ST And SC Development Minorities And Backward Classes Welfare Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

ST And SC Development Minorities And Backward Classes Welfare Department Tender

Civil And Construction
Building Construction
Eprocure
Opening Date25 Aug 2022
Closing Date8 Sep 2022
Tender Amount₹ 2,39,28,143 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Kitchen cum dining

58.86

-

215.2

... More
Site area development

32.91

-

215.2

... More
Filling at all depth with available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 15cm in depth:consolidating each deposited layer by ramming and watering complete (lead upto 100m) as directed by the Engineer-In-charge.

-

-

-

... More
New hostel building

139.31

-

143.47

... More
Kitchen cum dining

30.64

-

143.47

... More
Site area development

13.77

-

143.47

... More
Supplying of filling sand in foundation and over areas including watering,ramming, consolidating and dressing, labours, tools, taxes etc., all complete as per the specification and direction of Engineer-In-charge.

-

-

-

... More
New hostel building

109.94

-

526.43

... More
Kitchen cum dining

6.32

-

526.43

... More
Site area development

17.94

-

526.43

... More
Cement Concrete (1:3:6) using 12mm size hard granite C.B. metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C.

-

-

-

... More
New hostel building

75.64

-

5487.01

... More
Kitchen cum dining

17.8

-

5487.01

... More
First class Fly ash Brick masonry using bricks of size 25cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per. Sqr. Cm. in cement mortar of mix( 1:6) with ordinary Portland slag cement(PSC) and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Foundation & Plinth including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-In-Charge. at all floors and all heights.

-

-

-

... More
New hostel building

11.39

-

4313.24

... More
Kitchen cum dining

2.25

-

4313.24

... More
First class Fly ash Brick masonry using bricks of size 25cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per. Sqr. Cm. in cement mortar of mix( 1:6) with ordinary Portland slag cement(PSC) and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Super stracture including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-In-Charge. at all floors and all heights.

-

-

-

... More
Ground Floor

-

-

-

... More
New hostel building

133.56

-

4351.56

... More
Kitchen cum dining

20.31

-

4351.56

... More
Boys hostel - A

2.1

-

4351.56

... More
Boys hostel - B

4.2

-

4351.56

... More
Boys hostel - C

3.57

-

4351.56

... More
Boundry Wall

167.91

-

4351.56

... More
First Floor

-

-

-

... More
New hostel building

143.28

-

4624.8

... More
Boys hostel - A

8.63

-

4624.8

... More
Boys hostel - B

16.58

-

4624.8

... More
Boys hostel - C

3.57

-

4624.8

... More
2nd Floor

-

-

-

... More
New hostel building

27.53

-

4939

... More
Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 25 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position.

-

-

-

... More
a) Footing & Pedestal

-

-

-

... More
New hostel building

32.9

-

5577.62

... More
Kitchen cum dining

7.59

-

5577.62

... More
b) Column ( Upto Plinth Beam )

-

-

-

... More
New hostel building

3.86

-

11410.92

... More
Kitchen cum dining

0.67

-

11410.92

... More
c) Grade Beam/Tie beam

-

-

-

... More
New hostel building

13.14

-

5943.65

... More
Kitchen cum dining

2.7

-

5943.65

... More
d) Column & Beam

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

40.89

-

11410.92

... More
Kitchen cum dining

6.2

-

11410.92

... More
First floor

-

-

-

... More
New hostel building

40.89

-

12707.16

... More
Second floor

-

-

-

... More
New hostel building

11.51

-

14257.98

... More
e) Lintel

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

8.81

-

9167.32

... More
Kitchen cum dining

1.5

-

9167.32

... More
First floor

-

-

-

... More
New hostel building

8.81

-

10010.16

... More
Second floor

-

-

-

... More
New hostel building

0.25

-

11017.22

... More
f) Chajja

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

1.33

-

5902.61

... More
Kitchen cum dining

1.86

-

5902.61

... More
Boys hostel - A

4.94

-

5902.61

... More
Boys hostel - B

3.66

-

5902.61

... More
Boys hostel - C

4.53

-

5902.61

... More
First floor

-

-

-

... More
New hostel building

1.33

-

6085.98

... More
Boys hostel - A

4.94

-

6085.98

... More
Boys hostel - B

3.66

-

6085.98

... More
Boys hostel - C

4.53

-

6085.98

... More
Second floor

-

-

-

... More
New hostel building

0.07

-

6301.69

... More
g) Staircase

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

3.49

-

10930.08

... More
First Floor

-

-

-

... More
New hostel building

3.49

-

12129

... More
h) Roof slab

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

58.75

-

9777.27

... More
Kitchen cum dining

6.81

-

9777.27

... More
First floor

-

-

-

... More
New hostel building

58.75

-

10743.32

... More
Second floor

-

-

-

... More
New hostel building

2.25

-

11898.25

... More
Supplying, straightening, cutting, bending, placing in position and binding reinforcement steel work in RCC/reinforced brick works as per drawing and specification including preparation of respective bar bending schedule and binding (Binding wire to be used as per the IS code) etc. all complete as per direction of Engineer-In-charge. Cold Twisted bars, Thermo-Mechanically-treated bars.

-

-

-

... More
Ground floor

-

-

-

... More
New building block

-

-

-

... More
Foundation & Column Base

32.9

-

10509.61

... More
Column (Sub-Structure)

6.76

-

10509.61

... More
Plinth Beam

11.56

-

10509.61

... More
Column & Beam

15.5

-

10509.61

... More
Lintel Beam

10.92

-

10509.61

... More
Staircase

4.57

-

10509.61

... More
Slab

51.7

-

10509.61

... More
Chajja

0.24

-

10509.61

... More
Kitchen block

-

-

-

... More
Foundation & Column Base

7.59

-

10509.61

... More
Column (Sub-Structure)

1.18

-

10509.61

... More
Plinth Beam

2.38

-

10509.61

... More
Column & Beam

10.91

-

10509.61

... More
Lintel Beam

1.86

-

10509.61

... More
Slab

5.99

-

10509.61

... More
Chajja

0.34

-

10509.61

... More
Boys hostel - A

-

-

-

... More
Chajja & Shelves

0.89

-

10509.61

... More
Boys hostel - B

-

-

-

... More
Chajja & Shelves

0.66

-

10509.61

... More
Boys hostel - C

-

-

-

... More
Chajja & Shelves

0.82

-

10509.61

... More
First floor

-

-

-

... More
New building block

-

-

-

... More
Column & Beam

15.5

-

10533.99

... More
Lintel Beam

10.92

-

10533.99

... More
Staircase

4.57

-

10533.99

... More
Slab

51.7

-

10533.99

... More
Chajja

0.24

-

10533.99

... More
Boys hostel - A

-

-

-

... More
Chajja & Shelves

0.89

-

10533.99

... More
Boys hostel - B

-

-

-

... More
Chajja & Shelves

0.66

-

10533.99

... More
Boys hostel - C

-

-

-

... More
Chajja & Shelves

0.82

-

10533.99

... More
2nd Floor

-

-

-

... More
New building block

-

-

-

... More
Column & Beam

0.44

-

10559.58

... More
Lintel Beam

0.31

-

10559.58

... More
Slab

1.98

-

10559.58

... More
Chajja

0.01

-

10559.58

... More
12mm cement plaster on external RCC/brick surfaces in cement plaster 1:6 (1 cement : 6 coarse sand) including necessary scaffolding, curing etc. all complete at all floors and all heights.

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

613.96

-

144.31

... More
Kitchen cum dining

112.22

-

144.31

... More
Boys hostel - A

351.15

-

144.31

... More
Boys hostel - B

779.55

-

144.31

... More
Boys hostel - C

344.7

-

144.31

... More
First floor

-

-

-

... More
New hostel building

676.66

-

147.7

... More
Boys hostel - A

337.92

-

147.7

... More
Boys hostel - B

792.35

-

147.7

... More
Boys hostel - C

371.58

-

147.7

... More
2nd Floor

-

-

-

... More
New hostel building

159.6

-

151.2

... More
16mm cement plaster on internal smooth side of RCC/brick surfaces with cement mortar of mix 1:6 (1 cement : 6 fine sand) including necessary scaffolding, curing etc. all complete at all floors and all heights.

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

700.53

-

205.69

... More
Kitchen cum dining

112.65

-

205.69

... More
Boys hostel - A

182.4

-

205.69

... More
Boys hostel - B

250.8

-

205.69

... More
Boys hostel - C

148.2

-

205.69

... More
Boundary Wall

1206

-

205.69

... More
First floor

-

-

-

... More
New hostel building

665.45

-

210.74

... More
Boys hostel - A

206.4

-

210.74

... More
Boys hostel - B

349.8

-

210.74

... More
Boys hostel - C

230.89

-

210.74

... More
2nd Floor

-

-

-

... More
New hostel building

159.57

-

215.93

... More
6 mm cement plaster on RCC surfaces at ceiling/slab soffit and other locations with cement mortar of mix 1:4 (1 cement : 4 fine sand) including necessary scaffolding, curing etc. all complete at all floors and all heights.

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

425.3

-

160.47

... More
Kitchen cum dining

40.5

-

160.47

... More
Boys hostel - A

198.5

-

160.47

... More
Boys hostel - B

414.15

-

160.47

... More
Boys hostel - C

228.6

-

160.47

... More
First floor

-

-

-

... More
New hostel building

425.3

-

164.43

... More
Boys hostel - A

198.5

-

164.43

... More
Boys hostel - B

414.15

-

164.43

... More
Boys hostel - C

228.6

-

164.43

... More
2nd Floor

-

-

-

... More
New hostel building

22.95

-

168.51

... More
Providing, fitting and fixing Matt Finish Vitrified tile in floor of size 300x300 mm of approved make conforming to IS: 13755 laid on 20 mm thick cement mortar 1:4 (1 cement: 4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc required for the work all complete as per direction of Engineer-In-Charge (for New work only)

