South East Central Railway Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
South East Central Railway - SECR Tender
Civil And Architectural Services
Ireps
Opening Date9 Jan 2025
Closing Date31 Jan 2025
Tender Amount₹ 17,49,154.1
Costs
EMD
₹ 35,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Conducting Final Location Survey, Including Collection Of Field Details For Geotechnical Investigation, Preparation Of Gads & Other Drawings And Preparation
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
CEC-BSP-24-25-18-CAO-C-HQ-ENGINEERING/SOUTH EAST CENTRAL RLYTender No
CEC-BSP-24-25-18Tender Authority
South East Central Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Casting, transporting and fixing precast RCC boundary pillars with M15 grade of size 350mm (bottom), 230mm (top), 1550mm height, 100mm thick or as per approved drawing/sketch 4 supplied including engraving the letters SECR and applying one coat of primer, and two coats of red enamel paint and painting the engraved letters with white paint including excavation of pit and fixing into ground up to 900 depth with contractors OP cement, steel, labour, tools, materials all lead and lift involved, curing etc., complete as per specifications and as directed by the Engineer-In-Charge.
250
280
70020
... More
Extra for Revision/Modifications in L-Sections/ Plans by Railway after final approval of 5 engineer in charge in each sheet and submission of another set of coloured drawing on tracing, three copies of white print and soft copy for final approval. (Note: Here Qty unit "Each" stands for "Each Sheet")
2
611
1223.56
... More
Preparation of existing & proposed layout plan including detailed plan/section of station building, quarters, structures on Auto CAD and submission of print on white paper and tracing for approval of Railways.
10
1121
11212.1
... More
Preparation of the General Arrangement Drawing for all minor bridges based on finalized L- section for the proposed alignment & detailed geotechnical investigation carried out by the contractor under separate schedule.
6
3688
22129.02
... More
Preparation of the General Arrangement Drawing for all RUBs/ROBs/RoRs based on finalized L- section for the proposed RoRs alignment & detailed geotechnical investigation carried out by the contractor under separate schedule.
-
-
8
... More
Calculation of land widths and preparation of land plans in original on tracing 9 cloth/film of 70 microns required for the land to be acquired duly indicating chainages and widths along with alignment including station yards to a suitable scale as directed by the Engineer-in- charge.
10
602
6020.7
... More
Preparation and submission of land acquisition proposals duly collecting land and village maps from revenue authorities and marking the proposed alignment including land widths for land acquisition purpose including copies of pahanis/Nakshas and khasras of individuals from the 10 Revenue department of relevant districts /villages including plotting the details of length and width of land requirement and all other parameters as required for land acquisition, furnished details in form A & D and making booklet with all contractor's Engineers supervisors /Technical assistants drawing and other required equipment overhead charges etc. required for collecting the details from revenue department as directed by the Engineer-in-charge in consultation with railway department.
10
1269
12694.4
... More
Preparation of necessary documents for issue of notifications under section 11, 12 & 19 or as per any other relevant section of the New Land acquisition act 2013 or old act in force for stage-I & II approvals duly attending the JMC of revenue forest and railway authorities including making arrangements for conveyance to the officials necessary labour for pulling chains and fixing 11 flags etc. and assisting in taking measurements preparation of sketches making the booklets in 6 copies to submit to the revenue authorities with all contractor's supervisors tools vehicles consumables all lead and lifts involved stationery Xerox copying charges etc. complete and as directed by Engineer-in-charge. Note for 11,12,13- If projects declared as 'Special Railway Project ' than land acquisition be processed as per New RAA- 2008 and accordingly proposal be prepared as Para 20A,20E Tec
10
3092
30920.3
... More
A Hydrological investigation for Bridges using DEM: Conducting hydrological investigation including detailed calculation for important major/minor bridges using Digital Elevation Model (Geological information system) Tasks: i.e. Marking of all bridge locations on index plan of the alignment. ii. Delineating the catchment boundary of bridges from DEM and calculating physiographic parameters of the catchment - area, longest stream, slope iii. Calculating design discharge (Q50) for all bridges based on RBF 16 / RBF 22 reports for small catchments and synthetic unit hydrograph from flood estimation report for large catchments (> 25 sq km). iv. Consultant will verify if there are any dams / water storage structures in the catchment and obtain regulated flow 12 discharge from concerned authority for calculation of design discharge. v. Checking of adequacy of proposed linear waterway, vertical clearance, free board and depth of foundation. Soil investigation report for scour depth calculations will be provided to the consultant. Deliverables i. 3 copies of report with bridge wise hydrological calculations should be submitted. Separate booklets should be prepared for major and minor bridges. ii. For each bridge, calculations and catchment plan with longest stream marked on Survey of India toposheet should be submitted. For bridges with large catchments, unit hydrograph and calculation of equivalent slope should also be submitted. iii. Catchment plan should be marked on 50 year 24 hr rainfall map to verify correctness of rainfall data used and the same and the same submitted in the booklet. iv. The following are required to be submitted as softcopy - calculation spreadsheets, Google Earth KML files of catchment plans, longest stream, alignment and bridge location.(A) For Minor Bridges
6
862
5173.74
... More
Aerial Videography by unmanned aerial vehicle (UAS-Drone) and submission of digital data/digital image/video in CDs
10
2289
22898.2
... More
Preparation of LWR / CWR and Weld Plans: For Continuously Welded Rail (CWR) track for as much length as possible, for which the Contractor shall prepare the CWR plans for the approval of the Employer in accordance with the design principles/provisions contained in IR LWR (Long Welded Rail) Manual based on approved Track Structure. The consultant shall submit advance copy of the Weld Plans on white paper for approval of Employer. After the approval of Employer, the Consultant shall submit drawings in 3 (three) hard coloured copies on Polyester based tracing paper 14 (100 to 150 Microns) and two soft copies on CD. The scope includes required corrections and modifications as suggested by approving authorities of Railways till its final approval. Required follow up with various approving authorities including required explanations on various provisions/facilities in the ESP shall be arranged by consultant. Note: i) The colour scheme to be followed in the drawing shall be as per standard practice of IR. ii) Payment will be done as per Stages given below - Submission of Weld Plans and approval by Dyce ) / CON / BSP and CE/CON : 60% - Submission of Weld Plans and approval by Divisional HQ : 15% - Submission of Weld Plans and approval by Zonal HQ : 15% - Submission of Weld Plans in hard & soft copies : 10%
12
110
1326.72
... More
Submission of project report for Final Location Survey & detailed estimate with preparation of detailed schedule of quantity for formation work, ballast supply. The report should consist of quantity of earth work, blanket material, ballast, length of retaining walls; length of side 15 drains etc. detailed quantity of various items of minor, major, important bridges, ROB, RUB & cost of estimation thereof. The estimate shall be updated to include items as per the latest practice of Railway & Rly Bd's instructions. The rates adopted for schedule of quantities & detailed estimate should be latest & realistic. Rate analysis should be submitted as per instruction of engineer-in- charge. Note: The details of quantities shall be submitted block section wise during progress of work. Note: (a) The rate includes preparation and submission including modification for ROR of the project. It includes conducting Traffic Survey and preparation of ROR
10
1144
11443.9
... More
Preparation and submission of documents for EPC Tender/Tenders for entire section/various sections as directed by Railway authority. The BOQ shall have to be prepared 16 according to stage wise payments as given in Standard EPC documents for Railways( Standard document is available in Railway Bd's web site or as directed by the Engineer in Charge. The latest document of EPC Tender has been circulated by Railway Bd vide letter No 2018/CEI/CT/36-EPC Contract Policy Pt I Dated 15.11.2021.
1
57858
57858.7
... More
Drilling of 150mm/100mm dia bore holes, in overburden through all types of soil to refusal depth including collection of undisturbed / SPT samples along with submission of necessary test results and bore logs for each type of strata encountered and to recommend the safe bearing capacity of each strata.
300
719
215979
... More
Drilling of NX size bore holes with T.C. Bit through refusal strata., boulder strata and soft/weathered rocks having core recovery from NIL to 40% including supply of core boxes for preserving cores obtained and testing of specimen result and bore logs of each type of strata encountered and to recommend sate bearing capacity. by Engineer-in-charge.
150
891
133669.5
... More
Drilling of NX size bore holes with diamond bit in medium/ hard rock having Core Recovery more than 4% including supply cores boxes for preserving cores obtained and testing of specimen for crushing strength along with submission of necessary test result and bore logs of each type of strata encountered and to recommend safe bearing capacity.
200
1059
211966
... More
Determination of Deformation modulus (Ev2) by conducting cyclic Plate Load Test on 04 top o f compacted blanket layer/prepared subgrade/Embankment fill in accordance with DIN:18134- 2012. This rate is inclusive of all labour, materials, leads, lifts, preparation of testing surface, crossing of tracks, transport including all labour, fuel, tools and plants etc., complete.
9
18369
165326.67
... More
Foot patrolling of proposed track alignment and identifying of LT/HT/EHT lines crossing 01 the proposed track alignment / parallel lines / transformer infringements (Including length of parallel lines both HT/LT required to be shifted beyond 8 mtrs from Centre line of proposed track. (Note: Quatity unit "Job" stands for "Running Kilometer".
10
4000
40000
... More
Detailed survey of EHT lines with 3 copies ofdetailed survey report for each qty. Schedule for modification & cost of modification for identified EHT lines infringing the proposed final alignment of track.a. 33 KV over head line crossing & above
10
13450
134500
... More
Estimates with quantity schedule for following c. LT power line crossings 33 Kv & below 04
10
6629
66291.8
... More
Estimates with quantity schedule for following e. Parallel HT lines above 33 Kv
10
14411
144112.5
... More
Identifying the Infringement of existing S&T cable with in the yard and in section with reference to the new track alignment.
3
16737
50211
... More
Assessment of Quantity and preparation of estimate for signalling and telecommunication arrangement for all stations.
2
19128
38256
... More
Joint Survey and Preparation of new cable route plan with integration of existing cable route plan fortelecom OFC/Quad cable for complete section.
10
1338
13389.6
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%