ST And SC Development Minorities And Backward Classes Welfare Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
ST And SC Development Minorities And Backward Classes Welfare Department Tender
Civil And Construction
Eprocure
Opening Date3 Oct 2024
Closing Date21 Oct 2024
Tender Amount₹ 25,63,609
Costs
EMD
₹ 25,700Document Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_STSCD_105345_1Tender No
ITDABPD-03/2024-25Tender Authority
ST And SC Development Minorities And Backward Classes Welfare Department ViewPurchaser Address
-Website
http://http://www.stscodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Fly Brick masonry in cement mortar (1:6) using Flyash Bricks of size 23xm x 11 cm x 8 cm having crushing strength use in foundation plinth & basement works with all watering and curing etc., including cost conveyance, royalties and cost of all labour with T&P required for the work complete as directed by the E.I.C
16.07
91422
5689
... More
RCC work of proportion (M-20) in having a minimum compressive strength (in work test) 150 Kg/Cm 2 in 15cm cubes at 28 days after mixing and test ………… etc complete as directed by the E.I.C
-
-
-
... More
A) Colum base footing
8.39
60115
7165.1
... More
B) Plinth Bend
4.59
36860
8030.6
... More
C) Column in Super Structure
5.2
84677
16284.1
... More
D) Column in super structure in 1st floor
4.65
85100
18301.2
... More
E) Lintel Bend
1.34
19789
14768.1
... More
F) Lintel Bend 1st Floor
1.34
22085
16481.9
... More
G) Chajja
8.73
11092
1270.6
... More
H) All kind of Beam (G.F)
6.22
101287
16284.1
... More
I) All kind of Beam (First Floor)
6.22
113833
18301.2
... More
J) Roof Slab (GF)
11.05
158346
14330
... More
K) Roof Slab (First Floor)
13.94
222430
15956.3
... More
L) Stair Case
2.11
34099
16161
... More
L) Stair Case First Floor
2.11
38303
18153.4
... More
Flayash Brick masonry in cement mortar (1:6) using K.B. bricks of size 23cm x 11cm x 8cm having crushing strength not less than 75 Kg / Cm2 after immersing the bricks for six hours in water before use in Super structure including splays cutting c ircular molding ....... etc complete
-
-
-
... More
GROUND FLOOR
6.67
38201
5727.4
... More
FIRST FLOOR
9.18
55966
6096.6
... More
Cutting straightening collect and bent up MS Rods or Tor Steel bending binding, moulding and joining if necessary and tying the grills and placing in position as required for RCC work
-
-
-
... More
GROUND FLOOR
32.29
293428
9087.3
... More
FIRST FLOOR
29.24
266668
9120
... More
Providing 12mm thick cement plaster to surface of masonary wall with cement mortar (1:6) smooth to brick wall after racking out the joints including cost coveyance royalty taxes of all materials and cost of all labour etc., complete as per direction of the E.I.C.
-
-
-
... More
GROUND FLOOR
112.78
21890
194.1
... More
FIRST FLOOR
41.71
8283
198.6
... More
Providing 16mm thick cement plaster to surface of masonary wall with cement mortar (1:6) including racking out joints, scraping and cleaning the surface and finishing the plastered surface smooth to proper plumbs and level as per drawings including cost of all materials, conveyance, loading and unloading, all taxes and royalties, labour, scaffolding, watering and curing, sundries and T&P etc. complete as per direction of the Engineer-in-charge
-
-
-
... More
GROUND FLOOR
109.34
30396
278
... More
FIRST FLOOR
41.71
11879
284.8
... More
Providing12mm thick cement plaster with cement mortar (1:4) to ceilings of roof slabs, stairs, landings, chajja, shelves, columns, beams and lofts etc. including, scraping, cleaning and finishing the plastered surface smooth to proper plumbs as per drawings including cost of all materials, conveyance, loading and unloading, all taxes and royalties, all labour, scaffolding, watering and curing , sundries, T&P etc. complete as per direction of the Engineer-in-charge
23.34
5013
214.8
... More
Providing 6mm thick cement plaster with cement mortar (1:4) to ceilings of roof slabs, stairs, landings, chajja, shelves, columns, beams and lofts etc. including, scraping, cleaning and finishing the plastered surface smooth to proper plumbs as per drawings including cost of all materials, conveyance, loading and unloading, all taxes and royalties, all labour, scaffolding, watering and curing , sundries, T&P etc. complete as per direction of the Engineer-in-charge
-
-
-
... More
GROUND FLOOR
82.35
17491
212.4
... More
FIRST FLOOR
82.35
17935
217.8
... More
2.5cm thick grading concrete (1:2:2) on roof slab with 4.7mm size hard granite chips, watering and curing etc., complete with cost, conveyance, royalties and all taxes of all labour with T&P required for the work etc., complete as per direction of the Engineer-in-charge
-
-
-
... More
FIRST FLOOR
58.08
23220
399.8
... More
Plastic paint 2 coats with any approved shade over the interior surface of walls etc., complete distemper including cost, conveyance of all materials cost of all labour with T&P required for the work etc., complete in all respect
-
-
-
... More
GROUND FLOOR
191.78
32621
170.1
... More
FIRST FLOOR
110.11
19170
174.1
... More
Finishing wall surface of walls with cement based wall puty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes labour T&P etc., complete
-
-
-
... More
GROUND FLOOR
191.78
17183
89.6
... More
FIRST FLOOR
110.11
9865
89.6
... More
Painting two coats over a coat of primer to wood / Irion work including all charges
15.42
3987
258.6
... More
Painting two coats in weather coat 2 coat paint all floors with brush to wall surface with over a coat after leaning the surface including watering and curing etc., complete
-
-
-
... More
GROUND FLOOR
121.51
21920
180.4
... More
FIRST FLOOR
41.71
7812
187.3
... More
Supplying, fitting, fixing of tiles in floors, treads, steps and landing slab on 20mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigments to match the shades of the tiles including rubbing and polishing the surface etc., complete
-
-
-
... More
Veterified Tiles GROUND FLOOR
82.85
99461
1200.5
... More
Veterified Tiles FIRST FLOOR
82.85
100555
1213.7
... More
Industrial Veterified GROUND FLOOR
24.09
25325
1051.3
... More
Industrial Veterified FIRST FLOOR
15.84
16860
1064.4
... More
Supplying, fitting, fixing of tiles in floors, treads, steps and landing slab on 12mm thick bed (1:3) cement mortar (1:1) joined with neat cement slurry mixed with pigments to match the shades of the tiles including, rubbing and polishing the surface etc., complete Vaterified tiles in Dadoes
7.18
9542
1329
... More
Cement concrete of (m-20) with (½ ”) size chips i…… including watering, curing costm, conveyance all materials labour with T&P required for the work etc., complete
1.25
8492
6794.2
... More
Supplying fitting fixing of MS window……. Etc T&P Labour complete
1030.14
136699
132.7
... More
Back filling of surplus excavated earth at work site by initial lead of 50.00mtr and initial……..including cost of all labour T&P work wtc., complete
52.34
7840
149.8
... More
Supplying, fitting and fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr C/C and stainless square pipe
74.93
29784
397.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements