ST And SC Development Minorities And Backward Classes Welfare Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

ST And SC Development Minorities And Backward Classes Welfare Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date3 Aug 2024
Closing Date14 Aug 2024
Tender Amount₹ 96,63,431 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement Concrete in Proportion (1:4:8) in foundation and floors using 4cm (3/2”) size Clean hard black crusher broken granite metal of approved quality from approved quarry including hosting lowering and laying in layers not exceeding 15cm (6”) thick to the required level, ramming watering and curing etc complete including all cost, conveyance, taxes and royalties of materials and labour with T&P required for the work etc complete.

51.09

283051

5540.25

... More
Fly Ash Brick Masonry work in cement motor (1:6) in Foundation and Plinthusing Fly Ash brick of 9” size having crushing strength not less than 35 Kg per Sq. Cm. including splays cutting, circular molding, chamfering and corbelling, watering and curing etc complete as per direction of Engineer-in-Charges.

40.7

216408

5317.15

... More
Cement Concrete in Proportion (1:2:4) foundation and floors using 12mm (1/2”) size Clean hard black crusher broken granite metal of approved quality from approved quarry including hosting lowering and laying in layers not exceeding 15cm (6”) thick to the required level, ramming watering and curing etc complete including all cost, conveyance, taxes and royalties of materials and labour with T&P required for the work etc complete.

3.9

28985

7432.3

... More
Fly Ash Brick Masonry work in Cement Mortar (1:4) in Foundation and Plinth using Fly Ash brick of 9” size having crushing strength not less than 35 Kg per Sq. Cm. including splays cutting, circular molding, chamfering and corbelling, watering and curing etc complete as per direction of Engineer-in-Charges.

20.98

116533

5554.5

... More
R.C.C. Work of M-20 grade with 20mm and down grade black hard granite crusher broken chips of 150mm cubes at 28days using minimum quality of cement as per clause 003.5 of IRC – 21 – 1987 and IS – 456 – 1987 with clean crusher broken hard granite chips of 20mm. to 10mm including watering and curing, Centering and Shuttering for R.C.C. Work, Cost, conveyance, tax and royalty of all materials and labour with T&P required for the work etc complete. Column Footing

38.83

279209

7190.55

... More
Plinth Beam

12.05

96545

8012.1

... More
Column S/S

13.9

237108

17058.15

... More
Lintel Bend

5.12

42868

8372.74

... More
Chajja

15.65

18609

1189.1

... More
Stair Case

3.98

59554

14963.55

... More
Roof Beam

14.6

219207

15014.2

... More
Roof Slab

37.6

511642

13607.5

... More
Supplying fitting and placing uncoated HYSD Bar reinforcement complete as per drawing and technical specification and placing in proper position as required for R.C.C. Work including cost, conveyance, taxes of Steel and cost of binding wire 18 to 20 gauge and labour with T&P required for the work etc complete in all respect in all floors as per direction of Engineer-in-Charges.

143.32

1236715

8629.05

... More
Fly Ash Brick Masonry work in Cement Mortar (1:6) in Superstructure using Fly Ash brick of 9” size having crushing strength not less than 35 Kg per Sq. Cm. including splays cutting, circular molding, chamfering and corbelling, watering and curing etc complete as per direction of Engineer-in-Charges.

74.88

400645

5350.5

... More
6mm (1/4”) thick Cement Plaster in C.M. (1:4) finished smooth to RCC Surface including watering and curing, Scaffolding screening sand etc complete with cost, conveyance, taxes and royalties of all materials and labour with T&P required for the work etc complete in all respect in all floors as per direction of Engineer-in-Charges.

244.49

42749

174.85

... More
2.5cm (1”) thick Grading Concrete over roof slab in Cement Concrete (1:2:2) 6mm (1/4”) size Clean hard black crusher broken granite Chips of approved quality from approved quarry including hosting lowering and laying in layers ramming watering and curing etc complete including all cost, conveyance, taxes and royalties of materials and labour with T&P required for the work etc complete.

14.16

4861

343.35

... More
12mm thick Cement Plaster in Cement Mortar (1:6) over brick work after raking out joints cleaning & finishing the plaster surface smooth including watering and curing, Scaffolding screening sand etc complete with cost, conveyance, taxes and royalties of all materials and labour with T&P required for the work etc complete in all respect in all floors as per direction of Engineer-in-Charges.

334.47

53481

159.9

... More
16mm thick Cement Plaster in Cement Mortar (1:6) over brick work after raking out joints cleaning & finishing the plaster surface smooth including watering and curing, Scaffolding screening sand etc complete with cost, conveyance, taxes and royalties of all materials and labour with T&P required for the work etc complete in all respect in all floors as per direction of Engineer-in-Charges.

623.42

141578

227.1

... More
Supplying fitting and fixing of vitrified tile in floors of size 600mmx600mm of approved make conforming to IS:13755 laid on 210mm thick Cement Mortar (1:4) (1 Cement : 4 Course Sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of Engineer-in-Charge

209.27

226972

1084.59

... More
Supplying fitting and fixing of vitrified industrial tile in floors of size 600mmx600mm of approved make conforming to IS:13755 laid on 210mm thick Cement Mortar (1:4) (1 Cement : 4 Course Sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of Engineer-in-Charge

33.53

33658

1003.84

... More
Providing & fixing of Floor Tiles in floors treads or steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigments to match the shade including rubbing and polishing as per the design & drawing with cost of all materials, labour, conveyance, taxes , T&P etc. complete as per the direction of Engineering -in-charge.

34.11

40822

1196.8

... More
Supplying, fitting and fixing in position 6.5-6.7mm thick Wall Tiles in dadoes in all floors at all heights and riser of steps with application of 12 mm thick cement mortar of (1:3) in proper slop and filling the gaps with white cement and colouring the surface with silicon paint finished as per the design & drawing with all cost of materials, labour,conveyance, taxes T&P and complete as per the direction of the Engineer-in-charge.

57.6

52162

905.6

... More
Manufacturing and Supplying of M.S. Door, Window, Ventilator and Grill Gate made up all round angular frame size 35x35x5mm, Door and Window angular frame size 25x25x3/5mm with 20 gage C.R. Sheet supporting flat size 25x8mm and 18x5mm including fitting of clamp, hinges, tower bolt, aldrops including all cost, conveyance tax of materials and labour with T&P required for the work etc complete

624.83

47362

75.8

... More
Labour Charges for fitting and fixing of M.S. Door, Window, Grill Gate and Grills including all cost of Labour with T&P required for the work etc complete.

23.99

9143

381.12

... More
Painting Two Coats (Plastic Enamel Paint) with any approved shade on New Door and windows over a coat of Primer/Red Oxide Paint including all cost, conveyance, tax of materials and labour with T&P required for the work etc complete.

23.99

5240

218.45

... More
Providing & Painting with two coats to the entire outside surface with Weather Coat of any approved make to the outer surface after scraping and cleaning the surface over one coat of Water Bound Wall Primer including all cost of materials, scaffolding, labour, watering & curing T&P etc complete as per direction of Engineer-in-charge.

334.47

51775

154.8

... More
Finishing surface of walls with Cement based Wall Putty (Water Based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, taxes labour T&P required for the work etc. complete

810.31

57329

70.75

... More
Wall painting two coats with plastic emulsion paint of approved shade on new work to give an even shade including cost of paint.

810.31

76047

93.85

... More
Providing & Painting with Priming 1 coat with Water Bound Cement Primer over plaster surface of any approved make to the outer surface after scraping and cleaning the surface including all cost of materials, scaffolding, labour, watering & curing T&P etc complete as per direction of Engineer-in-charge.

810.31

55789

68.85

... More
FIRST FLOOR Cement Concrete in Proportion (1:2:4) foundation and floors using 12mm (1/2”) size Clean hard black crusher broken granite metal of approved quality from approved quarry including hosting lowering and laying in layers not exceeding 15cm (6”) thick to the required level, ramming watering and curing etc complete including all cost, conveyance, taxes and royalties of materials and labour with T&P required for the work etc complete.

1.21

9397

7766.8

... More
R.C.C. Work of M-20 grade with 20mm and down grade black hard granite crusher broken chips of 150mm cubes at 28days using minimum quality of cement as per clause 003.5 of IRC – 21 – 1987 and IS – 456 – 1987 with clean crusher broken hard granite chips of 20mm. to 10mm including watering and curing, Centering and Shuttering for R.C.C. Work, Cost, conveyance, tax and royalty of all materials and labour with T&P required for the work etc complete. Column S/S

7

134368

19195.45

... More
Lintel Bend

4.49

71053

15824.75

... More
Chajja

10.8

14516

1344.1

... More
Stair Case

4.25

70898

16681.95

... More
Roof Beam

11.01

184337

16742.75

... More
Roof Slab

28.47

428605

15054.65

... More
Supplying fitting and placing uncoated HYSD Bar reinforcement complete as per drawing and technical specification and placing in proper position as required for R.C.C. Work including cost, conveyance, taxes of Steel and cost of binding wire 18 to 20 gauge and labour with T&P required for the work etc complete in all respect in all floors as per direction of Engineer-in-Charges.

66.78

577990

8655.15

... More
Fly Ash Brick Masonry work in Cement Mortar (1:6) in Superstructure using Fly Ash brick of 9” size having crushing strength not less than 35 Kg per Sq. Cm. including splays cutting, circular molding, chamfering and corbelling, watering and curing etc complete as per direction of Engineer-in-Charges.

67.74

382290

5643.5

... More
6mm (1/4”) thick Cement Plaster in C.M. (1:4) finished smooth to RCC Surface including watering and curing, Scaffolding screening sand etc complete with cost, conveyance, taxes and royalties of all materials and labour with T&P required for the work etc complete in all respect in all floors as per direction of Engineer-in-Charges.

206.53

36979

179.05

... More
12mm thick Cement Plaster in Cement Mortar (1:6) over brick work after raking out joints cleaning & finishing the plaster surface smooth including watering and curing, Scaffolding screening sand etc complete with cost, conveyance, taxes and royalties of all materials and labour with T&P required for the work etc complete in all respect in all floors as per direction of Engineer-in-Charges.

209.28

34730

165.95

... More
16mm thick Cement Plaster in Cement Mortar (1:6) over brick work after raking out joints cleaning & finishing the plaster surface smooth including watering and curing, Scaffolding screening sand etc complete with cost, conveyance, taxes and royalties of all materials and labour with T&P required for the work etc complete in all respect in all floors as per direction of Engineer-in-Charges.

591.63

137553

232.5

... More
Supplying fitting and fixing of vitrified tile in floors of size 600mmx600mm of approved make conforming to IS:13755 laid on 210mm thick Cement Mortar (1:4) (1 Cement : 4 Course Sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of Engineer-in-Charge

189.21

207239

1095.29

... More
Supplying fitting and fixing of vitrified industrial tile in floors of size 600mmx600mm of approved make conforming to IS:13755 laid on 210mm thick Cement Mortar (1:4) (1 Cement : 4 Course Sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of Engineer-in-Charge

17.92

18180

1014.55

... More
Providing & fixing of Floor Tiles in floors treads or steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigments to match the shade including rubbing and polishing as per the design & drawing with cost of all materials, labour, conveyance, taxes , T&P etc. complete as per the direction of Engineering -in-charge.

34.26

41798

1220.05

... More
Supplying, fitting and fixing in position 6.5-6.7mm thick Wall Tiles in dadoes in all floors at all heights and riser of steps with application of 12 mm thick cement mortar of (1:3) in proper slop and filling the gaps with white cement and colouring the surface with silicon paint finished as per the design & drawing with all cost of materials, labour,conveyance, taxes T&P and complete as per the direction of the Engineer-in-charge.

88.18

81275

921.7

... More
Manufacturing and Supplying of M.S. Door, Window, Ventilator and Grill Gate made up all round angular frame size 35x35x5mm, Door and Window angular frame size 25x25x3/5mm with 20 gage C.R. Sheet supporting flat size 25x8mm and 18x5mm including fitting of clamp, hinges, tower bolt, aldrops including all cost, conveyance tax of materials and labour with T&P required for the work etc complete

522

39567

75.8

... More
Labour Charges for fitting and fixing of M.S. Door, Window, Grill Gate and Grills including all cost of Labour with T&P required for the work etc complete.

20.88

8196

392.55

... More
Painting Two Coats (Plastic Enamel Paint) with any approved shade on New Door and windows over a coat of Primer/Red Oxide Paint including all cost, conveyance, tax of materials and labour with T&P required for the work etc complete.

41.76

9498

227.45

... More
Providing & Painting with two coats to the entire outside surface with Weather Coat of any approved make to the outer surface after scraping and cleaning the surface over one coat of Water Bound Wall Primer including all cost of materials, scaffolding, labour, watering & curing T&P etc complete as per direction of Engineer-in-charge.

209.28

14963

71.5

... More
Finishing surface of walls with Cement based Wall Putty (Water Based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, taxes labour T&P required for the work etc. complete

709.98

51260

72.2

... More
Wall painting two coats with plastic emulsion paint of approved shade on new work to give an even shade including cost of paint.

709.98

67696

95.35

... More
Providing & Painting with Priming 1 coat with Water Bound Cement Primer over plaster surface of any approved make to the outer surface after scraping and cleaning the surface including all cost of materials, scaffolding, labour, watering & curing T&P etc complete as per direction of Engineer-in-charge.

709.98

50763

71.5

... More
SECOND FLOOR Cement Concrete in Proportion (1:2:4) foundation and floors using 12mm (1/2”) size Clean hard black crusher broken granite metal of approved quality from approved quarry including hosting lowering and laying in layers not exceeding 15cm (6”) thick to the required level, ramming watering and curing etc complete including all cost, conveyance, taxes and royalties of materials and labour with T&P required for the work etc complete.

1.08

8803

8151.45

... More
R.C.C. Work of M-20 grade with 20mm and down grade black hard granite crusher broken chips of 150mm cubes at 28days using minimum quality of cement as per clause 003.5 of IRC – 21 – 1987 and IS – 456 – 1987 with clean crusher broken hard granite chips of 20mm. to 10mm including watering and curing, Centering and Shuttering for R.C.C. Work, Cost, conveyance, tax and royalty of all materials and labour with T&P required for the work etc complete. Column S/S

5.73

142231

24822.3

... More
Lintel Bend

3.45

68891

19968.5

... More
Chajja

8.1

14193

1752.25

... More
Roof Beam

8.95

168370

18812.3

... More
Roof Slab

26.87

451057

16786.65

... More
Supplying fitting and placing uncoated HYSD Bar reinforcement complete as per drawing and technical specification and placing in proper position as required for R.C.C. Work including cost, conveyance, taxes of Steel and cost of binding wire 18 to 20 gauge and labour with T&P required for the work etc complete in all respect in all floors as per direction of Engineer-in-Charges.

54.29

382160

7039.25

... More
Fly Ash Brick Masonry work in Cement Mortar (1:6) in Superstructure using Fly Ash brick of 9” size having crushing strength not less than 35 Kg per Sq. Cm. including splays cutting, circular molding, chamfering and corbelling, watering and curing etc complete as per direction of Engineer-in-Charges.

58.03

347045

5980.45

... More
6mm (1/4”) thick Cement Plaster in C.M. (1:4) finished smooth to RCC Surface including watering and curing, Scaffolding screening sand etc complete with cost, conveyance, taxes and royalties of all materials and labour with T&P required for the work etc complete in all respect in all floors as per direction of Engineer-in-Charges.

172.19

31588

183.45

... More
12mm thick Cement Plaster in Cement Mortar (1:6) over brick work after raking out joints cleaning & finishing the plaster surface smooth including watering and curing, Scaffolding screening sand etc complete with cost, conveyance, taxes and royalties of all materials and labour with T&P required for the work etc complete in all respect in all floors as per direction of Engineer-in-Charges.

242.07

41708

172.3

... More
16mm thick Cement Plaster in Cement Mortar (1:6) over brick work after raking out joints cleaning & finishing the plaster surface smooth including watering and curing, Scaffolding screening sand etc complete with cost, conveyance, taxes and royalties of all materials and labour with T&P required for the work etc complete in all respect in all floors as per direction of Engineer-in-Charges.

404.32

96268

238.1

... More
Supplying fitting and fixing of vitrified tile in floors of size 600mmx600mm of approved make conforming to IS:13755 laid on 210mm thick Cement Mortar (1:4) (1 Cement : 4 Course Sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of Engineer-in-Charge

108.8

120393

1106.56

... More
Providing & fixing of Floor Tiles in floors treads or steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigments to match the shade including rubbing and polishing as per the design & drawing with cost of all materials, labour, conveyance, taxes , T&P etc. complete as per the direction of Engineering -in-charge.

34.26

42634

1244.45

... More
Supplying, fitting and fixing in position 6.5-6.7mm thick Wall Tiles in dadoes in all floors at all heights and riser of steps with application of 12 mm thick cement mortar of (1:3) in proper slop and filling the gaps with white cement and colouring the surface with silicon paint finished as per the design & drawing with all cost of materials, labour,conveyance, taxes T&P and complete as per the direction of the Engineer-in-charge.

88.18

82765

938.6

... More
Manufacturing and Supplying of M.S. Door, Window, Ventilator and Grill Gate made up all round angular frame size 35x35x5mm, Door and Window angular frame size 25x25x3/5mm with 20 gage C.R. Sheet supporting flat size 25x8mm and 18x5mm including fitting of clamp, hinges, tower bolt, aldrops including all cost, conveyance tax of materials and labour with T&P required for the work etc complete

403.88

30614

75.8

... More
Labour Charges for fitting and fixing of M.S. Door, Window, Grill Gate and Grills including all cost of Labour with T&P required for the work etc complete.

16.15

6529

404.32

... More
Painting Two Coats (Plastic Enamel Paint) with any approved shade on New Door and windows over a coat of Primer/Red Oxide Paint including all cost, conveyance, tax of materials and labour with T&P required for the work etc complete.

32.31

7654

236.9

... More
Providing & Painting with two coats to the entire outside surface with Weather Coat of any approved make to the outer surface after scraping and cleaning the surface over one coat of Water Bound Wall Primer including all cost of materials, scaffolding, labour, watering & curing T&P etc complete as per direction of Engineer-in-charge.

242.07

39517

163.25

... More
Finishing surface of walls with Cement based Wall Putty (Water Based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, taxes labour T&P required for the work etc. complete

488.33

35989

73.7

... More
Wall painting two coats with plastic emulsion paint of approved shade on new work to give an even shade including cost of paint.

488.33

47416

97.1

... More
Providing & Painting with Priming 1 coat with Water Bound Cement Primer over plaster surface of any approved make to the outer surface after scraping and cleaning the surface including all cost of materials, scaffolding, labour, watering & curing T&P etc complete as per direction of Engineer-in-charge.

488.33

36282

74.3



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.