Scheduled Tribes And Scheduled Castes Development Department Tender
... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 1,00,127Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_STSCD_88802_4Bid Award Id
ViewTender No
ITDAGNP-01/2023-24Tender Authority
Scheduled Tribes And Scheduled Castes Development Department ViewPurchaser Address
-Website
http://STandSCDevelopmentDepartment
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
R.R.H.G Stone Masonary in C.M (I:6) in F&P including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.
196.39
659104
3356.1
... More
W.B.C.B brick massnary in C.M. (1:6) in Super Structre with cost,convay & royalty etc. complete and as per the direction of the Engineer-in-charge.GROUND FLOOR
93.76
355566
3792.3
... More
FIRST FLOOR
90.87
369913
4070.8
... More
RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all taxes of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge.GROUND FLOOR Column base & Footing
42.48
207434
4883.1
... More
Plinth Bend
26.39
138642
5253.6
... More
Column & Beam
35.07
380702
10855.5
... More
Lintel Bend
5.03
42789
8506.8
... More
Chhaja
73.67
58891
799.4
... More
Roof Slab
60.21
553913
9199.7
... More
Stair case excluding landing slab
2.47
25515
10330.2
... More
Column & Beam FIRST FLOOR
25.46
309708
12164.5
... More
Lintel Bend
3.56
33279
9348.1
... More
Chhaja
51.43
46477
903.7
... More
Roof Slab
43.77
445591
10180.3
... More
Stair case excluding landing slab
2.47
28487
11533.2
... More
Labour charges for straightening coiled or bent up MS rods including cutting, bending and welding if required and tying the grills, laying and placing in proper position as per design including cost, conveyance,taxes etc of tested MS/TS rod with testing data of required specification & cost of binding wires of 18 to 20 gauge, labour, T&P required for the work complete and as per the specification and direction of the Engineer-in-charge.GROUND FLOOR
262.26
2105528
8028.4
... More
GROUND FLOOR
120.48
993670
8247.6
... More
Providing 25mm thick grading concrete in C.C. (1:2:2) laid in proper slope over terrace roof slab by using two part of sand, one part of cement and two parts of 6mm size black FIRST FLOOR
501.28
166675
332.5
... More
20mm Thick C.P in C.M (1:6) over stone massonaryafter racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.
81.07
17397
214.6
... More
16mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.
750.45
153542
204.6
... More
GROUND FLOOR
750.45
153542
204.6
... More
FIRST FLOOR
617
129446
209.8
... More
12mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.GROUND FLOOR
449.7
64217
142.8
... More
FIRST FLOOR
325.55
48376
148.6
... More
6mm thick C.P. in CM (1:4) to RCC surfaces finished smooth including closed deep chiping and slurry treatment with cost, conveyance, royalty, taxes of all materials & complete work. GROUND FLOOR
409.26
65849
160.9
... More
FIRST FLOOR
274.7
46039
167.6
... More
2.5 cm A.S. flooring with cement concrete (1:2:4) including punning using 12mm H.G.Chips including cost, convayancy & royalty etc. complete.
4
1263
315.9
... More
Fixing Vetrified tiles in floors, treads on steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement: 1 sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing, cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.GROUND FLOOR
440.47
402986
914.9
... More
FIRST FLOOR
274.7
299258
1089.4
... More
Fixing Vetrified tile in dado, skirting and risers of steps on 12mm thick cement plaster (1:3) joint with neat cement slurry mixed with pigment to match the shade of the tiles including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.GROUND FLOOR
32.85
33530
1020.7
... More
FIRST FLOOR
26.56
31882
1200.4
... More
Weather coating two coats to wall with approved shade over one coat of Wall primer on new work to give on even shade including cost of Weather coat per 1 sqm .GROUND FLOOR
604.44
129531
214.3
... More
FIRST FLOOR
376.99
83654
221.9
... More
Distempering two coats to wall with distemper of approved shade on new work. GROUND FLOOR
1541.99
202000
131
... More
FIRST FLOOR
1217.83
163311
134.1
... More
Supplying of MS grill gate, MS angle chowkhat of approved specification for doors and windows welded with MS sheet shutters of 18 to 20 gauge thick, openable and electrically welded with all necessary fittings including cost of all materials, labour, T&P, transportation to worksite etc all complete in all respect.
4475.52
380419
85
... More
Labour for fitting and fixing of MS doors and windows, MS grill gate as per approved design & all complete.
94.5
44138
467.07
... More
Painting two coats of synthetic enamel paint over a coat of primer of approved quality, brand and shade including smoothening the surface by sand paper and filler etc complete with cost, conveyance, royalty, taxes of all materials, labours T&P required as per specification and direction of Engineer-in-charge.GROUND FLOOR
144.59
28990
200.5
... More
FIRST FLOOR
96.39
19837
205.8
... More
Making RCC Jally as per approved design 2.5 cm to 5 cm thick and fixing in cement mortar in position after cutting the grooves etc. complete including cost of all materials.
4.73
1040
220
... More
Cost of Sign board pillar
1
3000
3000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements