI_99548_1Bid Award Id
ViewTender No
GMWATCO-II/ 79 /2023-24 Dt.10.01.2024Tender Authority
Water Corporation Of Odisha ViewPurchaser Address
-Website
http://http://www.watcoodisha.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Cantilever Support Angel 50x50x6mm GI (1282mm long) (4.5Kg./Mtr, 2No's)(Each 2x1.282x4.5=11.54Kg)
11.54
-
-
50x6mm GI Flat for earthing, 2.36Kg/Mtr.,(2.5x7 mtr. For mesh formation, 12Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8mtr for HG Fuse, 5x2 mtr. For DTR Nutral, (1.3+4.5)mtr. For DTR Body , 0.500 mtr for LTDB & ab Switch operating handel, 3 mtr. for Fencing (Each 65.6x2.36=154.81Kg)
154.82
-
-
LT Distribution Box with MCCB, Aluminum Busbar For 3 Bay with kit kat fuse for 500KVA S/S
1
-
-
55m2 all alloy aluminium conductor (AAAC) - PVC insulated (50 mtr each Dtr)
50
-
-
1c x 400mm2 LT x LPE cable (un armoured)
120
-
-
H.G.Fuse( 11KV.400A.3Pole)
1
-
-
40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long
7
-
-
Erection Charges SI NO- (1 to 6 & 8)
1
-
-
Supplying, Installation, Testing & Commissioning of 500 KVA, 11/0.4KV Copper (cu) Transformer with Tap Changer BIS Energy level II.
-
-
-
Details Specification given below
-
-
-
500KVA, 11/0.433 KV, 3 phase, 50 HZ, core type, outdoor type, copper wound, natural oil colled distrubution transformer complete with all fittings, accessories etc all complete including, storage & insurance T&P, Transporttaion & erection charges.
1
-
-
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat
around pipe .
7
-
-
LTDB Plinth
1
-
-
DTR Plinth upto 1000KVA
1
-
-
Laying of 1 Cx 400 mm2 LT XLPE Cable
120
-
-
Installtion for HT metering unit
-
-
-
Supplying all materials labour & T&P storage & insurance Transoportion & errection charges etc as per direction of Engineer-in-chrge. (details given below)
-
-
-
WPB(GI) 160x152 (11Mtr. Long, 30.44KG/Mtr.)
2
-
-
Erection Charges Item No 16 (B)
1
-
-
Top Channel 100X50X6mm, 9.56 KG/Mtr., each channel length 3 mtr 2nos channel required =( 2x9.56x3)
57.36
-
-
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 nos required = (6x2.36x0.280)
3.97
-
-
AB switch Mounting Channel 75X40X4.8mm, 7.14KG/Mtr, each channel length 3 Mtr., 2 no's channel required =(7.14x3x2)
42.84
-
-
HT MU Mounting Channel 100X50X6mm, 9.56KG/Mtr, each channel length 3 Mtr., 2 no's channel required =( 9.56x3x2)
57.36
-
-
Angle for Base support of HT MU 50 x 50 x 6 - 500 mm.each 2 nos.(4.5 K.g. per mtr.)
4.5
-
-
MU and AB Switch Side Support Channel 100X50X6mm,9.56 KG/Mtr., each channel length 0.35 mtr., 4 no's channel required =( 9.56x4x0.35)
13.38
-
-
Channel Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each channel length 0.8 Mtr., 1 no's channel required =( 7.14x0.8x1)
5.71
-
-
Danger Plate, 2 no's.
2
-
-
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no's = (2x0.59x0.510)
0.6
-
-
55mm2 All Alloy Aluminum Conductor (AAAC) - PVC Insulated for Jumpering
15
-
-
H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty required ( 1 Pair)
2
-
-
H.T. Stay set (Complete )
2
-
-
H.T. Stay Insulator Type-C
2
-
-
7/10 SWG Stay Wire 15kg /stay
30
-
-
Gi Pipe Earthing 40mm. 3 Mtr. Long
2
-
-
50x6mm GI Flat for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36
48.38
-
-
GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty.required =(2x3kg)
6
-
-
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510)
2.41
-
-
Lightning Arrester(12KV,10KA) (Station Class,class-2)
3
-
-
AB Switch (11KV,200A.3pole,50Hz)
1
-
-
11 KV pin insulator polymer
3
-
-
H W fitting(B&S) 70KN, 3Bolt
3
-
-
Disc insulator (B&S) 70 KN polymer
3
-
-
PG Clamp for 55 sq.mm AAA conductor
6
-
-
GI Nut , Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch)
13.72
-
-
Black Paint
1
-
-
Yellow Colour Paint for Background
2
-
-
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.
2
-
-
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) =
0.9
-
-
Couping ratio 1:1.5:3 with dimension ( 500X500X450)=
0.23
-
-
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flataround pipe .
2
-
-
Supply and Erection of GI Fencing with Gate
20
-
-
Erection Charges= Item No (17 to 43 ) except item 35
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements