ST And SC Development Minorities And Backward Classes Welfare Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

ST And SC Development Minorities And Backward Classes Welfare Department Tender

Civil And Construction
Coronavirus COVID 19
Eprocure
Opening Date20 Apr 2021
Closing Date7 May 2021
Tender Amount₹ 4,43,44,542 
Notes
Download

Costs

Summary

Upgradation Of Girls High School Badapada (educational Complex) To Higher Secondary School

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
C.C Road

23.41

-

15233.07

... More
Earth work excavation of foundation in hard soil in foundation within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3m in depth & levelling bed etc. complete as directed by the Engineer-in-Charge. Administrative Block

510.58

-

19273.14

... More
Boys Hostel

471.43

-

19273.14

... More
Boundary wall

775.39

-

19273.14

... More
C.C. Drain

389.76

-

19273.14

... More
C.C. Road

678.24

-

19273.14

... More
Providing and laying coarse sand in foundation and plinth filling with Sand in 9" thick layers of approved quality free from dust, dirt and other foreign materials to proper line and grade, watering and ramming etc. complete with all lead, lifts de-lifts including labour charges with cost, conveyance tax and royality of all material, labour, T&P and other incidental charges etc. complete as per direction of Engineer-in-charge Administrative Block

558.08

-

418.69

... More
b) Boys Hostel

306.41

-

418.69

... More
Boundary wall

76.75

-

418.69

... More
C.C. Drain

77.95

-

418.69

... More
C.C. Road

383.35

-

418.69

... More
Filling in foundation and plinth with excavated materials including watering and compacting including cost of all materials, conveyance, all taxes and royalties, loading and unloading with lead lift and delift, including cost of all labour, T&P, etc. complete as per direction of the Engineer-in-charge. Administrative Block

510.58

-

10155.38

... More
Boys Hostel

56.88

-

10155.58

... More
Cement concrete in proportion (1:4:8) in foundation and floors using 4 cm size (3/2") clean hard black crusher broken granite metal free from skin & weather skin of approved quality from approved quarry including hoisting, lowering and laying in layers not exceeding 15 cm (6")thick to the required level, ramming, compacting to proper thickness, watering and curing etc. complete with cost conveyance, royalty and all taxes of materials, cost of labour, T &P and machineries etc. completed with all lead lift and delift including centering & shuttering if necessary, in all respect to the specification and as directed by the Engineer-in-charge. Administrative Block

287.74

-

4881.3

... More
Boys Hostel

322.11

-

4881.3

... More
Boundary wall

266.78

-

4881.3

... More
C.C. Drain

211.58

-

4881.3

... More
C.C. Road

442.33

-

4881.3

... More
Cement Concrete in Proportion (1:2:4) foundation and floors using 12mm (1/2”) size Clean hard black crusher broken granite metal of approved quality from approved quarry including hosting lowering and laying in layers not exceeding 15cm (6”) thick to the required level, ramming watering and curing etc complete including all cost, conveyance, taxes and royalties of materials and labour with T&P required for the work etc complete. Ground Floor Boys Hostel

15.63

-

6667.1

... More
C.C. Drain

77.95

-

6667.1

... More
C.C. Road

176.93

-

6667.1

... More
1st Floor Boys Hostel

1.26

-

6958.24

... More
R.C.C. work of M-20 grade having a minimum compressive strength (in work test) of 200 Kg/cm.sq in 15 cm. Cubes at 28 days with IS 456 and 516 using 12 mm to 20 mm size down graded (20mm Not to exceed 25 %) hard black crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying and compaction with mechanical vibrators, watering and curing for 4 weeks, (Including centering, shuttering) and finishing the exposed surfaces smooth with cost, conveyance, royalties and taxes of all materials and labour with T&P, with all lead lift and delifts required for the work etc. complete in all respect with proper specification for all structural components as mentioned below and as directed by the Engineer-in-charge. GROUND FLOOR a) Columns Base & Footing Administrative Block

