ST And SC Development Minorities And Backward Classes Welfare Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

ST And SC Development Minorities And Backward Classes Welfare Department Tender

Civil And Construction
Building Construction
Eprocure
Opening Date25 Aug 2022
Closing Date8 Sep 2022
Tender Amount₹ 2,69,25,501 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Campus 1 - Drain

141.53

-

215.2

... More
Campus 2 - Road

47.58

-

215.2

... More
Campus 2 - Drain

74.93

-

215.2

... More
Campus 3 - Road

80.4

-

215.2

... More
Campus 3 - Drain

124.88

-

215.2

... More
Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as directed by the Engineer-In-charge.

-

-

-

... More
Campus 1 - Drain

94.82

-

143.47

... More
Campus 1 - Boundary wall

131.51

-

143.47

... More
Campus 2 - Road

31.88

-

143.47

... More
Campus 2 - Drain

50.2

-

143.47

... More
Campus 3 - Road

53.87

-

143.47

... More
Campus 3 - Drain

83.67

-

143.47

... More
Supplying and filling sand in foundation and over areas including watering, ramming, consolidating and dressing, labours, tools, taxes etc. all complete as per the specification and direction of Engineer-In-charge.

-

-

-

... More
Campus 1 - Drain

12.75

-

322.01

... More
Campus 1 - Boundary wall

13.62

-

322.01

... More
Campus 2 - Road

23.79

-

322.01

... More
Campus 2 - Drain

6.75

-

322.01

... More
Campus 3 - Road

40.2

-

322.01

... More
Campus 3 - Drain

11.25

-

322.01

... More
Providing and laying plain cement concrete 1:4:8 (1 cement : 4 sand : 8 stone agregate 40mm nominal size) as levelling course in foundation and plinth etc. including tempering, curring, shuttering etc. complete all depth and height.

-

-

-

... More
Campus 1 - Drain

12.75

-

4433.34

... More
Campus 1 - Boundary wall

10.99

-

4433.34

... More
Campus 2 - Road

23.79

-

4433.34

... More
Campus 2 - Drain

11.24

-

4433.34

... More
Campus 3 - Road

40.2

-

4433.34

... More
Campus 3 - Drain

18.73

-

4433.34

... More
First class Fly ash Brick masonry using bricks of size 25cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per. Sqr. Cm. in cement mortar of mix( 1:6) with ordinary Portland slag cement(PSC) and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Foundation & Plinth including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-In-Charge. at all floors and all heights.

-

-

-

... More
Campus 1 - Boundary wall

31.85

-

4141.28

... More
First class Fly ash Brick masonry using bricks of size 25cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per. Sqr. Cm. in cement mortar of mix( 1:6) with ordinary Portland slag cement(PSC) and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Super stracture including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-In-Charge. at all floors and all heights.

-

-

-

... More
Ground Floor

-

-

-

... More
Campus 1 - Hostel no 2

8.25

-

4179.61

... More
Campus 1 - Store

2.1

-

4179.61

... More
Campus 1 - Bath complex

2.03

-

4179.61

... More
Campus 1 - Hostel no 1

11.12

-

4179.61

... More
Campus 1 - Boundary wall

57.66

-

4179.61

... More
Campus 2 - Existing office building

8.25

-

4179.61

... More
Campus 2 - Existing office building

6.6

-

4179.61

... More
Campus 2 - Existing Class room building

6.6

-

4179.61

... More
Campus 2 - Existing Class room building

5.14

-

4179.61

... More
Campus 2 - Toilet block

2.03

-

4179.61

... More
Campus 3 - Boys Hostel

5.56

-

4179.61

... More
First Floor

-

-

-

... More
Campus 1 - Hostel no 2

13.3

-

4452.9

... More
Campus 1 - Hostel no 1

11.41

-

4452.9

... More
Campus 2 - Existing Class room building

3.56

-

4452.9

... More
Campus 3 - Boys Hostel

5.09

-

4452.9

... More
2nd Floor

-

-

-

... More
Campus 1 - Hostel no 2

15.52

-

4767.1

... More
Campus 1 - Hostel no 1

12.15

-

4767.1

... More
Campus 1 - Quarter

6.75

-

4767.1

... More
Campus 2 - Existing Class room building

6.32

-

4767.1

... More
Campus 3 - Boys Hostel

4.5

-

4767.1

... More
First class Fly ash Brick masonry using bricks of size 25cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per. Sqr. Cm. in cement mortar of mix( 1:4) with ordinary Portland slag cement(PSC) and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Super structure including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-In-Charge.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 2 - Existing Class room building

1.92

-

4390.1

... More
Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 25 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position.

-

-

-

... More
a) Footings

-

-

-

... More
Campus 1 - Drain

20.61

-

5509.81

... More
Campus 1 - Boundary wall

14.13

-

5509.81

... More
Campus 2 - Road

5.35

-

5509.81

... More
Campus 2 - Drain

10.91

-

5509.81

... More
Campus 3 - Road

9.05

-

5509.81

... More
Campus 3 - Drain

18.19

-

5509.81

... More
b) Grade Beam/Tie beam

-

-

-

... More
Campus 1 - Boundary wall

8.73

-

5874.07

... More
c) Column

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Boundary wall

22.62

-

11330.57

... More
Campus 2 - Boundary wall

19.75

-

11330.57

... More
d) Lintel

-

-

-

... More
Ground floor

-

-

-

... More
Campus 2 - Boundary wall

7.76

-

9081.21

... More
Campus 2 - Existing Class room building

0.4

-

9081.21

... More
e) Chajja / Platform slab

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Hostel no 2

1.35

-

5833.41

... More
Campus 1 - Bath complex

2.54

-

5833.41

... More
Campus 1 - Hostel no 1

2.28

-

5833.41

... More
Campus 1 - Quarter

1.56

-

5833.41

... More
Campus 2 - Existing Class room

0.14

-

5833.41

... More
Campus 3 - Boys Hostel

2.28

-

5833.41

... More
First floor

-

-

-

... More
Campus 1 - Hostel no 2

2.25

-

6016.35

... More
Campus 1 - Hostel no 1

1.88

-

6016.35

... More
Campus 1 - Quarter

1.56

-

6016.35

... More
Campus 3 - Boys Hostel

1.88

-

6016.35

... More
2nd floor

-

-

-

... More
Campus 1 - Hostel no 1

0.1

-

6231.54

... More
Campus 3 - Boys Hostel

0.1

-

6231.54

... More
f) Roof Beam

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Boundary wall

6.22

-

11330.57

... More
g) Roof slab

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Boundary wall

7.07

-

9690.8

... More
Campus 2 - Existing Office Building

1.82

-

9690.8

... More
Campus 2 - Existing Office Building

1.95

-

9690.8

... More
Campus 2 - Existing Classroom Building

2.16

-

9690.8

... More
Campus 2 - Existing Classroom Building

0.99

-

9690.8

... More
First floor

-

-

-

... More
Campus 2 - Existing Classroom Building

0.99

-

10652.93

... More
2nd floor

-

-

-

... More
Campus 2 - Existing Classroom Building

0.63

-

11803.15

... More
i) RCC wall

-

-

-

... More
Campus 1 - Drain

24.65

-

11330.57

... More
Campus 2 - Drain

13.05

-

11330.57

... More
Campus 3 - Drain

21.75

-

11330.57

... More
Supplying, straightening, cutting, bending, placing in position and binding reinforcement steel work in RCC/reinforced brick works as per drawing and specification including preparation of respective bar bending schedule and binding (Binding wire to be used as per the IS code) etc. all complete as per direction of Engineer-In-charge. Cold Twisted bars, Thermo-Mechanically-treated bars.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Drain

54.43

-

10509.61

... More
Campus 1 - Hostel no 2

4.58

-

10509.61

... More
Campus 1 - Bath complex

5.36

-

10509.61

... More
Campus 1 - Hostel no 1

4.82

-

10509.61

... More
Campus 1 - Staff Quarter

4.09

-

10509.61

... More
Campus 1 - Boundary wall

84.56

-

10509.61

... More
Campus 2 - Drain

30.23

-

10509.61

... More
Campus 2 - Boundary wall

51.41

-

10509.61

... More
Campus 2 - Existing Office building

4.28

-

10509.61

... More
Campus 2 - Existing Office building

4.37

-

10509.61

... More
Campus 2 - Existing Classroom

4.51

-

10509.61

... More
Campus 2 - Existing Classroom

4.16

-

10509.61

... More
Campus 2 - Existing Toilet block

5.36

-

10509.61

... More
Campus 3 - Drain

48.38

-

10509.61

... More
Campus 3 - Boys Hostel

4.59

-

10509.61

... More
First floor

-

-

-

... More
Campus 1 - Hostel no 2

4.58

-

10533.99

... More
Campus 1 - Hostel no 1

6.47

-

10533.99

... More
Campus 1 - Staff Quarter

4.09

-

10533.99

... More
Campus 2 - Existing Classroom

3.69

-

10533.99

... More
Campus 3 - Boys Hostel

4.32

-

10533.99

... More
2nd Floor

-

-

-

... More
Campus 1 - Hostel no 1

3.08

-

10559.58

... More
Campus 2 - Existing Classroom

3.44

-

10559.58

... More
Campus 3 - Boys Hostel

3.07

-

10559.58

... More
12mm cement plaster on external RCC/brick surfaces in cement plaster 1:6 (1 cement : 6 coarse sand) including necessary scaffolding, curing etc. all complete at all floors and all heights.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Dining

56.51

-

141.11

... More
Campus 1 - Hostel no 2

289.77

-

141.11

... More
Campus 1 - Store

25.91

-

141.11

... More
Campus 1 - Bath complex

148.82

-

141.11

... More
Campus 1 - Hostel no 1

269.96

-

141.11

... More
Campus 1 - Quarter

64.68

-

141.11

... More
Campus 2 - Existing Office Building

37.47

-

141.11

... More
Campus 2 - Existing Office Building

85.09

-

141.11

... More
Campus 2 - Existing Classroom

318.61

-

141.11

... More
Campus 2 - Existing Classroom

166.11

-

141.11

... More
Campus 2 - Existing Toilet Block

72.61

-

141.11

... More
Campus 3 - Boys Hostel

120.61

-

141.11

... More
First floor

-

-

-

... More
Campus 1 - Hostel no 2

278.87

-

146.76

... More
Campus 1 - Hostel no 1

269.18

-

146.76

... More
Campus 1 - Quarter

64.68

-

146.76

... More
Campus 2 - Existing Classroom

120.19

-

146.76

... More
Campus 3 - Boys Hostel

107.5

-

146.76

... More
2nd Floor

-

-

-

... More
Campus 1 - Hostel no 2

135.68

-

152.7

... More
Campus 1 - Hostel no 1

125.37

-

152.7

... More
Campus 1 - Quarter

31.13

-

152.7

... More
Campus 2 - Existing Classroom

77.61

-

152.7

... More
Campus 3 - Boys Hostel

56.73

-

152.7

... More
16mm cement plaster on internal smooth side of RCC/brick surfaces with cement mortar of mix 1:6 (1 cement : 6 fine sand) including necessary scaffolding, curing etc. all complete at all floors and all heights.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Dining

53.94

-

201.84

... More
Campus 1 - Hostel no 2

699.46

-

201.84

... More
Campus 1 - Store

23.3

-

201.84

... More
Campus 1 - Bath complex

188.8

-

201.84

... More
Campus 1 - Hostel no 1

922.13

-

201.84

... More
Campus 1 - Quarter

136.45

-

201.84

... More
Campus 1 - Boundary wall

587.9

-

201.84

... More
Campus 2 - Boundary wall

301.46

-

201.84

... More
Campus 2 - Existing office building

68.64

-

201.84

... More
Campus 2 - Existing office building

86.23

-

201.84

... More
Campus 2 - Existing classroom

324.38

-

201.84

... More
Campus 2 - Existing classroom

243.82

-

201.84

... More
Campus 2 - Toilet block

92.6

-

201.84

... More
Campus 3 - Boys Hostel

343.3

-

201.84

... More
First floor

-

-

-

... More
Campus 1 - Hostel no 2

643.5

-

206.88

... More
Campus 1 - Hostel no 1

806.42

-

206.88

... More
Campus 1 - Quarter

136.45

-

206.88

... More
Campus 2 - Existing classroom

251.49

-

206.88

... More
Campus 3 - Boys Hostel

311.27

-

206.88

... More
2nd Floor

-

-

-

... More
Campus 1 - Hostel no 2

155.99

-

212.08

... More
Campus 1 - Hostel no 1

103.39

-

212.08

... More
Campus 1 - Quarter

31.58

-

212.08

... More
Campus 2 - Existing classroom

84.8

-

212.08

... More
Campus 3 - Boys Hostel

56.73

-

212.08

... More
6 mm cement plaster on RCC surfaces at ceiling/slab soffit and other locations with cement mortar of mix 1:4 (1 cement : 4 fine sand) including necessary scaffolding, curing etc. all complete at all floors and all heights.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Drain

206.13

-

158.43

... More
Campus 1 - Dining

50.68

-

158.43

... More
Campus 1 - Hostel no 2

297.84

-

158.43

... More
Campus 1 - Store

13.5

-

158.43

... More
Campus 1 - Bath complex

49.83

-

158.43

... More
Campus 1 - Hostel no 1

288.19

-

158.43

... More
Campus 1 - Quarter

51

-

158.43

... More
Campus 1 - Boundary wall

13.5

-

158.43

... More
Campus 2 - Drain

109.13

-

158.43

... More
Campus 2 - Boundary wall

13.5

-

158.43

... More
Campus 2 - Existing Office building

28.22

-

158.43

... More
Campus 2 - Existing Office building

74.28

-

158.43

... More
Campus 2 - Existing Classroom building

98.64

-

158.43

... More
Campus 2 - Toilet block

22.69

-

158.43

... More
Campus 3 - Drain

181.88

-

158.43

... More
Campus 3 - Boys Hostel

163

-

158.43

... More
First floor

-

-

-

... More
Campus 1 - Hostel no 2

237.76

-

162.39

... More
Campus 1 - Hostel no 1

255.36

-

162.39

... More
Campus 1 - Quarter

51

-

162.39

... More
Campus 2 - Existing Classroom building

106.1

-

162.39

... More
Campus 3 - Boys Hostel

136.98

-

162.39

... More
2nd Floor

-

-

-

... More
Campus 1 - Hostel no 2

25

-

166.47

... More
Campus 1 - Hostel no 1

21.95

-

166.47

... More
Campus 1 - Quarter

4.5

-

166.47

... More
Campus 2 - Existing Classroom building

17.5

-

166.47

... More
Campus 3 - Boys Hostel

10.4

-

166.47

... More
Cement punning on plastered surface

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Drain

178.5

-

32.48

... More
Campus 2 - Drain

94.5

-

32.48

... More
Campus 3 - Drain

157.5

-

32.48

... More
Providing, fitting and fixing Matt Finish Vitrified tile in floor of size 300x300 mm of approved make conforming to IS: 13755 laid on 20 mm thick cement mortar 1:4 (1 cement: 4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc required for the work all complete as per direction of Engineer-In-Charge

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Hostel no 2

120.83

-

853.45

... More
Campus 1 - Bath complex

22.25

-

853.45

... More
Campus 1 - Hostel no 1

27.81

-

853.45

... More
Campus 2 - Existing Office building

17.6

-

853.45

... More
First floor

-

-

-

... More
Campus 2 - Hostel no 2

91.04

-

863.51

... More
Campus 2 - Hostel no 1

27.81

-

863.51

... More
Providing and laying Vitrified floor tiles 600x600 mm (thickness to be specified by the manufacturer) 1st quality of NITCO, SOMANY, ASIAN, KAJARIA or equivalent approved make, colours & shades laid on 20 mm thick cement mortar 1:4 (1cement: 4coarse sand ) including pointing the joints with white cement and matching pigments, etc. complete as per direction of Engineer-In-Charge at all floors and all heights.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 2 - Existing classroom

121.08

-

1273.52

... More
Campus 2 - Toilet block

8.22

-

1273.52

... More
First floor

-

-

-

... More
Campus 2 - Existing classroom

124.99

-

1283.58

... More
2nd floor

-

-

-

... More
Campus 2 - Existing classroom

8.63

-

1294.14

... More
Providing and fixing 16mm thick Kota stone flooring (sample of kota stone should be approved by EIC) where ever required in horizontal/vertical surfaces of required size of approved shade, colour and texture, with moulding edge etc. laid over 20mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand) with joints treated with white cement mixed with matching pigment, epoxy touch ups including rubbing, curing, moulding and polishing complete as per direction of Engineer-in-charge. In all floors and all heights.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Dining

52.67

-

781.8

... More
Campus 1 - Store

13.5

-

781.8

... More
Campus 1 - Hostel no 1

62.18

-

781.8

... More
Campus 2 - Existing Office building

8.34

-

781.8

... More
Campus 2 - Existing Office building

76.43

-

781.8

... More
Campus 2 - Existing Classroom building

87.56

-

781.8

... More
Campus 3 - Boys Hostel

12.54

-

781.8

... More
First floor

-

-

-

... More
Campus 1 - Hostel no 1

51.75

-

791.8

... More
Campus 3 - Boys Hostel

3.35

-

791.8

... More
Providing and laying Ceramic Glazed wall tiles of size 20cmx30cm / 20cm x 20cm (thickness to be specified by the manufacturer) for skirting/Dado 1st quality conforming to IS: 15622 of NITCO, SOMANY, ASIAN, KAJARIA or equivalent approved make, colours & shades, except white, ivory, grey, fume red brown, laid on 12 mm thick cement mortar 1:3 (1cement: 3coarse sand ) including pointing the joints with white cement and matching pigments, etc. complete as per direction of EIC at all floors and all heights.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Bath complex

57.65

-

780.71

... More
Campus 2 - Existing classroom building

59.92

-

780.71

... More
Campus 2 - Toilet block

22.05

-

780.71

... More
Providing and laying Matte Finish Vitrified wall tiles 600x600 mm (thickness to be specified by the manufacturer) 1st quality conforming to IS: 15622 of NITCO, SOMANY, ASIAN, KAJARIA or equivalent approved make, colours & shades, except white, ivory, grey, fume red brown, laid on 12 mm thick cement mortar 1:3 (1cement:3coarse sand) including pointing the joints with white cement and matching pigments, etc. complete as per direction of Engineer-In-Charge at all floors and all heights.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Hostel no 2

62.56

-

1320.94

... More
Campus 1 - Hostel no 1

102.63

-

1320.94

... More
Campus 2 - Existing office building

1.96

-

1320.94

... More
Campus 2 - Existing classroom

12.68

-

1320.94

... More
Campus 3 - Boys Hostel

33.43

-

1320.94

... More
First floor

-

-

-

... More
Campus 1 - Hostel no 2

60.52

-

1336.08

... More
Campus 1 - Hostel no 1

102.63

-

1336.08

... More
Campus 2 - Existing classroom

12.32

-

1336.08

... More
Campus 3 - Boys Hostel

33.43

-

1336.08

... More
2nd floor

-

-

-

... More
Campus 2 - Existing classroom

3.15

-

1351.98

... More
Providing and fixing 16mm thick Kota stone Dado/skirting (sample of kota stone should be approved by EIC) where ever required in horizontal/vertical surfaces of required size of approved shade, colour and texture, with moulding edge etc. laid over 12mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand) with joints treated with white cement mixed with matching pigment, epoxy touch ups including rubbing, curing, moulding and polishing complete as per direction of Engineer-in-charge. In all floors and all heights.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Store

4.02

-

864.21

... More
Campus 1 - Hostel no 1

5.2

-

864.21

... More
Campus 2 - Existing office building

1.32

-

864.21

... More
Campus 2 - Existing office building

8.2

-

864.21

... More
Campus 2 - Existing classroom building

9.82

-

864.21

... More
Campus 3 - Boys Hostel

3.98

-

864.21

... More
First floor

-

-

-

... More
Campus 1 - Hostel no 1

4.21

-

879.35

... More
Providing and fixing 20mm thick Granite stone flooring (sample of Granite stone should be approved by EIC) for stair case trade, riser and similar locations where ever required in horizontal/vertical surfaces of required size of approved shade, colour and texture, with moulding edge etc. laid over 20mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand) with joints treated with white cement mixed with matching pigment, epoxy touch ups including rubbing, curing, moulding and polishing to give high gloss finish and groove in staircase where required etc. complete as per direction of Engineer-in-charge. In all floors and all heights.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Boundary wall

15

-

2058.2

... More
Campus 2 - Existing Classroom

48.61

-

2058.2

... More
Campus 2 - Boundary wall

15

-

2058.2

... More
Provision for polishing of existing Kota stone flooring

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Hostel no 1

145.08

-

110

... More
Campus 3 - Boys Hostel

50.17

-

110

... More
First floor

-

-

-

... More
Campus 1 - Hostel no 1

120.74

-

110

... More
Campus 3 - Boys Hostel

13.4

-

110

... More
Providing and laying 10/12 mm thick precast Kodappa tiles on entrance Gate over 25 mm thick bed of cement mortar 1:1 complete as per drawing, direction of Engineer-In-Charge and technical specification instruction of Engineer-In-Charge at all elevations including all material labour complete.

-

-

-

... More
Campus 1 - Boundary wall

6.59

-

701.1

... More
Campus 2 - Boundary wall

6.59

-

701.1

... More
Providing and fixing M.S grill/window/door of required patterns for windows/verandahs etc. with M.S flats, square or round bars etc. including applying a coat of approved steel primer and two or more coats of synthetic enamel paint of approved make & shade, all complete as per drawing & specification. (All steel sections contractor's own supply).

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Dining

554.4

-

140.78

... More
Campus 1 - Hostel no 2

1003.02

-

140.78

... More
Campus 1 - Store

260.55

-

140.78

... More
Campus 1 - Bath complex

28.8

-

140.78

... More
Campus 1 - Hostel no 1

596.03

-

140.78

... More
Campus 1 - Quarter

269.55

-

140.78

... More
Campus 1 - Boundary wall

777.6

-

140.78

... More
Campus 2 - Boundary wall

604.8

-

140.78

... More
Campus 2 - Existing office Building

218.91

-

140.78

... More
Campus 2 - Existing office Building

247.7

-

140.78

... More
Campus 2 - Existing Classroom Building

1085.18

-

140.78

... More
Campus 2 - Existing Classroom Building

315.23

-

140.78

... More
Campus 2 - Toilet block

14.4

-

140.78

... More
Campus 3 - Boys Hostel

874.29

-

140.78

... More
First floor

-

-

-

... More
Campus 1 - Hostel no 2

876.4

-

140.78

... More
Campus 1 - Hostel no 1

526.5

-

140.78

... More
Campus 1 - Quarter

269.55

-

140.78

... More
Campus 2 - Existing Classroom Building

805.44

-

140.78

... More
Campus 3 - Boys Hostel

775.28

-

140.78

... More
2nd Floor

-

-

-

... More
Campus 1 - Hostel no 2

184.42

-

140.78

... More
Campus 1 - Hostel no 1

152.95

-

140.78

... More
Campus 1 - Quarter

137.2

-

140.78

... More
Campus 2 - Existing Classroom Building

47.25

-

140.78

... More
Campus 3 - Boys Hostel

126.04

-

140.78

... More
Providing & Painting with synthetic enamel paint of approved brand and manufacture to give an even shade as per the instruction of Engineer-In-Charge at all floors and all heights including all material & labour complete.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Dining

191.99

-

92.46

... More
Campus 1 - Hostel no 2

135.85

-

92.46

... More
Campus 1 - Store

26.33

-

92.46

... More
Campus 1 - Bath complex

2.16

-

92.46

... More
Campus 1 - Hostel no 1

109.73

-

92.46

... More
Campus 1 - Quarter

26.08

-

92.46

... More
Campus 1 - Boundary wall

17.28

-

92.46

... More
Campus 2 - Road

35.69

-

92.46

... More
Campus 2 - Boundary wall

17.28

-

92.46

... More
Campus 2 - Existing office Building

27.36

-

92.46

... More
Campus 2 - Existing office Building

25.74

-

92.46

... More
Campus 2 - Existing Classroom Building

46.58

-

92.46

... More
Campus 2 - Existing Classroom Building

39.04

-

92.46

... More
Campus 2 - Toilet block

1.44

-

92.46

... More
Campus 3 - Road

60.3

-

92.46

... More
Campus 3 - Boys Hostel

279.98

-

92.46

... More
First floor

-

-

-

... More
Campus 1 - Hostel no 2

116.79

-

94.08

... More
Campus 1 - Hostel no 1

99.41

-

94.08

... More
Campus 1 - Quarter

26.08

-

94.08

... More
Campus 2 - Existing Classroom Building

61.55

-

94.08

... More
Campus 3 - Boys Hostel

180.18

-

94.08

... More
2nd Floor

-

-

-

... More
Campus 1 - Hostel no 2

12.15

-

95.76

... More
Campus 1 - Hostel no 1

10.26

-

95.76

... More
Campus 1 - Quarter

5.54

-

95.76

... More
Campus 2 - Existing Classroom Building

6.08

-

95.76

... More
Campus 3 - Boys Hostel

9.18

-

95.76

... More
Providing & Applying priming coat with Cement primer of approved brand and manufacture on plaster surface as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Dining

536.46

-

60.11

... More
Campus 1 - Hostel no 2

1287.06

-

60.11

... More
Campus 1 - Store

62.7

-

60.11

... More
Campus 1 - Bath complex

387.45

-

60.11

... More
Campus 1 - Hostel no 1

1480.28

-

60.11

... More
Campus 1 - Quarter

840.43

-

60.11

... More
Campus 1 - Boundary wall

601.4

-

60.11

... More
Campus 2 - Boundary wall

314.96

-

60.11

... More
Campus 2 - Existing office building

447.79

-

60.11

... More
Campus 2 - Existing office building

350.85

-

60.11

... More
Campus 2 - Existing Classroom building

642.98

-

60.11

... More
Campus 2 - Existing Classroom building

508.57

-

60.11

... More
Campus 2 - Toilet block

353.11

-

60.11

... More
Campus 3 - Boys Hostel

2089.71

-

60.11

... More
First floor

-

-

-

... More
Campus 1 - Hostel no 2

1160.13

-

61.61

... More
Campus 1 - Hostel no 1

1330.96

-

61.61

... More
Campus 1 - Quarter

840.43

-

61.61

... More
Campus 2 - Existing Classroom building

477.78

-

61.61

... More
Campus 3 - Boys Hostel

1852.46

-

61.61

... More
2nd Floor

-

-

-

... More
Campus 1 - Hostel no 2

316.68

-

63.16

... More
Campus 1 - Hostel no 1

250.7

-

63.16

... More
Campus 1 - Quarter

224.02

-

63.16

... More
Campus 2 - Existing Classroom building

179.91

-

63.16

... More
Campus 3 - Boys Hostel

412.83

-

63.16

... More
Providing and applying to outside walls with two or more coats of Anti-Fungal Weather coat (English ELMS 2387) water proofing paint including scaffolding and cleaning the surface before application of approved colour and manufacture as per specification, instruction of Engineer-In-Charge at all elevations including all material labour complete.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Dining

187.71

-

94.89

... More
Campus 1 - Hostel no 2

289.77

-

94.89

... More
Campus 1 - Store

25.91

-

94.89

... More
Campus 1 - Bath complex

148.82

-

94.89

... More
Campus 1 - Hostel no 1

269.96

-

94.89

... More
Campus 1 - Quarter

215.62

-

94.89

... More
Campus 1 - Boundary wall

601.4

-

94.89

... More
Campus 2 - Boundary wall

314.96

-

94.89

... More
Campus 2 - Existing office building

124.91

-

94.89

... More
Campus 2 - Existing office building

121.56

-

94.89

... More
Campus 2 - Existing Classroom building

318.61

-

94.89

... More
Campus 2 - Existing Classroom building

166.11

-

94.89

... More
Campus 2 - Toilet block

145.22

-

94.89

... More
Campus 3 - Boys Hostel

402.04

-

94.89

... More
First floor

-

-

-

... More
Campus 1 - Hostel no 2

278.87

-

96.1

... More
Campus 1 - Hostel no 1

269.18

-

96.1

... More
Campus 1 - Quarter

215.62

-

96.1

... More
Campus 2 - Existing Classroom building

120.19

-

96.1

... More
Campus 3 - Boys Hostel

358.32

-

96.1

... More
2nd Floor

-

-

-

... More
Campus 1 - Hostel no 2

135.68

-

97.38

... More
Campus 1 - Hostel no 1

125.37

-

97.38

... More
Campus 1 - Quarter

103.76

-

97.38

... More
Campus 2 - Existing Classroom building

77.61

-

97.38

... More
Campus 3 - Boys Hostel

189.08

-

97.38

... More
Providing and applying white cement based putty of average thickness 1 mm of approved brand and manufacturer, over the plastered wall surfaces to prepare the surface even and smooth as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Dining

536.46

-

86.78

... More
Campus 1 - Hostel no 2

1287.06

-

86.78

... More
Campus 1 - Store

62.7

-

86.78

... More
Campus 1 - Bath complex

387.45

-

86.78

... More
Campus 1 - Hostel no 1

1480.28

-

86.78

... More
Campus 1 - Quarter

840.43

-

86.78

... More
Campus 1 - Boundary wall

13.5

-

86.78

... More
Campus 2 - Boundary wall

13.5

-

86.78

... More
Campus 2 - Existing office building

447.79

-

86.78

... More
Campus 2 - Existing office building

350.85

-

86.78

... More
Campus 2 - Existing Classroom building

642.98

-

86.78

... More
Campus 2 - Existing Classroom building

508.57

-

86.78

... More
Campus 2 - Toilet block

353.11

-

86.78

... More
Campus 3 - Boys Hostel

2089.71

-

86.78

... More
First floor

-

-

-

... More
Campus 1 - Hostel no 2

1160.13

-

88.15

... More
Campus 1 - Hostel no 1

1330.96

-

88.15

... More
Campus 1 - Quarter

840.43

-

88.15

... More
Campus 2 - Existing Classroom building

477.78

-

88.15

... More
Campus 3 - Boys Hostel

1852.46

-

88.15

... More
2nd Floor

-

-

-

... More
Campus 1 - Hostel no 2

316.68

-

89.57

... More
Campus 1 - Hostel no 1

250.7

-

89.57

... More
Campus 1 - Quarter

224.02

-

89.57

... More
Campus 2 - Existing Classroom building

179.91

-

89.57

... More
Campus 3 - Boys Hostel

412.83

-

89.57

... More
Providing & painting two coats of Plastic emulsion paint with 1st quality of approved brand and manufacturer to give an even shade as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Dining

348.75

-

78.8

... More
Campus 1 - Hostel no 2

997.29

-

78.8

... More
Campus 1 - Store

36.8

-

78.8

... More
Campus 1 - Bath complex

238.63

-

78.8

... More
Campus 1 - Hostel no 1

1210.32

-

78.8

... More
Campus 1 - Quarter

624.82

-

78.8

... More
Campus 2 - Existing office building

322.88

-

78.8

... More
Campus 2 - Existing office building

229.29

-

78.8

... More
Campus 2 - Existing classroom building

324.38

-

78.8

... More
Campus 2 - Existing classroom building

342.46

-

78.8

... More
Campus 2 - Toilet block

207.89

-

78.8

... More
Campus 3 - Boys Hostel

1687.66

-

78.8

... More
First floor

-

-

-

... More
Campus 1 - Hostel no 2

881.26

-

80.4

... More
Campus 1 - Hostel no 1

1061.78

-

80.4

... More
Campus 1 - Quarter

624.82

-

80.4

... More
Campus 2 - Existing classroom building

357.59

-

80.4

... More
Campus 3 - Boys Hostel

1494.14

-

80.4

... More
2nd Floor

-

-

-

... More
Campus 1 - Hostel no 2

180.99

-

82.07

... More
Campus 1 - Hostel no 1

125.34

-

82.07

... More
Campus 1 - Quarter

120.26

-

82.07

... More
Campus 2 - Existing classroom building

102.3

-

82.07

... More
Campus 3 - Boys Hostel

223.75

-

82.07

... More
Providing, fitting and fixing of Upvc sliding window .

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Hostel no 2

44.15

-

7040.3

... More
Campus 1 - Hostel no 1

37.67

-

7040.3

... More
Providing, fitting and fixing of Upvc top hung (openable) Ventilator .

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Hostel no 2

2.16

-

7040.3

... More
Campus 1 - Bath complex

2.88

-

7040.3

... More
Campus 1 - Hostel no 1

1.44

-

7040.3

... More
Campus 2 - Toilet block

1.44

-

7040.3

... More
Providing fitting fixing of Alluminium door for lavatory including all cost of labour, T&P , hire charges of drilling machine, labour charges etc. complete

-

-

-

... More
Campus 1 - Hostel no 2

19.53

-

5496.4

... More
Campus 1 - Bath complex

5.04

-

5496.4

... More
Campus 1 - Hostel no 1

25.2

-

5496.4

... More
Campus 2 - Existing classroom

6.3

-

5496.4

... More
Campus 2 - Toilet block

6.3

-

5496.4

... More
Supplying, fitting and fixing of Stainless steel of 304 grade in hand ralling using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm X 32mm X 2mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm X 32mm X 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes, all materials, labour, T&P etc. required for the complete in all respect.

-

-

-

... More
Campus 3 - Boys Hostel

52.39

-

334.9

... More
Campus 1 - Hostel no 1

178.13

-

334.9

... More
4 cm thick grading concrete (1:2:4) on roof slab with 12mm & down grade size black hard granite chips for old work.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 1 - Dining

183

-

628.07

... More
Campus 1 - Hostel no 2

52.44

-

628.07

... More
Campus 1 - Store

45

-

628.07

... More
Campus 1 - Bath complex

42

-

628.07

... More
Campus 1 - Hostel no 1

36.5

-

628.07

... More
Campus 2 - Existing office building

104.33

-

628.07

... More
Existing office building

91.46

-

628.07

... More
Toilet block

21

-

628.07

... More
First floor

-

-

-

... More
Campus 1 - Hostel no 2

201

-

699.01

... More
Campus 1 - Hostel no 1

220

-

699.01

... More
Campus 1 - Quarter

15

-

699.01

... More
Campus 2 - Existing classroom

134.28

-

699.01

... More
2nd floor

-

-

-

... More
Campus 1 - Hostel no 2

25

-

780.58

... More
Campus 1 - Hostel no 1

19

-

780.58

... More
Campus 1 - Quarter

20

-

780.58

... More
Campus 2 - Existing classroom

22.21

-

780.58

... More
Providing and laying grading conc. 25 mm (avg. thickness) cement concrete of required slope of mix 1:2:2 (1cement:2sand:2 graded stone aggregate of 10 mm nominal size) mixed as per manufacturer's specification on top of slab including cement slurry, all complete, including the cost of water proofing admixture, which should be approved by the Engineer-In-Charge prior to material procurement by the contractor.

-

-

-

... More
Ground floor

-

-

-

... More
Campus 3 - Boys Hostel

12.81

-

302.34

... More
First floor

-

-

-

... More
Campus 3 - Boys Hostel

393.5

-

331.08

... More
2nd Floor

-

-

-

... More
Campus 3 - Boys Hostel

31.5

-

364.13

... More
Waterproofing Treatment :- Toilet/Floor & Wall

-

-

-

... More
Providing waterproofing for Toilet/SukenSlab:- Cleaning the inside surface & & Application of two coats of sika Top seal 109 hi @ 2.2 Kg/Sqm & Sika Fab-1 to the battom slab & side wall surface to protect against leakage & seepage finally covered with a cement mortar (1:4). Proper care should be taken to fill the pipe penetration points with sikagard 694 fi (moisture resistant epoxy putty) complete as per manufacture specification and direction of Engineer-In-Charge.

-

-

-

... More
Campus 1 - Hostel no 2

287.5

-

650

... More
Campus 1 - Bath complex

54.6

-

650

... More
Campus 1 - Hostel no 1

286.16

-

650

... More
Campus 1 - Quarter

346.39

-

650

... More
Campus 2 - Existing classroom building

74.41

-

650

... More
Campus 2 - Toilet block

25.2

-

650

... More
Campus 3 - Boys Hostel

424.02

-

650

... More
Terrace water proofing

-

-

-

... More
Campus 1 - Dining

183

-

600

... More
Campus 1 - Hostel no 2

278.44

-

600

... More
Campus 1 - Bath complex

42

-

600

... More
Campus 1 - Hostel no 1

247.5

-

600

... More
Campus 1 - Quarter

35

-

600

... More
Campus 2 - Existing office building

104.33

-

600

... More
Campus 2 - Existing office building

112.55

-

600

... More
Campus 2 - Existing Classroom building

156.49

-

600

... More
Campus 2 - Toilet block

21

-

600

... More
Campus 3 - Boys Hostel

437.81

-

600

... More
Dismantling and removing old tiled flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris within 50m lead

-

-

-

... More
Campus 1 - Dining

52.67

-

97.59

... More
Campus 1 - Hostel no 2

211.87

-

97.59

... More
Campus 1 - Bath complex

22.25

-

97.59

... More
Campus 1 - Hostel no 1

55.62

-

97.59

... More
Campus 2 - Existing office building

25.95

-

97.59

... More
Campus 2 - Existing office building

83.24

-

97.59

... More
Campus 2 - Existing classroom building

87.56

-

97.59

... More
Campus 2 - Toilet block

4.32

-

97.59

... More
Campus 3 - Boys Hostel

146.09

-

97.59

... More
Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead

-

-

-

... More
Campus 1 - Hostel no 2

2.81

-

1137.29

... More
Campus 1 - Hostel no 1

21.43

-

1137.29

... More
Campus 1 - Quarter

2.31

-

1137.29

... More
Campus 3 - Boys Hostel

2.31

-

1137.29

... More
Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris within 50m

-

-

-

... More
Campus 1 - Hostel no 2

70.25

-

325.94

... More
Campus 1 - Bath complex

17.64

-

325.94

... More
Campus 1 - Hostel no 1

22.68

-

325.94

... More
Campus 2 - Toilet block

7.74

-

325.94

... More
Campus 2 - Existing office building

9.87

-

325.94

... More
Campus 2 - Existing office building

7.08

-

325.94

... More
Campus 2 - Existing Classroom building

15.5

-

325.94

... More
Campus 3 - Boys Hostel

32.88

-

325.94

... More
Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead

-

-

-

... More
Campus 1 - Dining

101.18

-

40.72

... More
Campus 2 - Existing office building

134.34

-

40.72

... More
Campus 2 - Existing office building

245.59

-

40.72

... More
Campus 2 - Existing classroom building

642.98

-

40.72

... More
Providing, fitting and fixing Chequerred tile in floor of approved size mm of approved make conforming to IS: 13755 laid on 20 mm thick cement mortar 1:4 (1 cement: 4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc required for the work all complete as per direction of Engineer-In-Charge

-

-

-

... More
Campus 2 - Road

200

-

568.6

... More
Providing and laying approved colour 60 mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with storng vibratory compaction of approved size, design & shape, laid in required colour and pattern over and including 75mm thick sand filling.as per drawing, specification and direction of Engineer-In-charge.

-

-

-

... More
Campus 3 - Road

268

-

978.2

... More
Campus 2 - Road

158.6

-

978.2

... More
INTERNAL & EXTERNAL SANITARY WORKS

-

-

-

... More
WATER SUPPLY.

-

-

-

... More
Supplying, installing, fixing, jointing, testing and commissioning of approved make. Chlorinated Polyvinyl Chloride pipes (CPVC) SDR.11 pipes confirming to ASTM standards with necessary fittings for inetrnal toilet water supply upto 50 dia , and above 50mm dia pipe schedule 40 with fitting shall be schedule 80 ASTM IPS. The fittings and specials such as tees, elbows, couplers, bends, enlargers etc.,m with CPVC brass threaded combination / transition specials such as male adapters brass threaded female adapters, brass FPT Tee, Brass FPT elbow etc., where connection with metal is to be made including necessary drilling holes, chasing walls and making the same good in cement martor 1:1 restore the same original condition neately as directed by the Engineer in-charge. Joints to be made with CPVC solvent cement up to 50mm dia as per ASTM D-2846 and above 50mm dia primer P-70, and solvent confirming to ASTM F-4931 / 724 All exposed pipe shall be painted with latex paint. (for shafts, basement ceiling ringmain Terrace & PRM).The rate shall include necessary GI supports, GI grip bolts, angle brackets, hangers, supports as with suitable GI U-clamps, bolts, nuts and washers etc., The clamps shall be painted with two coats of enamel (approved) paint over a coat of primer etc., complete. Make:- Supreme/ Ashirbad/ AKG.

-

-

-

... More
20 mm dia C-PVC pipe (Oriplast/Supreme)

-

-

-

... More
Campus 1

77.4

-

144.2

... More
Campus 2

35

-

144.2

... More
25 mm dia C-PVC pipe (Oriplast/Supreme)

-

-

-

... More
Campus 1

45.6

-

164

... More
Campus 2

20

-

164

... More
32 mm dia C-PVC pipe (Oriplast/Supreme)

-

-

-

... More
Campus 1

174.4

-

206.8

... More
Campus 2

38

-

206.8

... More
40 mm dia C-PVC pipe (Oriplast/Supreme)

-

-

-

... More
Campus 1

110

-

343.9

... More
Campus 2

20

-

343.9

... More
supplying all materials, labour, T&P and cutting holes through existing brick work including making good the damages in cement mortar (1:4) for taking G.I. Pipes and fittings/ P.V.C. pipes and fittings etc. all complete as per P.H. specification and direction of Engineer-in-charge. 250 mm thick wall

-

-

-

... More
Campus 1

37

-

50

... More
Campus 2

20

-

50

... More
Supplying all materials, labour, T&P and cutting grooves in pucca floors and walls for taking G.I./P.V.C. pipes and making good the damages as per direction of the E.I.C.

-

-

-

... More
Campus 1

82

-

173

... More
Campus 2

22

-

173

... More
SANITARY FIXTURES & SEWEAGE SYSTEM

-

-

-

... More
Supplying all materials, labour, T&P and fixing the following vitreous china Wash Down Water Closet (European type W.C. pan) of Hindware/Jaquar/Parryware with integral 'p' or 's' trap to the floor with wooden plug and chromium plated pedestal screws including jointing the trap with soil pipe in cement mortar (1:1) fixing plastic seat and cover for wash down water closet with chromium plated brass hinges and rubber buffers including polishing etc all complete as per specification and direction of the Engineer-In-Charge.(cistern with all fittings)

-

-

-

... More
EWC with 'p' / S trap plain CERA CONVENTIONAL (520x360x390) CAT. NO. S105310 STRAP

-

-

-

... More
Campus 1

8

-

4390.5

... More
Campus 2

8

-

4390.5

... More
Supplying all materials, labour, T&P and fixing vitreous china water closet, squatting pan (Indian type W.C pan/Orissa pattern squatting pan conforming to IS:2556-part-3-2004) duly embedded in cement concrete (1:5:10) using 4cm size hard granite metal including fixing a pair of vitreous china 250mm x 130mm x 30mm footrest, fixing 100mm dia HCI ‘P’ or ‘S’ trap (with/without 50mm dia horn) for water closet squatting pan including jointing the trap with pan in cement mortar (1:1), cutting the floor and mending good the damages etc all complete as per specification and direction of the Engineer in charge. 580mm size Orissa pan CERA CELINA S3010101 (580x440mm) (cistern with all fittings)

-

-

-

... More
Campus 1

18

-

4527.25

... More
Supplying all materials, labour, T&P and fixing Health Faucet of Hindware/Jaquar/Parryware complete with Chromium plated brass brackets fixed to wooden plugs with Chromium plated brass screws as per specification and direction of the Engineer-In-Charge.

-

-

-

... More
15mm dia CP Health Faucet of Jaquar 1.2mtr long, 8MM dia Jaquar ALD-573, Page-110.

-

-

-

... More
Campus 1

8

-

895.1

... More
Campus 2

8

-

895.1

... More
Supplying all materials, labour, T&P and fixing standard sized two way Bib cock of Hindware/Jaquar/Parryware of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification complete as per direction of Er-in-charge. 15mm dia CP Two way bib cock with Flange Jaquar FUS-29041, Page-58.

-

-

-

... More
Campus 1

26

-

1202.8

... More
Campus 2

8

-

1202.8

... More
Supplying all materials, labour T&P and fixing wash basins of Hindware/Jaquar/Parryware with hole for pillar taps with cast iron or M.S.brackets painted white including cutting holes in walls and making good the damages with supply of wooden plugs, screws and cement etc, fixing pedestal for wash basin recessed at the back for the reception of pipes and fittings, fixing PVC waste pipe of 32mm nominal diameter for wash basin including brass check nut complete, fixing pillar taps capstan head screw down high pressure lettered 'Hot' and 'Cold' with long screws, shanks and back nuts of 15mm dia nominal bore, fixing 15mm dia PVC inlet connection pipe and making connection with pillar cocks and supply mains for wash basin, fixing 32mm dia CP brass waste, etc all complete as per specification and direction of the Engineer-In-Charge.

-

-

-

... More
CERA COUNSEL 510x400mm Cat No.S2040101 Wash Basin Cat No. S2090101 Pedestal

-

-

-

... More
Campus 1

8

-

3996.5

... More
Campus 2

7

-

3996.5

... More
Supplying all materials, labour, T&P and fixing standard sized pillar cock of of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification and direction of Engineering-in-charge. 15mm dia brass pillar cock (Cera PRS-031)

-

-

-

... More
Campus 1

8

-

110.3

... More
Campus 2

7

-

110.3

... More
Supplying all materials, labour, T&P and fixing mirror of superior glass mounted on 6mm thick A.C.sheet or plywood sheet and fixed to wooden plugs with CP screws and washers complete as per specification and direction of the Engineer-in-charge. 600mmx450mm size B.E.mirror (Alpina/Golden fish/Belgion)

-

-

-

... More
Campus 1

24

-

2488.7

... More
Campus 2

7

-

2488.7

... More
Supplying all materials, labour, T&P and fixing standard sized Robe Hook of Hindware/Jaquar/Parryware complete with all as per specification and direction of the Engineer in charge.

-

-

-

... More
Campus 1

36

-

594.9

... More
Campus 2

10

-

594.9

... More
Supplying all materials, labour, T&P and fixing standard sized 15mm dia angular Stop cock of Hindware/Jaquar/Parryware of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification complete as per direction of Er-in-charge. 15mm dia CP angle stop cock with wall flange Jaquar - FUS-29053, Page-58.

-

-

-

... More
Campus 1

85

-

834.6

... More
Campus 2

14

-

834.6

... More
Fixing of 32mm dia Brass/GM Fulway Valve confirming to IS : 781-1995 of approved make as per specification complete as per direction of Er-in-charge. 32mm dia brass or gun metal full way valve.(Make- Shakti or equivalent.)

-

-

-

... More
Campus 1

10

-

1881.9

... More
Campus 2

6

-

1881.9

... More
Fixing of 25mm dia Brass/GM Fulway Valve confirming to IS : 781-1995 of approved make as per specification complete as per direction of Er-in-charge. 32mm dia brass or gun metal full way valve.(Make- Shakti or equivalent.)

-

-

-

... More
Campus 1

6

-

1309.1

... More
Campus 2

5

-

1309.1

... More
Fixing of 40mm dia Brass/GM Fulway Valve confirming to IS : 781-1995 of approved make as per specification complete as per direction of Er-in-charge. 40mm dia brass or gun metal full way valve.(Make- Shakti or equivalent.)

-

-

-

... More
Campus 1

6

-

2397.5

... More
Campus 2

8

-

2397.5

... More
Supply all materials, labour, T&P and providing fitting & fixing (Aqua guard) pure Chill 80 PSS UV of size 750x570x1350 mm height with water storage capacity 80 liters along with 2 nos of fancets 1 for cold water and 1 for normal water including a flow of 1.5 ltr per minute etc. all complete as per approved drawing, specification and direction of the EIC.

-

-

-

... More
Campus 1

2

-

72175.4

... More
Campus 2

1

-

72175.4

... More
Fixing Rotational moulded Poly Propelene double layer cylindrical vertical water storage tanks confirming to IS 12701-1996 including cutting holes through the tank and fixing mild steel tubes and fitting and providing extra sockets and jam nuts, fixing ball valve etc,including hosting upto a height of 5 mtr above ground level and placing the tank to the required postion etc all complete as per specification and direction of the Er-in-charge.

-

-

-

... More
Campus 1-1000ltr

4

-

12078.24

... More
Campus 1- 2000 ltr

8

-

17513.14

... More
Campus 2- 2000 ltr

4

-

17513.14

... More
Supplying, fixing and testing PVC muilty floor trap/Nahani Trap with SS frame and cover 75mm dia outlet fixed on a bed of cement concrete with (Heavy duty type) etc., complete.

-

-

-

... More
Campus 1

31

-

316.7

... More
Campus 2

10

-

316.7

... More
Supplying all materials, labour, T&P and fixing standard sized maxon company round u shaped 8 pin cloth hanger

-

-

-

... More
Campus 1

40

-

325

... More
Campus 2

4

-

325

... More
Providing ,fixing , testing and commissioning of clean outs fabricated from heavy duty PVC pipe for waste and soil lines inside toilets for effective maintenance, laid true to finished floor level with brass chromium plated frame and screw type of cover

-

-

-

... More
Campus 1

36

-

205.9

... More
Campus 2

5

-

205.9

... More
Supplying all materials, labour, T&P and fixing standard sized 600 mm long towel rail

-

-

-

... More
Campus 1

16

-

690

... More
Campus 2

4

-

690

... More
Supplying all materials, labour, T&P and fixing standard sized stainless steel oval shape soap dish

-

-

-

... More
Campus 1

16

-

296.3

... More
Campus 2

11

-

296.3

... More
Providing ,fixing , testing and commissioning of approved make PVC vent cowl with necessary accessories etc., complete. Make-Supreme , Page-48

-

-

-

... More
Campus 1

24

-

53.5

... More
Campus 2

5

-

53.5

... More
Supplying, fixing and testing of kitchen Sink Stainless steel kitchen sink - with drain board 510x1040 mm bowl depth 250 mm

-

-

-

... More
Campus 1

1

-

7649.7

... More
Supplying all materials, labour, T&P and fixing standard sized Sink pillar cock of of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification and direction of En

-

-

-

... More
Campus 1

1

-

1679.9

... More
Supplying all materials, labour, T & P and constructing Gully trap chamber of the following inside size with 8 cm thick R.C.C. precast cover slab in CC (1:2:4) mix using 12mm size h.g. chips, foundation concrete (1:4:8) using 40mm size h.g. metal on bed aound trap , Fly Ash brickwork in CM (1:6) in P&F and inside 12mm thick cement plastering (1:3) finished with a floating coat of neat cement including fixing 100mm x100mm size gully trap, 150mm x150mm C.I gratig etc. all complete as per aproved drawing, specification and direction of Engineer-in-charge.

-

-

-

... More
Campus 1

10

-

1941.5

... More
Campus 2

8

-

1941.5

... More
Supplying all materials, labour, T & P and constructing of Inspection chamber of the following inside size with 8 cm thick R.C.C. precast cover slab in CC (1:2:4) mix using 12mm size h.g. chips, foundation concrete (1:4:8) using 40mm size h.g. metal on bed aound trap , Fly Ash brickwork in CM (1:6) in P&F and inside 12mm thick cement plastering (1:3) finished with a floating coat of neat cement including fixing 100mm x100mm size gully trap, 150mm x150mm C.I gratig etc. all complete as per aproved drawing, specification and direction of Engineer-in-charge.

-

-

-

... More
Manhole 900mm x800mm x600mm

-

-

-

... More
Campus 1

3

-

12876.9

... More
Campus 2

3

-

12876.9

... More
Supplying, fixing and testing PVC soil, waste, Rain and vent pipes (SWR) SUPREME confirming to IS13592 : 1990, type B with rubber ring/Solvent (confirming toIS5382) joint inclusive of allnecessary specials like bends, tees,offsets, door bends, junctions, cowls, etc.,laid underfloor/ fixed on walls,and in pipe shafts etc., complete.The rate shall include necessary GI supports, GI grip bolts, angle brackets, hangers, supports as with suitable GI U-clamps, bolts, nuts and washers etc., The clamps shall be painted with two coats of enamel (approved) paint over a coat of primer etc., complete. Make:- Supreme /Ashirbad/ Astral

-

-

-

... More
Campus 1- 40 mm

113.9

-

189.5

... More
Campus 2 - 40 mm

35

-

189.5

... More
Campus 1 -75 mm

113.9

-

206.8

... More
Campus 2-75 mm

40

-

206.8

... More
Campus 1- 110 mm

167.7

-

343.1

... More
Campus 2- 110 mm

25

-

343.1

... More
Campus 1- 160mm

54

-

690.9

... More
Campus 2- 160mm

30

-

690.9

... More
Providing ,fixing , shower with necessary accessories etc., coplete (100 mm dia head over shower)jaquar ohs 1989

-

-

-

... More
Campus 1

12

-

4742.6

... More
Campus 2

4

-

4742.6

... More
INTERNAL & EXTERNAL ELECTRIFICATION WORK

-

-

-

... More
Internal Wirring

-

-

-

... More
Recessed wiring to light point / first light of group control/ call bell point/ exhaust fan point /wall fan point with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked in 20 mm dia non-metalic PVC conduit with 6 Amp, 250 V clip in type switch ISI marked and ceiling rose ISI marked mounted on G.I modular box with face plate & cover of suitable size , with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accesories and connection as per direction of Engineer in Charge. ( Make of wire Finolex/ L&T / Anchor / Havels / V Guard ) Group C

-

-

-

... More
Campus 1 - Hostel 1

101

-

1050

... More
Campus 1 - Hostel 2

88

-

1050

... More
Campus 1 - Bath

20

-

1050

... More
Campus 1 - Dining

14

-

1050

... More
Campus 2 - Existing classroom building

31

-

1050

... More
Campus 2 - Existing office building

11

-

1050

... More
Campus 2 - Existing office building

7

-

1050

... More
Campus 2 - Existing classroom building

18

-

1050

... More
Campus 2 - Toilet block

8

-

1050

... More
Recessed wiring to secondary light point looped from primary light point with 1.5sqmm FR PVC insulated single core multistrand copper conductor of ISI marked with 20mm dia non-metallic PVC conduit with 1.5sqmm FR PVC insulated single core multistrand copper conductor for running earth including 3 plate ISI marked Ceiling rose with all accessories & connection as per direction of Engineer in charge. (Make of wire: finolex/ Anchor/Havels/L&T/KDK) Average Length: 3 mtr

-

-

-

... More
Campus 1 - Hostel 1

11

-

377

... More
Campus 1 - Hostel 2

10

-

377

... More
Campus 1 - Dining

12

-

377

... More
Campus 2 - Existing classroom building

20

-

377

... More
Campus 2 - Existing office building

8

-

377

... More
Campus 2 - Existing office building

9

-

377

... More
Campus 2 - Existing classroom building

15

-

377

... More
Campus 2 - Toilet block

2

-

377

... More
Recessed wiring to ceiling fan point with 1.5sqmm FR PVC insulated single core multistrand copper conductor of ISI marked with 20mm dia non-metallic PVC conduit with 6Amp 250V Modular Switch,Stepped type Moudular Regulator, Base & Cover with 1.5sqmm FR PVC insulated single core multistrand copper conductor for running earth including all accessories & connection as per direction of Engineer in charge. (Make of wire: finolex/ Anchor/ Havels/L&T/KDK) Group B

-

-

-

... More
Campus 1 - Hostel 1

42

-

1483

... More
Campus 1 - Hostel 2

40

-

1483

... More
Campus 1 - Dining

10

-

1483

... More
Campus 2 - Existing classroom building

18

-

1483

... More
Campus 2 - Existing office building

5

-

1483

... More
Campus 2 - Existing office building

4

-

1483

... More
Campus 2 - Existing classroom building

14

-

1483

... More
Recessed wiring for 5 / 6 amp socket outlet with 6Amp, 250 V clip in type switch ISI marked mounted on G.I moular box with face plate & cover of suitable size , with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accesories and connection on same switch board as per direction of Engineer in Charge.

-

-

-

... More
Campus 1 - Hostel 1

16

-

483

... More
Campus 1 - Hostel 2

14

-

483

... More
Campus 1 - Dining

4

-

483

... More
Campus 2 - Existing classroom building

5

-

483

... More
Campus 2 - Existing office building

5

-

483

... More
Campus 2 - Existing office building

4

-

483

... More
Campus 2 - Existing classroom building

8

-

483

... More
Recessed wiring for 2 x 6 amp socket outlet controlled by 2 nos 6Amp, 250 V clip in type switch ISI marked mounted on single G.I moular box with face plate & cover of suitable size including all accesories and connection on separate board as per direction of Engineer in Charge.

-

-

-

... More
Campus 1 - Hostel 1

2

-

839

... More
Campus 1 - Hostel 2

2

-

839

... More
Campus 1 - Dining

3

-

839

... More
Campus 2 - Existing classroom building

4

-

839

... More
Campus 2 - Existing office building

2

-

839

... More
Campus 2 - Existing office building

2

-

839

... More
Campus 2 - Existing classroom building

5

-

839

... More
Recessed wiring for 6 pin 16 amp socket outlet with 5Amp, 250 V clip in type switch ISI marked mounted on G.I moular box with face plate & cover of suitable size , with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accesories and connection as per direction of Engineer in Charge.

-

-

-

... More
Campus 1 - Hostel 1

2

-

620

... More
Campus 1 - Hostel 2

2

-

620

... More
Campus 1 - Dining

12

-

620

... More
Campus 2 - Existing classroom building

4

-

620

... More
Campus 2 - Existing office building

1

-

620

... More
Campus 2 - Existing classroom building

2

-

620

... More
Recessed wiring for Projector socket outlet with 16A plug socket and 16A control switch at nearest separate location

-

-

-

... More
Campus 2 - Existing office building

2

-

698

... More
Campus 2 - Existing classroom building

3

-

698

... More
SUBMAIN

-

-

-

... More
Recessed wiring to submain in 2 x 6 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 25 mm dia non-metalic heavy duty PVC conduit 1.6 mm thick along with 1 x 4.0 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired.

-

-

-

... More
Campus 1 - Hostel 1

40

-

209

... More
Campus 1 - Hostel 2

40

-

209

... More
Campus 2 - Existing classroom building

40

-

209

... More
Recessed wiring to submain in 2 x 2.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty PVC conduit 1.6 mm thick along with 1 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired.

-

-

-

... More
Campus 1 - Hostel 1

370

-

149

... More
Campus 1 - Hostel 2

340

-

149

... More
Campus 1 - Dining

360

-

149

... More
Campus 2 - Existing classroom building

240

-

149

... More
Campus 2 - Existing office building

60

-

149

... More
Campus 2 - Existing office building

60

-

149

... More
Campus 2 - Existing classroom building

260

-

149

... More
Campus 2 - Toilet block

30

-

149

... More
Recessed wiring to submain in 2 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty PVC conduit 1.6 mm thick along with 1 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired.

-

-

-

... More
Campus 1 - Hostel 1

165

-

135

... More
Campus 1 - Hostel 2

135

-

135

... More
Campus 1 - Bath

45

-

135

... More
Campus 1 - Dining

125

-

135

... More
Campus 2 - Existing classroom building

145

-

135

... More
Campus 2 - Existing office building

55

-

135

... More
Campus 2 - Existing office building

45

-

135

... More
Campus 2 - Existing classroom building

145

-

135

... More
Campus 2 - Toilet block

25

-

135

... More
DISTRIBUTION BOARD

-

-

-

... More
Supply and fixing of single pole MCB with sheet steel enclosure, distribution board, on surface /recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, detachable gland plate, interconnection, phosphate and powder painted including earthing etc. as required ( But without MCB/ RCCB/ ISOLATOR)

-

-

-

... More
16 way SPN , MCB DB double door

-

-

-

... More
Campus 1 - Hostel 1

2

-

2140

... More
Campus 1 - Hostel 2

2

-

2140

... More
Campus 1 - Dining

1

-

2140

... More
12 way SPN , MCB DB double door

-

-

-

... More
Campus 2 - Existing classroom building

2

-

1919

... More
Campus 2 - Existing office building

1

-

1919

... More
Campus 2 - Existing office building

1

-

1919

... More
Campus 2 - Existing classroom building

1

-

1919

... More
4 way SPN , MCB DB double door

-

-

-

... More
Campus 1 - Bath

1

-

1208

... More
Campus 2 - Toilet block

1

-

1208

... More
Supply and fixing of following rating 240 V Minature Circuit Breaker (MCB) having a sensitivity current up to 10kA in the existing MCB DB ISI marked complete with connection testing and commissioning etc as required.

-

-

-

... More
6 amp to 32 amp rating SP MCB , "c" series, 10KA breaking capacity

-

-

-

... More
Campus 1 - Hostel 1

24

-

133

... More
Campus 1 - Hostel 2

24

-

133

... More
Campus 1 - Dining

14

-

133

... More
Campus 1 - Bath

2

-

133

... More
Campus 2 - Existing classroom building

20

-

133

... More
Campus 2 - Existing office building

10

-

133

... More
Campus 2 - Existing office building

10

-

133

... More
Campus 2 - Existing classroom building

10

-

133

... More
Campus 2 - Toilet block

2

-

133

... More
Supply and fixing of following rating 240 V Residual Current Breaker with Overcurrent protection (RCBO) having a sensitivity current up to 100mA in the existing MCB DB ISI marked complete with connection testing and commissioning etc as required.

-

-

-

... More
Campus 1 - Hostel 1

2

-

2717

... More
Campus 1 - Hostel 2

2

-

2717

... More
Campus 1 - Dining

1

-

2717

... More
Campus 1 - Bath

1

-

2717

... More
Campus 2 - Existing classroom building

2

-

2717

... More
Campus 2 - Existing office building

1

-

2717

... More
Campus 2 - Existing office building

1

-

2717

... More
Campus 2 - Existing classroom building

1

-

2717

... More
Campus 2 - Toilet block

1

-

2717

... More
FIXTURE

-

-

-

... More
Supply, Installation, Testing and Commissioning of pre-wired fluorescent fiiting / compact fluorescent fitting /LED fitting of all sizes complete with all accessories and lamp etc. directly on ceiling /wall or recessed in false ceiling , including connection with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor and earthing as required.

-

-

-

... More
Campus 1 - Hostel 1

37

-

1358

... More
Campus 1 - Hostel 2

32

-

1358

... More
Campus 1 - Dining

4

-

1358

... More
Campus 1 - Bath

12

-

1358

... More
Campus 2 - Existing classroom building

15

-

1358

... More
Campus 2 - Existing office building

2

-

1358

... More
Campus 2 - Existing office building

4

-

1358

... More
Campus 2 - Existing classroom building

5

-

1358

... More
Campus 2 - Toilet block

10

-

1358

... More
Surface mounted indoor type SINGLE LED TUBE Luminaire with LED Lamp Similar to WIPRO Cat No. WIO921208 or equivalent.

-

-

-

... More
Campus 1 - Hostel 1

64

-

1350

... More
Campus 1 - Hostel 2

54

-

1350

... More
Campus 1 - Dining

20

-

1350

... More
Campus 1 - Bath

6

-

1350

... More
Campus 2 - Existing classroom building

27

-

1350

... More
Campus 2 - Existing office building

12

-

1350

... More
Campus 2 - Existing office building

8

-

1350

... More
Campus 2 - Existing classroom building

22

-

1350

... More
Surface mounted indoor type BULK HEAD LED Luminaire with LED Lamp Similar to WIPRO Cat No. LW07-141-XXX-57-XX or equivalent.

-

-

-

... More
Campus 1 - Hostel 1

2

-

1904

... More
Campus 1 - Hostel 2

4

-

1904

... More
Campus 2 - Existing classroom building

1

-

1904

... More
Supplying and fixing of Energy efficient Street light LED luminaire with high pressure die cast aluminium housing with pure polyester powder coated dark grey Housing with high purity PMMA lense,Toughened glass with silicon gaskets for IP66 protection, wattage in range 30 watt Similar to WIPRO Cat No. LR02-331-XXX-57-XX or equivalent

-

-

-

... More
Campus 1 - Hostel 1

5

-

3066

... More
Campus 1 - Hostel 2

4

-

3066

... More
Campus 1 - Dining

2

-

3066

... More
Campus 1 - Bath

2

-

3066

... More
Campus 2 - Existing classroom building

6

-

3066

... More
Campus 2 - Existing office building

4

-

3066

... More
Campus 2 - Existing office building

4

-

3066

... More
Campus 2 - Existing classroom building

6

-

3066

... More
Supplying and fixing of 32 mm dia X 2.00 metres long G.I. pipe (medium class) bracket for mounting of fluorescent / HPMV / HPSV street light fitting on pole including bending the pipe to the required shape, 2 nos 40 mm X 3 mm flat iron clamps with nuts, bolts and washer, painting the flat iron with primer and finish paint etc. as required.

-

-

-

... More
Campus 1 - Hostel 1

5

-

767

... More
Campus 1 - Hostel 2

4

-

767

... More
Campus 1 - Dining

2

-

767

... More
Campus 1 - Bath

2

-

767

... More
Campus 2 - Existing classroom building

6

-

767

... More
Campus 2 - Existing office building

4

-

767

... More
Campus 2 - Existing office building

4

-

767

... More
Campus 2 - Existing classroom building

6

-

767

... More
Supply, Installation, Testing and Commissioning of ceiling fan 1200mm sweep, including wiring the down rods of standard length (upto 30 cm) with 1.5 sq.mm FR PVC insulated single core multiatrand copper conductor etc. as required.

-

-

-

... More
Campus 1 - Hostel 1

42

-

2594

... More
Campus 1 - Hostel 2

40

-

2594

... More
Campus 1 - Dining

10

-

2594

... More
Campus 2 - Existing classroom building

18

-

2594

... More
Campus 2 - Existing office building

5

-

2594

... More
Campus 2 - Existing office building

4

-

2594

... More
Campus 2 - Existing classroom building

14

-

2594

... More
Supply, Installation, testing and commissioning of exhaust fan of 300 mm sweep 900 rpm in the existing opening, including making the hole to suit the size of the above fan, making good the damage complete, connection, etc as required.

-

-

-

... More
Campus 1 - Hostel 1

4

-

2872

... More
Campus 1 - Hostel 2

4

-

2872

... More
Campus 2 - Existing classroom building

2

-

2872

... More
Campus 2 - Existing office building

1

-

2872

... More
Campus 2 - Toilet block

1

-

2872

... More
EARTHING

-

-

-

... More
Earthing with GI earth plate 600 mm x 600mm x 6 mm thick ISI marked including accessories and providing masonary with cover plate having loccking arrangement and watering pipe etc with charcoal and salt as required.

-

-

-

... More
Campus 1 - Hostel 1

1

-

3344

... More
Campus 1 - Hostel 2

1

-

3344

... More
Campus 1 - Dining

1

-

3344

... More
Campus 1 - Bath

1

-

3344

... More
Campus 1 - External

2

-

3344

... More
Campus 2 - Existing classroom building

1

-

3344

... More
Campus 2 - Existing office building

1

-

3344

... More
Campus 2 - Existing office building

1

-

3344

... More
Campus 2 - Existing classroom building

1

-

3344

... More
Campus 2 - External

2

-

3344

... More
Supplying and laying 25 mm x 6 mm G.I earth strip ISI marked at 0.5 meter below ground level as strip earth electrode including soldering etc. as required.

-

-

-

... More
Campus 1 - Hostel 1

10

-

77

... More
Campus 1 - Hostel 2

10

-

77

... More
Campus 1 - Dining

10

-

77

... More
Campus 1 - Bath

10

-

77

... More
Campus 1 - External

20

-

77

... More
Campus 2 - Existing classroom building

10

-

77

... More
Campus 2 - Existing office building

10

-

77

... More
Campus 2 - Existing office building

10

-

77

... More
Campus 2 - Existing classroom building

10

-

77

... More
Campus 2 - External

20

-

77

... More
Supplying and laying 25 mm x 5 mm G.I earth strip ISI marked on surface or in recess for connection etc as required.

-

-

-

... More
Campus 1 - Hostel 1

6

-

128

... More
Campus 1 - Hostel 2

6

-

128

... More
Campus 1 - Dining

6

-

128

... More
Campus 1 - Bath

5

-

128

... More
Campus 1 - External

10

-

128

... More
Campus 2 - Existing classroom building

6

-

128

... More
Campus 2 - Existing office building

6

-

128

... More
Campus 2 - Existing office building

6

-

128

... More
Campus 2 - Existing classroom building

6

-

128

... More
Campus 2 - External

10

-

128

... More
Providing and fixing 6 SWG GI wire on surface or in recess for loop earthing as required.

-

-

-

... More
Campus 1 - Hostel 1

10

-

53

... More
Campus 1 - Hostel 2

10

-

53

... More
Campus 1 - Dining

10

-

53

... More
Campus 1 - Bath

10

-

53

... More
Campus 1 - External

20

-

53

... More
Campus 2 - Existing classroom building

10

-

53

... More
Campus 2 - Existing office building

10

-

53

... More
Campus 2 - Existing office building

10

-

53

... More
Campus 2 - Existing classroom building

10

-

53

... More
Campus 2 - External

20

-

53

... More
PANEL

-

-

-

... More
Supply, installation,testing & commissioning of floor mounting front operated front access extensible type cubicle panel totally enclosed, dust and vermin proof with IP-42 /55 protection with hinged and lockabale doors.CRCA sheets including Busbars, interconnections,tinned copper crimping lugs, bonding to earth and painting suitable for use at 415 V, 3phase 4 wire 50 Hz system, and to withstand a fault level of 35KA symmetrical for 1 sec at 415 V complete as per specifications, as required and as below : All switchboards shall have provision for entry of cables from the bottom as required. All live accessible parts shall be shrouded and all equipment shall be finger touch proof. The bus bars shall be insulated with heat shrinkable sleeves.SMC/DMC shrouds and busbar supports shall be used.

-

-

-

... More
Campus 1

1

-

86638

... More
Campus 2

1

-

86638

... More
CABLE

-

-

-

... More
Supply of one number of PVC insulated and PVC seathed / XLPE power cable of 1.1 KV grade of following sizes of cable as required. (Make of Cable- Havells, Polycab, KEI or equivalent)

-

-

-

... More
Campus 1- 3.5C x 35 sq.mm Al

55

-

261

... More
Campus 2- 3.5C x 35 sq.mm Al

55

-

261

... More
Campus 1- 2 C x 6 sq.mm Al

365

-

68

... More
Campus 2- 2 C x 6 sq.mm Al

365

-

68

... More
Laying of one number of PVC insulated and PVC seathed / XLPE power cable of 1.1 KV grade ofsize exceeding 25 sq.mm but not exceeding 400 sq.mm in the existing RCC/HUME/STONEWARE/METAL pipe as required.

-

-

-

... More
Campus 1

55

-

56

... More
Campus 2

55

-

56

... More
Laying of one number of PVC insulated and PVC seathed / XLPE power cable of 1.1 KV grade of size not exceeding 25 sq.mm direct in ground in the existing RCC/HUME/STONEWARE/METAL pipe as required.

-

-

-

... More
Campus 1

210

-

41

... More
Campus 2

210

-

41

... More
Laying and fixing of one number of PVC insulated and PVC seathed / XLPE power cable of 1.1 KV grade of size exceeding 25 sq.mm but not exceeding 120 sq.mm on surface as required.

-

-

-

... More
Campus 1

10

-

122

... More
Campus 2

10

-

122

... More
Laying and fixing of one number of PVC insulated and PVC seathed / XLPE power cable of 1.1 KV grade of size not exceeding 25 sq.mm on surface as required.

-

-

-

... More
Campus 1

35

-

79

... More
Campus 2

35

-

79

... More
END TERMINATION

-

-

-

... More
Supplying and making end termination with brass compression gland and aluminum lugs for following size of PVC insulated and PVC sheathed / XLPE aluminum cable of 1.1 KV as required.

-

-

-

... More
3.5 C x 35 sq.mm Al

-

-

-

... More
Campus 1

2

-

315

... More
Campus 2

2

-

315

... More
2 C x 6 sq.mm Al

-

-

-

... More
Campus 1

12

-

143

... More
Campus 2

12

-

143

... More
EXTERNAL LIGHTING

-

-

-

... More
4M long G.I.octagonal pole complete with RCC foundation, required G.I base plate , single-arm of ERW galvanised pipe 30mm - 1M length, providing GI pipes for cable entry junction box with prewired 6 Amp SP MCB, loop-in -loop-out , terminal block, wiring with copper wire upto the fitting etc. complete

6

-

12573

... More
4M long G.I.octagonal pole complete with RCC foundation, required G.I base plate , single-arm of ERW galvanised pipe 30mm - 1M length, providing GI pipes for cable entry junction box with prewired 6 Amp SP MCB, loop-in -loop-out , terminal block, wiring with copper wire upto the fitting etc. complete

6

-

10278

... More
Supply , fixing & termination of Outdoor Street Light LED Luminaire with 40w LED Lamp similar to WIPRO Cat No. LR02-451-XXX-57-G1 or equivalent

-

-

-

... More
Campus 1

6

-

6108

... More
Campus 2

6

-

6108

... More
Supply , fixing & termination of 30watt LED for use as Gate Light fitting complete with cover, GI pipe bracket, necessary wiring from loop-in-box with 3Cx1.5 sqmm copper wires inside PVC pipes etc complete as required with all materials similar to WIPRO Cat No. LP07-251-XXX-57-CL or equivalent

-

-

-

... More
Campus 1

2

-

6746

... More
Campus 2

2

-

6746

... More
Supply and Laying of one number of PVC insulated and PVC seathed / XLPE power cable of 1.1 KV grade of 2Cx 6 sq.mm Al.direct in ground in the same trench in one tier horizontal formation including excavation , sand cushining protective covering and refilling the trench etc. as required.

-

-

-

... More
Campus 1

140

-

208

... More
Campus 2

140

-

208

... More
Supplying and making end termination with brass compression gland and aluminum lugs for 2C x 6 sq.mm of PVC insulated and PVC sheathed / XLPE aluminum cable of 1.1 KV as required.

-

-

-

... More
Campus 1

12

-

138

... More
Campus 2

12

-

138

... More
Supplying and fixing of 16 / 18 SWG metal box of 200 mm x 150 mm x 60 mm deep on surface / recess with suitable size of phenolic laminated sheet cover in front including cutting the wall and making good the same in case of recessed conduit as required.

-

-

-

... More
Campus 1

2

-

183

... More
Campus 2

2

-

183

... More
Supplying and fixing of of 50mm G.I pipe(Medium Class) along with accessories in ground including cutting & making good the same as required.

-

-

-

... More
Campus 1

20

-

184

... More
Campus 2

20

-

184

... More
Supply, delivery & installation of GI coil earthing made out of 8 swg GI wire closely wound in shape of a helical coil of 50mm diameter with 115 numbers of turns including excavation of earthpit of size 800x 800x 1500mm in all kinds of soil, back filling the excavated pit with alternate layers of salt, charcoal around the coil with a diameter of 300mm upto 1000mm and balance by good quality soil, end termination complete as required.

-

-

-

... More
Campus 1

6

-

774

... More
Campus 2

6

-

774

... More
Supply, delivery, errection, testing and commissioning of 16.5mtr High Mast consists of 6nos 1 x 150 w LED fittings complete with all mechanical accessories including motorised winch, head frame, carriage ring. the winch shall be double drum, 5 nos wire ropes( 6mm) , hot dipped galvanised, complete with all foundation accesories like foundation bolts, anchor plates, lightening arrestor, aviation light .the electrical accessories include 2.5sqmm x5 core cable, timer panel with 32 amp 4P MCB along with 65KA SPD 4nos., motor 2 h.p.(kirloskar /gec /elgi/-crompton) and associated starter.complete as required and as per the direction of Engineer-in-charge. (5 yrs warranty)

-

-

-

... More
Campus 1

1

-

300000

... More
Campus 2

1

-

300000

... More
BOREWELL

-

-

-

... More
Sinking of 200/150 mm dia borewell

-

-

-

... More
Supplying all labour & T&P for drilling a perfectly vertical bore hole of'specified diameter for a specified depth below ground level through consolidated and un-consolidated rock with Combination drilling as required to suit the site condition etc all complete as per the direction of Engineer-in-charge including Use of own rig with its accessories of 200/15Omm dia PVC pipes for housing fitted with socket and with or without well screens as per the necessity for the soft, medium, hard and boulder formation PVC pipes if required to prevent collapse of the over borden is to be provided by the contractor including lowering and withdrawing after completion of the tube well 200mm dia to 400mm dia in over burden portion including packing of gravel supplied by the contractor for 400mm boe only etc. all complete as per the direction of the Engineer-in-charge.

-

-

-

... More
200mm. dia

-

-

-

... More
00 mtr to 45.00" mtr.

60

-

884.57

... More
.150mm.dia

-

-

-

... More
45.00" to onward

123

-

884.57

... More
Lowering the following size Gl/PVC pipe with or without slotted pipes as per the necessity from GL up to 30mtr. depth and fitted and fixed up perfectly vertical position including cutting & threading pipe and slotted pipe and supplying fixing all jointing materials T &P etc.complete and keeping the top of the casing pipe threaded including plugguing tube wells to prevent entry of foreign materials from above as per direction of the Engineer-of-charge

-

-

-

... More
200mm dia PVC pipes 00 mtrs to 45.00 mtrs

60

-

219.84

... More
Cleaning and developing the tube well with their own compressor continuously worked till clear & adequate discharge is obtained from the tube well including supply and use of all necessary equipments and labours as per the direction of the Engineer-in-charge.

1

-

7979.17

... More
Supply all labour & T&P of 200mm dia PVC casing pipe.

60

-

1284.42

... More
(B ) Installation of motor

-

-

-

... More
Supply of Submersible C.G pump set 1 HP 18 stage at work site including all cost,taxes& transportation.

1

-

17500

... More
Supply of C.G Pannel Board for 1HP at work site including all cost, taxes & transportation.

1

-

5500

... More
Supply of Oriplast Column pipe at work site including all cost, taxes & transportation.

250

-

143.2

... More
Supply of 40mmx32mm G.I short pipe at work site including all cost, taxes & transportation.

1

-

115

... More
Supply of 40mmx32mm G.I R Socket at work site including all cost, taxes & transportation.

1

-

49

... More
Supply of 40mm Stainless steel Nipple at work site including all cost, taxes & transportation.

2

-

281

... More
Supply of 40mm G.I Union at work site including all cost, taxes & transportation.

1

-

182

... More
Supply of Jet clamp at work site including all cost, taxes & transportation.

1

-

174

... More
Supply of 40mm G.I Bend at work site including all cost, taxes & transportation.

1

-

48

... More
Supply of 40mm G.I Socket at work site including all cost, taxes & transportation.

2

-

32

... More
Supply of 40mm Brass F.W. Valve(I.S.I) at work site including all cost, taxes & transportation.

1

-

672

... More
Supply of 2.5mm Cable at work site including all cost, taxes & transportation.

75

-

80.5

... More
Supply of Tochan wire at work site including all cost, taxes & transportation.

80

-

97.45

... More
Supply of 4sqmm service wire at work site including all cost, taxes & transportation.

40

-

22

... More
Supply of of Hole tite 50gm at work site including all cost, taxes & transportation.

1

-

55

... More
Supply of Dhaga at work site including all cost, taxes & transportation.

4

-

6

... More
Supply of Teflon tape at work site including all cost, taxes & transportation.

2

-

50

... More
Supply of Black tape at work site including all cost, taxes & transportation.

2

-

28

... More
Supply of Masari jali (1mmx1mm) at work site including all cost, taxes & transportation.

1

-

68

... More
Supply of Boring cap at work site including all cost, taxes & transportation.

1

-

475

... More
Labour charges for instalation of 1H.P submersible pump set,cable,tochen wire,panel board etc. all complete.

1

-

5200



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.