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

423.26

-

1283.9

... More
Kitchen cum dining

40.5

-

1283.9

... More
Boys hostel - A

45

-

1283.9

... More
Boys hostel - B

65.6

-

1283.9

... More
Boys hostel - C

18.82

-

1283.9

... More
First floor

-

-

-

... More
New hostel building

423.26

-

1293.96

... More
Boys hostel - A

45

-

1293.96

... More
Boys hostel - B

65.6

-

1293.96

... More
Boys hostel - C

18.82

-

1293.96

... More
Providing and laying Vitrified tiles of size 600x600 mm (thickness to be specified by the manufacturer) for skirting/Dado 1st quality conforming to IS: 15622 of NITCO, SOMANY, ASIAN, KAJARIA or equivalent approved make, colours & shades, except white, ivory, grey, fume red brown, laid on 12 mm thick cement mortar 1:3 (1cement: 3coarse sand ) including pointing the joints with white cement and matching pigments, etc. complete as per direction of EIC at all floors and all heights.

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

173.82

-

1056.15

... More
Kitchen cum dining

32.58

-

1056.15

... More
Boys hostel - A

112.56

-

1056.15

... More
Boys hostel - B

284.76

-

1056.15

... More
Boys hostel - C

122.22

-

1056.15

... More
First floor

-

-

-

... More
New hostel building

173.82

-

1071.29

... More
Boys hostel - A

112.56

-

1071.29

... More
Boys hostel - B

284.76

-

1071.29

... More
Boys hostel - C

122.22

-

1071.29

... More
Fixing granite tile (Above 0.40 Sqm) (20mm thick) in floors treads or steps and landing on 20mm thick bed of cement mortar 1:4 (1cement : 4sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost, carriage, royalty & taxes of all material, cost of all labour T&P etc. complete.

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

75.03

-

2070.8

... More
Kitchen cum dining

12.15

-

2070.8

... More
First floor

-

-

-

... More
New hostel building

75.03

-

2080.9

... More
Fixing Granite stone in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete including all costs complete

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

15.93

-

2848.22

... More
Kitchen cum dining

2.25

-

2848.22

... More
First floor

-

-

-

... More
New hostel building

15.93

-

2877.46

... More
Providing and laying 60 mm thick Factory made cement concrete interlocking Paver block of M30 grade made by block making machine with strong vibratory compaction .

-

-

-

... More
Site area development

179.4

-

991.1

... More
Providing and Fixing Chequerred precast cement concrete tiles 22 mm thick in foot path on 20 mm thick bed of cement mortar (1:4).

-

-

-

... More
Site area development

40

-

581.3

... More
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). DSR_2021_VOL, II- 16.69, PAGE NO 338.

-

-

-

... More
Site area development

3.59

-

8613.55

... More
Supplying M.S. Grill, Door,Window and Gate made out of angle,flat and square bar including cost of transportation, taxes, etc.all complete. As per approved design and Direction of Engineer - In- Charge. (per Kg.)

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

648

-

140.78

... More
Kitchen cum dining

572.4

-

140.78

... More
Boys hostel - A

207.9

-

140.78

... More
Boys hostel - B

226.8

-

140.78

... More
Boys hostel - C

113.4

-

140.78

... More
First floor

-

-

-

... More
New hostel building

648

-

140.78

... More
Boys hostel - A

207.9

-

140.78

... More
Boys hostel - B

226.8

-

140.78

... More
Boys hostel - C

113.4

-

140.78

... More
Painting with Enamel paint of approved quality and shade over surface with 2 coats

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

84.24

-

92.46

... More
Kitchen cum dining

30.78

-

92.46

... More
Boys hostel - A

126.77

-

92.46

... More
Boys hostel - B

155.52

-

92.46

... More
Boys hostel - C

106.11

-

92.46

... More
First floor

-

-

-

... More
New hostel building

84.24

-

94.08

... More
Boys hostel - A

126.77

-

94.08

... More
Boys hostel - B

155.52

-

94.08

... More
Boys hostel - C

106.11

-

94.08

... More
Painting Priming over surface one coat with wood primer of approved quality.

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

84.24

-

58.04

... More
Kitchen cum dining

30.78

-

58.04

... More
Boys hostel - A

126.77

-

58.04

... More
Boys hostel - B

155.52

-

58.04

... More
Boys hostel - C

106.11

-

58.04

... More
First floor

-

-

-

... More
New hostel building

84.24

-

59.54

... More
Boys hostel - A

126.77

-

59.54

... More
Boys hostel - B

155.52

-

59.54

... More
Boys hostel - C

106.11

-

59.54

... More
Providing & Applying priming coat with Cement primer of approved brand and manufacture on plaster surface as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete.

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

1739.79

-

60.11

... More
Kitchen cum dining

265.37

-

60.11

... More
Boys hostel - A

898.53

-

60.11

... More
Boys hostel - B

1756.95

-

60.11

... More
Boys hostel - C

1056.08

-

60.11

... More
Boundary Wall

3819

-

60.11

... More
First floor

-

-

-

... More
New hostel building

1767.41

-

61.61

... More
Boys hostel - A

1018.53

-

61.61

... More
Boys hostel - B

2175.71

-

61.61

... More
Boys hostel - C

1341.74

-

61.61

... More
2nd Floor

-

-

-

... More
New hostel building

342.12

-

63.16

... More
Providing and applying to outside walls with two or more coats of Anti-Fungal Weather coat water proofing paint including scaffolding and cleaning the surface before application of approved colour and manufacture as per specification, instruction of Engineer-In-Charge at all elevations including all material labour complete.

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

700.53

-

94.13

... More
Kitchen cum dining

112.65

-

94.13

... More
Boys hostel - A

304

-

94.13

... More
Boys hostel - B

418

-

94.13

... More
Boys hostel - C

247

-

94.13

... More
Boundary Wall

3819

-

94.13

... More
First floor

-

-

-

... More
New hostel building

665.45

-

95.34

... More
Boys hostel - A

424

-

95.34

... More
Boys hostel - B

583

-

95.34

... More
Boys hostel - C

395.56

-

95.34

... More
2nd Floor

-

-

-

... More
New hostel building

159.57

-

96.62

... More
Providing and applying white cement based putty of average thickness 1 mm of approved brand and manufacturer, over the plastered wall surfaces to prepare the surface even and smooth as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete.

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

1739.79

-

86.78

... More
Kitchen cum dining

265.37

-

86.78

... More
Boys hostel - A

898.53

-

86.78

... More
Boys hostel - B

1756.95

-

86.78

... More
Boys hostel - C

1056.08

-

86.78

... More
First floor

-

-

-

... More
New hostel building

1767.41

-

88.15

... More
Boys hostel - A

1018.53

-

88.15

... More
Boys hostel - B

2175.71

-

88.15

... More
Boys hostel - C

1341.74

-

88.15

... More
2nd Floor

-

-

-

... More
New hostel building

342.12

-

89.57

... More
Providing & painting two coats of Plastic emulsion paint with 1st quality of approved brand and manufacturer to give an even shade as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete.

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

1039.26

-

78.8

... More
Kitchen cum dining

152.72

-

78.8

... More
Boys hostel - A

760.85

-

78.8

... More
Boys hostel - B

1338.95

-

78.8

... More
Girls hostel

809.08

-

78.8

... More
First floor

-

-

-

... More
New hostel building

1101.96

-

80.4

... More
Boys hostel - A

760.85

-

80.4

... More
Boys hostel - B

1592.71

-

80.4

... More
Girls hostel

956.92

-

80.4

... More
2nd Floor

-

-

-

... More
New hostel building

182.55

-

82.07

... More
Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour, T&P etc. required for the complete in all respect. A/R - 2006, Page 244 Item No.11

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

31

-

3506.52

... More
Kitchen cum dining

30.8

-

3506.52

... More
First floor

-

-

-

... More
New hostel building

31

-

3506.52

... More
Providing fitting, fixing of Al. door with OEL anodized Al. door section of 9202 as vertical member, 9201 as top member and 9200 as bottom and middle member and 12mm thick pre-laminated board fixed on door frame by means of tapered clip No. 4660 and the frame to be completed by means of jointing angle No. 1855 including all cost of labour, T&P , hire charges of drilling machine, labour charges etc. complete.

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

34.78

-

4763.53

... More
Boys hostel - B

30.24

-

4763.53

... More
Boys hostel - C

15.12

-

4763.53

... More
First floor

-

-

-

... More
New hostel building

34.78

-

4763.53

... More
Boys hostel - A

15.12

-

4763.53

... More
Boys hostel - B

30.24

-

4763.53

... More
Boys hostel - C

15.12

-

4763.53

... More
Providing and fixing factory made uPVC white colour sliding glazed window above 1.50 m in height dimension comprising of uPVC multi-chambered frame with in-built roller track and sash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension of uPVC extruded glazing beads, uPVCextruded interlocks and uPVC extruded Inline sash adaptor (if required),EPDM gasket, wool pile, zinc alloy (white powder coated) handle on one side of extreme panel along with zinc plated mild steel multi point locking having transmission gear with keeps, zinc alloy (white powder coated) touch lock with hook (if required for wire mesh panel), stainless steel (SS 304 grade) body with adjustable double nylon rollers (weight bearing capacity to be 120 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc.After fixing frame the gap between frame and adjacent finished wallshall be filled with weather proof silicon sealent over backer rod ofrequired size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge. (Single / double glass panes wire mesh and silicon sealent shall be paid separately). Variation in profile dimension in higher side shall be accepted but no extra payment on this account shall be made.

-

-

-

... More
Note: For uPVC frame and sash extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable.

-

-

-

... More
Two track two panels sliding window made of (big series) frame 67 x 50 mm & sash 46 x 62 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension. (Area of window above 2.50 sqm upto 4.00 sqm.)

-

-

-

... More
Ground floor

-

-

-

... More
New hostel building

28.8

-

7798.3

... More
First Floor

-

-

-

... More
New hostel building

28.8

-

7798.3

... More
Supplying, fitting and fixing up Window (Sliding type) made up alluminium section 151-154, 151-155 as windows frame section No.151-155, 151-153 151-167 as shutter frame with 5mm thick Reflective glass as panel fitted with rubber beading including locking arrangement including all fitting cost of all materials, taxes, labour, T&P etc., complete as per direction of E.I.C.

-

-

-

... More
Kitchen cum dining

8.64

-

6008.9

... More
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per directionof Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)

-

-

-

... More
Boundary Wall

670

-

303.65

... More
Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.

-

-

-

... More
Boundary Wall

2965.9

-

99.95

... More
25mm thick grading concrete (1:2:2) on roof slab with 4.7mm & down graded size hard crusher broken granite chips on old work including watering curing cost of all materials, water-proofing compounds, wire mesh T.& P. required for the works etc complete.

-

-

-

... More
First floor

-

-

-

... More
Boys Hostel - A

242

-

334.71

... More
Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying :

-

-

-

... More
(a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours.

-

-

-

... More
The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.

-

-

-

... More
Ground floor

-

-

-

... More
Boys Hostel - A

48.87

-

516.6

... More
Boys Hostel - B

79.95

-

516.6

... More
Boys Hostel - C

18.98

-

516.6

... More
First floor

-

-

-

... More
Boys Hostel - A

48.87

-

516.6

... More
Boys Hostel - B

79.95

-

516.6

... More
Boys Hostel - C

18.98

-

516.6

... More
Dismantling and removing old tiled flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris within 50m lead

-

-

-

... More
Ground floor

-

-

-

... More
Boys Hostel - A

45

-

97.59

... More
Boys Hostel - B

72

-

97.59

... More
Boys Hostel - C

16.82

-

97.59

... More
First floor

-

-

-

... More
Boys Hostel - A

45

-

97.59

... More
Boys Hostel - B

72

-

97.59

... More
Boys Hostel - C

16.82

-

97.59

... More
Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead

-

-

-

... More
First floor

-

-

-

... More
Boys Hostel - A

6.53

-

1137.29

... More
Boys Hostel - B

12.38

-

1137.29

... More
Boundary Wall

55.97

-

1137.29

... More
Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris within 50m

-

-

-

... More
Ground floor

-

-

-

... More
Boys Hostel - A

4.62

-

325.94

... More
Boys Hostel - B

35.28

-

325.94

... More
Boys Hostel - C

17.64

-

325.94

... More
First floor

-

-

-

... More
Boys Hostel - A

19.74

-

325.94

... More
Boys Hostel - B

35.28

-

325.94

... More
Boys Hostel - C

17.64

-

325.94

... More
Dismantling and removing R.C.C. Chajja, Shelves, fins and parapet including stacking the useful materials for reuse and removing the debris within 50m lead

-

-

-

... More
Ground floor

-

-

-

... More
Boys Hostel - A

33.83

-

142.5

... More
Boys Hostel - B

23.25

-

142.5

... More
Boys Hostel - C

21.68

-

142.5

... More
First floor

-

-

-

... More
Boys Hostel - A

33.83

-

142.5

... More
Boys Hostel - B

23.25

-

142.5

... More
Boys Hostel - C

21.68

-

142.5

... More
Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead

-

-

-

... More
Ground floor

-

-

-

... More
Boys Hostel - A

718.82

-

40.72

... More
Boys Hostel - B

1428.92

-

40.72

... More
Boys Hostel - C

721.5

-

40.72

... More
Boundary Wall

402

-

40.72

... More
First floor

-

-

-

... More
Boys Hostel - A

726.06

-

40.72

... More
Boys Hostel - B

1530.48

-

40.72

... More
Boys Hostel - C

819.87

-

40.72

... More
Dismantling and removing old tiled cladding from walls including racking out joints 12mm deep stacking the useful materials for reuse and removing the debris within 50m lead

-

-

-

... More
Ground floor

-

-

-

... More
Boys Hostel - A

112.56

-

52.93

... More
Boys Hostel - B

285.6

-

52.93

... More
Boys Hostel - C

105

-

52.93

... More
First floor

-

-

-

... More
Boys Hostel - A

112.56

-

52.93

... More
Boys Hostel - B

285.6

-

52.93

... More
Boys Hostel - C

105

-

52.93

... More
AMBIANCE GARDENING

-

-

-

... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.

129

-

6.4

... More
Fine dressing of the ground.

129

-

1.9

... More
Supplying and stacking of good earth at site including royalty and carriage upto 5 k m lead complete (earth measured in stacks will be reduced by 20% for payment).

12.9

-

394.55

... More
Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) :

12.9

-

227.77

... More
Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge

25.8

-

18.9

... More
Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately).

129

-

27.68

... More
Providing and fixing Neelgiri/Mexican grass turf with earthy 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden (Dhurmos) and than rolling the surface with light roller make the surface smoothen and light, watering with sprinkler and maintenance for 30 days or more till the grass establish properly as per direction of officer incharge. (DSR_Horticulture_2020- 2.33, PAGE NO 246.)

129

-

214.4

... More
Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)

-

-

-

... More
Holes 90 cm dia, and 90 cm deep

30

-

143.1

... More
Holes 60 cm dia, and 60 cm deep

50

-

43.7

... More
TREE PLANTS & SHRUBS

-

-

-

... More
Providing and stacking of Foxtail palm well developed in big size HDPE bags as per direction of the officer-in-charge.

10

-

406.53

... More
Providing and displaying of Areca Palm plant, with 12 to 14 suckers, well developed, fresh and healthy with lush green foliage in 12x13 inch size of Bucket type cement pots & as per direction of the officer-in-charge.

10

-

357.2

... More
Providing and stacking of Delonix regia (Gulmohar) in big poly bags as per direction of the officer-in-charge.v

10

-

23.2

... More
Providing and stacking of Bottle palm well developed in big HDPE bags as per direction of the officer-in-charge.

10

-

929.2

... More
Providing and Displaying Bougainvillea Named Varieties Glabra, Peruviana, Spectabilis etc. well developed with fresh & healthy bushy plant in full bloom in Poly- Pot as per direction of the officer-in-charge.

10

-

1.3

... More
Providing and stacking of Plumeria alba with 3-4 branches and thick stem in big size HDPE bags as per direction of the officer-in-charge.

10

-

116.15

... More
Providing and stacking of Cassia fistula (Amaltash) in big poly bags as per direction of the officer-in-charge.

10

-

23.2

... More
INTERNAL & EXTERNAL SANITARY WORKS

-

-

-

... More
Fixing Indian type orissa pan confirming to IS 2556: Part 3 - 2004 duly embeded in cement concrete 1:4:8 using hard granite metal 4cm nominal size all complete as per specification.

-

-

-

... More
Boys Hostel - A

2

-

3982.45

... More
Boys Hostel - B

2

-

3982.45

... More
Boys Hostel - C

2

-

3982.45

... More
New Building & Kitchen

2

-

3982.45

... More
Supplying , fitting , fixing of porcelein wash hand basin of size 450mm x 350 mm of CERA make, catalogue no Canon 1012 Wash Basin of Equivalent of Parryware/ Hindware with rog bolts, CI brackets, hole for pillar cock with cast iron/ M.S. brackets painted while including cutting holes in wall and making good to the damages etc. all complete with materials , labour and T& P etc.

-

-

-

... More
Boys Hostel - A

2

-

3181.04

... More
Boys Hostel - B

2

-

3181.04

... More
Boys Hostel - C

2

-

3181.04

... More
New Building & Kitchen

2

-

3181.04

... More
Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per IS 13983 with C.I brackets , stainless steel plug 40 mm and PVC waste pipe 32mm dia, including painting of fittings and brackets, cutting and making good the walls wherever required

-

-

-

... More
Kitchen

1

-

7054.36

... More
Providing and fixing to wall or ceiling and floor rigid UPVC gipes class IV (8 kgf/cm2)/class III (6 kgf/cm2) conforming to IS:4985/2000 and pipe fittings of the following nominal bore with clamps including making good the wall, ceiling and floor all complete as per specification

-

-

-

... More
New Building & Kitchen

-

-

-

... More
(i) 15mm dia

50

-

132

... More
(ii) 20mm dia

25

-

184

... More
(iii) 25mm dia

25

-

216

... More
(iv) 32mm dia

30

-

277

... More
Providing and fixing on wall face unplasticised Rigid PVC soil, waste and rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10 mm gap for therma expansion, (i) Single socketed pipes

-

-

-

... More
110 mm dia .

-

-

-

... More
Boys Hostel - A

60

-

509.7

... More
Boys Hostel - B

80

-

509.7

... More
Boys Hostel - C

45

-

509.7

... More
New Building & Kitchen

70

-

509.7

... More
Supplying all materials, labour T&P and fitting arid fixlng brass/CP fittings of the following nominal bore with supply of all joiniting materials complete as per specification and direction of the Engineer-in-charge.

-

-

-

... More
New Building & Kitchen

-

-

-

... More
Providing and fixing 15mm dia CP two way bib cock

2

-

1040

... More
Providing and fixing 15mm dia Bib cock

4

-

819

... More
Providing and fixing 15mm CP Angular stop cock

4

-

789

... More
15mm dia pillar cock (Cera PRS-031)

3

-

253

... More
20mm dia pillar cock (Cera PRS-031)

3

-

615

... More
25mm dia brass/ gumetal fullway valve (ZOLOTO-108B)

1

-

915

... More
32mm dia brass/ gumetal fullway valve (ZOLOTO-108B)

1

-

1513

... More
Stainless steel jail grating with hole of multi floor trap

6

-

319

... More
Stainless steel jail grating with hole of nahani trap

4

-

168

... More
Providing and fixing vent cowl with ss jali

4

-

72

... More
Fixing Rotational moulded Poly Propelene double layer cylindrica vertical water storage tanks confirming to IS 12701-1996 including cutting holes through the tank and fixing mild steel tubes and fitting and providing extra sockets and jam nuts, fixing ball valve etc,incIuding hosting upto a height of 5 mtr above ground level and placing the tank to the required postion etc all complete as per specification and direction of the Er-in-charge.