108.08

-

5638.25

... More
a) Columns Base & Footing Boys Hostel

63.37

-

5638.25

... More
a) Columns Base & Footing Boundary wall

59.38

-

5638.25

... More
b) Plinth Beam Administrative Block

22.81

-

6001.03

... More
b) Plinth Beam Boys Hostel

30.83

-

6001.03

... More
b) Plinth Beam Boundary wall

44.02

-

6001.03

... More
c) Column in superstructure Administrative Block

39.44

-

11079.82

... More
c) Column in superstructure Boys Hostel

28.02

-

11079.82

... More
c) Column in superstructure Boundary wall

32.66

-

11079.82

... More
d) Sill Bend / Lintel Bend - Ground Floor Administrative Block

15.08

-

9116.2

... More
d) Sill Bend / Lintel Bend - Ground Floor Boys Hostel

11.69

-

9116.2

... More
e) Stair case - Ground Floor Administrative Block

3.62

-

9094.48

... More
e) Stair case - Ground Floor Boys Hostel

5.96

-

9094.48

... More
f) Roof Beam - Ground Floor Administrative Block

73.32

-

11079.82

... More
f) Roof Beam - Ground Floor Boys Hostel

36.27

-

11079.82

... More
g) Roof Slab - Ground Floor Administrative Block

149.02

-

9495.78

... More
g) Roof Slab - Ground Floor Boys Hostel

93.42

-

9495.78

... More
h) R.C.C Chajja - Ground Floor Administrative Block

4.54

-

12272.77

... More
h) R.C.C Chajja - Ground Floor Boys Hostel

3.35

-

12272.77

... More
1st FLOOR a) Column in Superstructure- 1st Floor Administrative Block

24.83

-

12280.97

... More
a) Column in Superstructure- 1st Floor Boys Hostel

14.48

-

12280.97

... More
b) Sill Bend / Lintel Bend - 1st Floor Administrative Block

12.3

-

9925.35

... More
b) Sill Bend / Lintel Bend - 1st Floor Boys Hostel

9.58

-

9925.35

... More
c) Stair case - 1st Floor Administrative Block

3.62

-

9895.63

... More
c) Stair case - 1st Floor Boys Hostel

3.76

-

9895.63

... More
d) Roof Beam - 1st Floor Administrative Block

46.85

-

12280.97

... More
d) Roof Beam - 1st Floor Boys Hostel

29.6

-

12280.97

... More
e) Roof Slab - 1st Floor Administrative Block

85.06

-

10376.93

... More
e) Roof Slab - 1st Floor Boys Hostel

69.37

-

10376.93

... More
f) R.C.C Chajja - 1st Floor Administrative Block

2.17

-

13707.52

... More
f) R.C.C Chajja - 1st Floor Boys Hostel

2.92

-

13707.52

... More
Supplying, fitting, and placing uncoated HYSD bar reinforcement as per drawing & Labour for Straightening, cutting, bending Binding, Cranking, Hooking and jointing (if required) HYSD rod (SAIL)and tying the grills, hoisting and placing in proper position as required for R.C.C. works including cost, conveyance and all taxes of HYSD steel rods and binding wires of 18 to 20 gauge with cost of labour and T & P required for the work etc. with all lead lift and delift complete in all respect to the specification and as directed by the Engineer-in-charge a) Ground Floor Administrative Block

499.46

-

6721.21

... More
a) Ground Floor Boys Hostel

332.12

-

6721.21

... More
a) Boundary wall

186.78

-

6721.21

... More
b) 1st FLOOR Administrative Block

222.07

-

6742.54

... More
b) 1st Floor Boys Hostel

156.83

-

6742.54

... More
Brick Masonary with cement Mortar (1:6) in superstructure by using of solid cement concrete block Machine mixed and Hydraulic compressed having crusihing strength not less than 75 Kg per Sq. Cm. including splays, cutting, circular moulding chamfering and corbelling, watering and curing etc. complete as per direction of Engineer-in-Charge. a) Ground Floor Administrative Block

