ST And SC Development Minorities And Backward Classes Welfare Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
ST And SC Development Minorities And Backward Classes Welfare Department Tender
Civil And Construction
Building Construction
Eprocure
Opening Date10 Jun 2022
Closing Date5 Jul 2022
Tender Amount₹ 40,47,840
Costs
EMD
Refer DocumentsDocument Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_STSCD_78412_5Bid Award Id
ViewTender No
ITDANBG-02/22-23Tender Authority
ST And SC Development Minorities And Backward Classes Welfare Department ViewPurchaser Address
-Website
http://http://www.stscodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
RRHG Stone masonry in F&P in C.M (1 :6) including cost, convayancy & royalty etc. complete.
14.56
-
3266.2
... More
Fly -Ash brick masonry in C.M (1:6) in super structure using fly-ash. bricks of 9 " size having a crushing strength not less than 35 Kg/sq.cm including splays cutting, circular moulding, chamfering and corbelling, and watering and curing etc. complete including cost conveyance, royalty and all taxes of materials with cost of labour, T & P etc. required for the work complete in all respect as directed by the Engineer-In-Charge.
GROUND FLOOR
50.11
-
4358.9
... More
FIRST FLOOR
105.46
-
4659.5
... More
R.C.C. work M-200 grade with 20 mm & down graded h.g. chips consistent with strength and strengthen cover of concrete, of approved quality and from approved quarry mixing with concrete mixture & laying mannually including hoisting with and laying concrete in layer not exceeding 15cm in depth to the required thickness and compacting as per the direction of the Engineer-in-charge including rigid & smooth centering , shuttering , watering and curing for four weeks and finishing the exposed surface smooth with cost, conveyance, taxes and royalities and taxes of all materials, labour T & P, hire and running charges of machineries required for the work, but excluding cost,conveyance, of M.S/T.S Rods and direction of Engineer-in-charge.
A.GROUND FLOOR
Plinth Bend
9.08
-
5316.9
... More
Columns & Beam
3.56
-
12193.4
... More
Slab & Chajja
7.49
-
9152.4
... More
B.FIRST FLOOR
Lintle Bend
4.92
-
9501.3
... More
Columns & Beam
24.8
-
13744.7
... More
Slab & Chajja
41.99
-
10095.5
... More
Supplying,straightening, cutting, bending, binding, cranking, hooking, and jointing, (if required) the HYSD rod and tying the grills, hoisting and placing in proper position as required for R.C.C. works including cost, conveyance and all taxes of HYSD. rods and binding wires of 18 to 20 gauge with cost of labour and T & P required for the work etc. complete in all respect as directed by the Engineer-in- charge. GROUND FLOOR
20.13
-
8552.3
... More
FIRST FLOOR
75.3
-
8572.7
... More
20 mm thick cement plaster in C.M. (1:6) over stone masonary, after raking out joints finished smooth including watering and curing, cost conveyance royalty and all taxes of materials with cost of labour and T & P etc, required for the work complete in all respect. GROUND FLOOR
26.92
-
206.9
... More
16 mm thick cement plaster in C.M. (1:6) over brick work (inside walls), after raking out joints finished smooth including watering and curing, cost conveyance royalty and all taxes of materials with cost of labour and T & P etc, required for the work complete in all respect. GROUND FLOOR
156.49
-
197
... More
FIRST FLOOR
820.63
-
201.2
... More
12 mm thick cement plaster in cement mortar (1:6) over stone masonary finished smooth including watering and curing, cost conveyance royalty and all taxes of materials with cost of labour and T & P etc, required for the work complete in all respect. GROUND FLOOR
208.98
-
138
... More
FIRST FLOOR
374.88
-
140.8
... More
2.5 cm A.S. flooring with cement concrete (1:2:4) including punning using 12mm H.G.Chips including cost, convayancy & royalty etc. complete.
GROUND FLOOR
32.85
-
303.2
... More
Fixing of Vetrified Tile flooring with proper slope with (1:1) cement mortar and color over 10 cm thick PCC with watering, curing for seven days with cost, conveyance, royality, taxes of all materials labour including cutting and wax polishing etc complete
FIRST FLOOR
226.28
-
1145.3
... More
Fixing Ceramic Tile in floors, trade or steps & landing on 25 mm thick cement plaster (1:1) jointed with neat cement slurry mixed with pigments to match the shade of the tiles rubing and polishing etc. complete
GROUND FLOOR
92.63
-
1000.7
... More
FIRST FLOOR
64.73
-
1018.9
... More
Fixing of Ceramic tiles of approved shade and design over 12 mm thick cement plaster (1:3) over brickwork for dadoes, finished smooth with proper thickness, watering, curing for seven days with cost conveyance, royality, taxes of all materials, labour etc complete.
GROUND FLOOR
101.29
-
1053.8
... More
FIRST FLOOR
99.44
-
1080
... More
Weather coating two coats to the wall with approved shade over a coat of wall primer on new work to give on even shade including cost of weather conveyance, taxes of all materials, labour etc complete.
GROUND FLOOR
467.08
-
125.5
... More
FIRST FLOOR
374.88
-
128
... More
Distempering two coats over a coat of primer to walls with distemper of approved shade on new work to give on even shade including cost of distemper conveyance, taxes of all materials, labour etc complete.
GROUND FLOOR
829.72
-
64.65
... More
FIRST FLOOR
1024.91
-
66
... More
Supplying fitting fixing M.S. shutter for door including all cost, conveyance and taxes of all materials and labour charge etc. complete in all respect as per direction of Engineer-in-Charge.
GROUND FLOOR
492.3
-
78.8
... More
FIRST FLOOR
1356
-
78.8
... More
Supplying fitting fixing of M.S.grill including all cost, conveyance and taxes of all materials and labour charge complete etc in all respect as per direction of Engineer-in-Charge.
FIRST FLOOR
593.82
-
71
... More
Painting two coats with any approved paints over a coat of priming to new wood work and iron works including sand papering polishing the surface with all cost, conveyance, royalty and all taxes of materials including cost of paints and primer, cost of labour and T & P etc. required for the work complete in all respect. GROUND FLOOR
36.92
-
189.3
... More
FIRST FLOOR
127.48
-
193.6
... More
Supplying fitting of Stainless steel in Hand railing...etc
FIRST FLOOR
20
-
3489.3
... More
Providing 110mm dia P.V.C rain water Pipe…etc.complete
FIRST FLOOR
7.5
-
250
... More
Dismantalling brick or stone masonry in lime or cement mortar etc. complete.
FIRST FLOOR
8.4
-
1098.91
... More
Dismantling & removing R.C .C Columns,beams, slab, stair case. Landings, lintels... Etc Complete.
FIRST FLOOR
3.98
-
1167.31
... More
Cost of Display Board
1
-
1000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements