Scheduled Tribes And Scheduled Castes Development Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Scheduled Tribes And Scheduled Castes Development Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date28 Nov 2024
Closing Date4 Dec 2024
Tender Amount₹ 16,77,915 
Notes
Download

Costs

Summary

Construction Of Additional Class Room At Jamumal Ashram School

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CC (1:4:8) using 40 mm size and down graded crusher broken HG stone metal free from weathered surface of approved quality from approved quarry in foundation and plinth including laying concrete in layers with due compaction, watering and curing including cost, conveyance, royalty and . of all materials with all lead, lifts and delifts, T&P etc required for completion of the work in all respect as per direction of the Engineer-in-charge.

20.48

5106

104574.98

... More
RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all . of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge.

-

-

-

... More
Column base & Footing

14.54

5737

83418.89

... More
Plinth Bend

3.18

6601

20994.04

... More
Column & Beam

10.84

14869

161185.38

... More
Lintel Bend

0.91

13334

12134.4

... More
Chhaja

15.4

1177

18133.5

... More
Roof Slab

14.57

12900

187955.91

... More
Supplying, straightening coiled or bent up MS rods including cutting, bending and welding if required and tying the grills, laying and placing in proper position as per design including cost, conveyance, , . etc of tested MS/TS rod with testing data of required specification & cost of binding wires of 18 to 20 gauge, labour, T&P required for the work complete and as per the specification and direction of the Engineer-in-charge.

54.48

8686

473235.07

... More
Brick work with Fly Ash Brick in cement mortar (1:6) in foundation & plinth including cost, conveyance, royalty, . of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.

17.26

5436

93833.99

... More
Brick work with Fly Ash Brick in cement mortar (1:6) in superstructure including cost, conveyance, royalty, . of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.

11.74

5469

64215.45

... More
Supplying of MS grill gate, MS angle chowkhat of approved specification for doors and windows welded with MS sheet shutters of 18 to 20 gauge thick, openable and electrically welded with all necessary fittings including cost of all materials, labour, T&P, transportation to worksite etc all complete in all respect.

8.26

9292

76751.92

... More
Labour for fitting and fixing of MS doors and windows, MS grill gate as per approved design & all complete.

20.52

78

1606.41

... More
12mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.

138.34

181

25094.88

... More
16mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.

179.06

263

47092.78

... More
6mm thick cement plaster in cement mortar (1:4) to RCC surface finished including watering curing to required period including cost conveyance,royality of all materials,T&P complete etc. As per specification and direction of engineer in charge.

95.85

205

19697.18

... More
Fixing Vertified tile in floors, treads on steps and landing on 25 mm thick bed of cement mortar 1:1(1cement:1 sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing,cost,, conveyance, royalty, . of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.

103.1

970

100007

... More
Fixing Vertified tiles in dado, skirting and rises of steps on 12mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost, conveyance, royalty, . of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.

9

1104

9942.3

... More
Painting two coats of synthetic enamel paint over a coat of primer of approved quality, brand and shade including smoothening the surface by sand paper and filler etc complete with cost, conveyance, royalty, . of all materials, labours T&P required as per specification and direction of Engineer-in-charge.

52.02

260

13561.61

... More
Finishing to walls with two coats weather coat over one coat primer after finishing wall surface of wall with cement based wall putty (water based) and weather coat paint of approved brand and approved colour including cleaning the surface with cost, conveyance, royalty . of all materials labour T&P and scaffolding as required for the work and as per specification and direction of Engineer-in-charge.

169.44

270

45884.35

... More
Finishing to Distempering wall with distemper over one coat primer after finishing wall surface of wall with cement based wall putty (water based) and weather coat paint of approved brand and approved colour including cleaning the surface with cost, conveyance, royalty . of all materials labour T&P and scaffolding as required for the work and as per specification and direction of Engineer-in-charge.

265.91

259

68950.46



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.