152.06

-

4952.67

... More
a) Ground Floor Boys Hostel

179.63

-

4952.67

... More
a) Boundary wall

272.52

-

4952.67

... More
b) 1st FLOOR Administrative Block

83.44

-

5209.7

... More
b) 1st Floor Boys Hostel

154.31

-

5209.7

... More
6mm (1/4") thick Cement Plaster in C.M (1:4) finished smooth to to R.C.C. surfaces including closed deep chipping & slury treatment, watering and curing, scaffolding screening sand etc. complete with cost, conveyance, taxes and royalties of all materials and labour with T & P required for the work etc. complete in all respect as per the direction of the Engineer-in-charge. a) Ground Floor Boys Hostel

663.47

-

156.35

... More
b) 1st Floor Boys Hostel

548.13

-

160.07

... More
2.5 cm (1") thick grading concrete over roof slab in Cement Concrete (1:2:2) 6mm (1/4") size clean hard black crusher broken granite chips of approved quality from approved quarry including hoisting, lowering and laying in layers ramming watering and curing etc. complete including all cost, conveyance, taxes and royalities of material and labour with T&P required for the work etc. complete as per the direction of the Engineer-in-charge. a) Ground Floor Administrative Block

157.3

-

309.86

... More
a) Ground Floor Boys Hostel

195.79

-

309.86

... More
b) 1st FLOOR Administrative Block

191.07

-

336.88

... More
b) 1st Floor Boys Hostel

555.38

-

336.88

... More
12mm thick cement plaster (1:6) finished smooth to out side brick walls after racking out the joints cleaning & finishing the plaster surface smooth including wash and screening the sand free from dust, dirt and other foreign materials by proper sieiving and grade, watering and curing with cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalties etc. complete with all lead lift and delift complete in all respect to the specification and proper grade and as directed by the Engineer-in-charge. a) Ground Floor Administrative Block

629.65

-

143.31

... More
a) Ground Floor Boys Hostel

512.32

-

143.31

... More
a) Boundary wall

2054.95

-

143.31

... More
b) 1st FLOOR Administrative Block

275.2

-

146.37

... More
b) 1st Floor Boys Hostel

394.78

-

146.37

... More
16mm thick cement plaster (1:6) finished smooth to out side brick walls after racking out the joints cleaning & finishing the plaster surface smooth including wash and screening the sand free from dust, dirt and other foreign materials by proper sieiving and grade, watering and curing with cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalties etc. complete with all lead lift and delift complete in all respect to the specification and proper grade and as directed by the Engineer-in-charge. a) Ground Floor Administrative Block

996.58

-

202.35

... More
a) Ground Floor Boys Hostel

1984.99

-

202.35

... More
a) Boundary wall

1798.08

-

202.35

... More
b) 1st FLOOR Administrative Block

601.83

-

206.72

... More
b) 1st Floor Boys Hostel

1682.49

-

206.72

... More
Providing & fixing of Floor Tiles in floors treads or steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigments to match the shade including rubbing and polishing as per the design & drawing with cost of all materials, labour, conveyance, taxes , T&P etc. complete as per the direction of Engineering -in-charge. a) Ground Floor Adminstrative Block

18.53

-

1027.81

... More
a) Ground Floor Boys Hostel

54.77

-

1027.81

... More
b) 1st FLOOR Administrative Block

12.96

-

1048.34

... More
b) 1st Floor Boys Hostel

41.06

-

1048.34

... More
Supplying, fitting and fixing in position 6.5-6.7mm thick Wall Tiles in dadoes in all floors at all heights and riser of steps with application of 12 mm thick cement mortar of (1:3) in proper slop and filling the gaps with white cement and colouring the surface with silicon paint finished as per the design & drawing with all cost of materials, labour,conveyance, taxes T&P and complete as per the direction of the Engineer-in-charge. a) Ground Floor Administrative Block

44.96

-

1070.36

... More
a) Ground Floor Boys Hostel

119.91

-

1070.36

... More
b) 1st FLOOR Administrative Block

30.47

-

1099.9

... More
b) 1st Floor Boys Hostel

127.57

-

1099.9

... More
Manufacturing and supplying, fitting & fixing of M.S Door, Window, Ventilator and Grill Gate made up all round angular frame size 35 x 35 x 5 mm , Door and Window angular frame size 25 x 25 x 3/5 mm with 20 gauge C.R. Sheet supporting flat size 25 x 8 mm and 18 x 5 mm including fitting of clamp, hinges, tower Blot, aldrop wind tie hooks and fixing the anchor clamps with CC (1:2:4) of minimum size holdfast concreting 15 cm x 15 cm x 15 cm including curing the concrete with all necessary scaffolding and to proper line and length with all cost conveyance tax of materials and labour with T & P required for the work, with all lead lift and delift complete in all respect to the specification and as directed by the Engineer-in-charge Ground Floor a) Door, Window & Ventilator/ Grill - Ground Floor

4149

-

70

... More
a) Ground Floor Boys Hostel

6987.63

-

70

... More
a) Boundary wall

1024

-

70

... More
b) 1st FLOOR Administrative Block

2443.25

-

70

... More
b) 1st Floor Boys Hostel

6008.98

-

70

... More
Labour Charges for Fitting & Fixing M.S. Door, Window & Grill Gate & Grills in position as per drawing and design including all cost of fixing materials, labour etc. complete as directed by the Engineer-in-charge. a) Ground Floor Administrative Block

120.21

-

389.76

... More
a) Ground Floor Boys Hostel

183.61

-

389.76

... More
a) Boundary wall

23.78

-

389.76

... More
b) 1st FLOOR Administrative Block

69.68

-

389.76

... More
b) 1st Floor Boys Hostel

158.16

-

389.76

... More
Painting two coats with approved plastic enamel paints with approved shade on new Door and Window over a coat of primer/ Red Oxide paint including sand papering polishing the surface with all cost, conveyance, royalty and all taxes of materials including cost of paints and primer, cost of labour and T&P etc. required for the work with all lead lift and delift complete in all respect to the specification and proper grade and as directed by the Engineer-in-charge a) Ground Floor Administrative Block

293.66

-

183.1

... More
a) Ground Floor Boys Hostel

447.71

-

183.1

... More
b) 1st FLOOR Administrative Block

165.43

-

192.1

... More
b) 1st Floor Boys Hostel

386.5

-

192.1

... More
Providing Painting with two coats to the entire outside surface with weather coat of any approved make to the outer surface after scrapping and cleaning the surface over one coat of water bound wall primer including all cost of materials, scaffolding, labour, watering & curing T&P etc. complete as per direction of the Engineer-in-charge. a) Ground Floor Administrative Block

629.65

-

129.25

... More
a) Ground Floor Boys Hostel

512.32

-

129.25

... More
b) 1st FLOOR Administrative Block

275.2

-

134.01

... More
b) 1st Floor Boys Hostel

394.78

-

134.01

... More
Finishing walls with water proofing cement paint of approved shade on new work 2 coats to give an even shade including cost of brushes and putty and including cost of paint (Details for 10 Sqm)Engineer-in-charge. Boundary wall

3853.03

-

34.4

... More
Providing Painting with two coats to the entire inside surface with distempering of any approved make to the outer surface after scrapping and cleaning the surface over one coat of water bound wall primer including all cost of materials, scaffolding, labour, watering & curing T&P etc. complete as per direction of the Engineer-in-charge a) Ground Floor Administrative Block

996.58

-

138.43

... More
a) Ground Floor Boys Hostel

2648.46

-

138.43

... More
b) 1st FLOOR Administrative Block

601.83

-

141.31

... More
b) 1st Floor Boys Hostel

2230.62

-

141.31

... More
Supplying fitting and fixing of vitrified tile in floors of size 600mmx600mm of approved make conforming to IS:13755 laid on 210mm thick Cement Mortar (1:4) (1 Cement : 4 Course Sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of Engineer-in-Charge a) Ground Floor Administrative Block

1121.42

-

978.43

... More
a) Ground Floor Boys Hostel

693.99

-

978.43

... More
b) 1st FLOOR Administrative Block

1083.14

-

987.94

... More
b) 1st Floor Boys Hostel

567.57

-

987.94

... More
Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials etc. complete {R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs, etc. complete as per direction of the E.I.C. a) C.C. Drain

877.35

-

103.65



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.