-

-

-

... More
New Building & Kitchen

1

-

12682.5

... More
Supplying all materials, labour T&P and fitting arid fixlng brass/CP fittings of the following nominal bore with supply of all joiniting materials complete as per specification and direction of the Engineer-in-charge.

-

-

-

... More
Stainless steel jail grating with hole of nahani trap

-

-

-

... More
Boys Hostel - A

2

-

168

... More
Boys Hostel - B

2

-

168

... More
Boys Hostel - C

2

-

168

... More
20mm dia pillar cock (Cera PRS-031)

-

-

-

... More
Boys Hostel - A

2

-

615

... More
Boys Hostel - B

2

-

615

... More
Boys Hostel - C

2

-

615

... More
Providing and fixing 15mm CP Angular stop cock

-

-

-

... More
Boys Hostel - A

2

-

789

... More
Boys Hostel - B

2

-

789

... More
Boys Hostel - C

2

-

789

... More
INTERNAL & EXTERNAL ELECTRIFICATION WORK

-

-

-

... More
Recessed wiring to light point / exhaust fan point with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked in 20 mm dia non-metalic PVC conduit with 6Amp, 250 V clip in type switch ISI marked and ceiling rose ISI marked mounted on G.I modular box with face plate & cover of suitable size , with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accesories and connection as per direction of Engineer in Charge. ( Make of wire Finolex/ L&T / Anchor / Havels / V Guard )Group C

-

-

-

... More
Light point

-

-

-

... More
Boys Hostel - A

83

-

1050

... More
Boys Hostel - B

172

-

1050

... More
Boys Hostel - C

144

-

1050

... More
New Building & Kitchen

82

-

1050

... More
Recessed wiring to ceiling fan point with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor of Isl marked in 20 mm dia non-metalic PVC conduil with 6Amp, 250 V clip in type switch ISI marked and stepped modular Regulator ISI marked mounted on G.I modular box with face plate & cover of suitable size , with 1.5 sq.mm FR PVC insulated single core multislrand copper conductor as earth wire including all accesories and connection as per direction of Engineer in Charge. ( Make of wire Finolex/ L&T / Anchor / Havels / V Guard )Group C

-

-

-

... More
Fan Point

-

-

-

... More
New Building & Kitchen

17

-

1483

... More
Recessed wiring for 2 x 6 amp socket outlet controlled by 2 nos 6Amp, 250 V clip in type switch Isl marked mounted on single G.I moular box wlth face plate 6 cover of suitable size including all accesories and connection on separate board as per direction of Engineer in Charge,

-

-

-

... More
Boys Hostel - A

8

-

839

... More
Boys Hostel - B

8

-

839

... More
Boys Hostel - C

10

-

839

... More
New Building & Kitchen

10

-

839

... More
Recessed wiring for 5 / 6 amp socket outlet with 6Amp, 250 V clip in type switch ISI marked mounted on G.I moular box with face plate & cover of suitable size , with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accesories and connection on same switch board as per direction of Engineer in Charge.

-

-

-

... More
Boys Hostel - A

16

-

487

... More
Boys Hostel - B

22

-

487

... More
Boys Hostel - C

32

-

487

... More
New Building & Kitchen

33

-

487

... More
Recessed wiring for 6 pin 16 amp socket outlet with 5Amp, 250 v clip in type switch ISI marked mounted on G.I moular box with face plate & cover of suitable size , with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accesories and connection as per direction of Engineer in Charge.

-

-

-

... More
Boys Hostel - A

4

-

620

... More
Boys Hostel - B

16

-

620

... More
Boys Hostel - C

4

-

620

... More
New Building & Kitchen

8

-

620

... More
Recessed Wiring to submain in 2 x 2.5 sq.mm FR PVC insulated Single Core multistrand copper conductor of Isl marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty PVC conduit 1.6 mm thick along wilh 1 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired.

-

-

-

... More
Boys Hostel - A

150

-

149

... More
Boys Hostel - B

50

-

149

... More
Girls Hostel

180

-

149

... More
New Building & Kitchen

225

-

149

... More
Recessed Wiring to submain in 2 x 4 sq.mm FR PVC insulated Single Core multistrand copper conductor of l$l marked confirming to 13-694/1990 in 20 mm dia non-metalic heavy duty PVC conduit 1,6 mm thick along with 1 x 2.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired,

-

-

-

... More
Boys Hostel - A

120

-

173

... More
Boys Hostel - B

30

-

173

... More
Boys Hostel - C

100

-

173

... More
New Building & Kitchen

140

-

173

... More
Recessed Wiring to submain in 2 x 6 sq.mm FR PVC insulated Single Core multistrand copper conductor of lSl marked confirming to 15-694/1990 in 25 mm dia non,metalic heavy duty PVC conduit 1.6 mm thick along with 1 x 4.0 sq.mm FF PVC insulated single core multistrand copper conductor as earth wire as equired.

-

-

-

... More
Boys Hostel - A

50

-

209

... More
Boys Hostel - B

20

-

209

... More
Boys Hostel - C

20

-

209

... More
New Building & Kitchen

38

-

209

... More
Supplying and fixing of of 50mm G.I pipe(Medium Class) along with accessories in ground including cutting & making good the same as required.

-

-

-

... More
Boys Hostel - A

2

-

184

... More
Boys Hostel - B

2

-

184

... More
New Building & Kitchen

3

-

184

... More
Earthing with G.I. earth plate 600 mm x 600mm x 6 mm thick ISI marked including accessories and providing masonary with cover plate having loccking arrangement and watering pipe etc with charcoal and salt as required.

-

-

-

... More
Boys Hostel - A

2

-

3344

... More
Boys Hostel - B

2

-

3344

... More
New Building & Kitchen

3

-

3344

... More
Supplying and laying 25 mm x 5 mm G.I earth strip Isl marked on surface or in recess for connection etc as required.

-

-

-

... More
Boys Hostel - A

70

-

128

... More
Boys Hostel - B

65

-

128

... More
New Building & Kitchen

108

-

128

... More
Surface mounted indoor type SINGLE LED TUBE Luminaire with LED Lamp Similar to WIPRO Cat No. WIO921208 or eauivalent,

-

-

-

... More
Boys Hostel - A

67

-

1350

... More
Boys Hostel - B

130

-

1350

... More
Boys Hostel - C

100

-

1350

... More
New Building & Kitchen

82

-

1350

... More
Supplying and fixing of Energy efficient Street light LED luminaire with high pressure die cast aluminium housing with pure polyests powder coated dark grey Housing with high purity PMMA Iense,Toughened glass With silicon gaskets for IP66 protection, wattage in range 30 watt Similar to WIPRO Cat No. LR02-331-XXX-57-XX or equivalent

-

-

-

... More
Boys Hostel - A

2

-

3066

... More
Boys Hostel - B

2

-

3066

... More
Boys Hostel - C

2

-

3066

... More
New Building & Kitchen

4

-

3066

... More
Supply,lnstallation, Testing and Commissioning of ceiling fan 1200mm sweep, including wiring the down rods of standard length (upto 30 cm) with 1.5 sq.mm FH pVC insulated single core multiatrand copper conductor etc. as required.

-

-

-

... More
Boys Hostel - A

6

-

2594

... More
Boys Hostel - B

10

-

2594

... More
Boys Hostel - C

20

-

2594

... More
New Building & Kitchen

17

-

2594

... More
suppry, Installation, testing and commissioning of exhaust fan of 300 mm sweep 900 rpm in the existing opening, including making the hole to suit the size ol the above fan, making good the damage complete, connection, etc as required.

-

-

-

... More
Boys Hostel - A

8

-

2872

... More
Boys Hostel - B

12

-

2872

... More
Boys Hostel - C

16

-

2872

... More
New Building & Kitchen

4

-

2872

... More
Supply,lnstallation, Testing and Commissioning of wall fan 400mm sweep, including wiring with 1.5 sq.mm FH pVC insulated single core multiatrand copper conductor etc. as required.

-

-

-

... More
Boys Hostel - A

12

-

3017

... More
Boys Hostel - B

32

-

3017

... More
Boys Hostel - C

22

-

3017

... More
Supply and fixing of single pole MCB with sheet steel enclosure, distribution board, on surface /recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, detachable gland plate, interconnection, phosphate and powder painted including earthing etc. as required ( But with out MCB/ RCCB/ ISOLATOR)

-

-

-

... More
4 WAY, DOUBLE DOOR

-

-

-

... More
New Building & Kitchen

1

-

1208

... More
12 WAY, DOUBLE DOOR

-

-

-

... More
Boys Hostel - A

2

-

1919

... More
Boys Hostel - C

2

-

1919

... More
New Building & Kitchen

2

-

1919

... More
Supply and lixing of following ratin$ 240 V Minature Circuit Breaker (MCB) having a sensitivity current up to 1OkA in the existing IVCB DB lsl marked complete with qonnection testing and commissioning etc as required.

-

-

-

... More
Boys Hostel - A

24

-

133

... More
Boys Hostel - C

24

-

133

... More
New Building & Kitchen

28

-

133

... More
Supply and fixing of following rating 240 V Residual Current Breaker with Overcurrent protection (RCBO) having a sensitivity current up to 100rnA in the existing MCB DB lSl marked complete with connection testing and commissioning etc as required.

-

-

-

... More
Boys Hostel - A

2

-

2717

... More
Boys Hostel - C

2

-

2717

... More
New Building & Kitchen

3

-

2717

... More
Supply, installation, testing and commissoning of 63amp TPN main switch of following capacity (IS 13940 part-3/19930 on existing surface / wall mounting and complete with HRC fuse links inter connections, earthing etc as per direction of Engineer-in-charge.9SEIMENS/HPL/ANCHOR/L&T/HAVELS/C&S/RK)

-

-

-

... More
New Building & Kitchen

1

-

2645.78



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.