Scheduled Tribes And Scheduled Castes Development Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Scheduled Tribes And Scheduled Castes Development Department Tender

Works
Civil And Construction
Eprocure
Opening Date7 Dec 2024
Closing Date27 Dec 2024
Tender Amount₹ 80,12,351 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Flaysh. Brick masonry in Cement mortar (1:6) in super structure and with necessary projections using CB bricks of 9” size having a crushing strength between 75 to 100 kg. Per sq.cm including splays cutting circular moulding chamfering and carbelling and watering and curing for 7 days after immersing the bricks in water for six hours before use etc. complete and as per specification and direction of Engineer -in –charge. including cost and conveyance taxes and royalties of all materials with all labour with T&P required for the work etc. complete and as per specification and direction of Engineer -in –charge. 'Ground Floor

89.13

6182

551001.66

... More
First Floor

30.58

6472

197916.51

... More
Rigid and smooth centering and shuttering for R.C.C. works including false works and dismentalingthen after casting including cost of materials complete. - Ground Floor

491.58

108

53513.4

... More
Rainforced cement concret M-20 grade using 20mm and down graded size crusher broken hard granite chips of approved quality including mixing with concrete mixture, including hoisting and laying in position & compacting with vibrateor to proper design section indlucing all the cost, conveyance, royality & taxes of all materials, labour, rigid smooth centering, shuttering and dismantling the same after 28 days of casting, watering, curing etc. complete as per the direction of Engineer-in-Charge. Ground Floor Column Base Footing

47.35

6704

317477.96

... More
Coloumn & Beam

32.62

12856

419392.08

... More
Plinth Beam

23.23

7031

163341.75

... More
RCC Lintel

8.42

8776

73900.57

... More
Chajja

64.08

929

59589.27

... More
RCC Slab & Chajja

46.18

10441

482197.24

... More
Stair Case

3.52

12334

43417.02

... More
First Floor- Coloumn & Beam

3.67

14212

52159.58

... More
First Floor- RCC Lintel

0.06

9316

558.98

... More
First Floor- Chajja

0.9

1036

933.18

... More
First Floor-RCC Slab

2.9

11314

32811.09

... More
Supplying HYSD/Tor steel reinforcement from SAIL,VIZAG STEEL OR TATA STEEL brand of required diameter of approved quality including Labour charges for cutting, bending, binding and tying the grills and placing in position including cost, conveyance & taxes of reinforcements confirming to ISI standard and binding wire 18 to 20 gauge and as per drawing, design etc. complete as per the direction of Engineer-in-Charge. Ground Floor

213.29

8653

1845745.54

... More
First Floor

11.22

8679

97384.33

... More
16 mm thick cement plaster (1:6) over brick work including racking out joints finishing smooth with proper plumb and line watering curing for seven days with cost, conveyance, royality taxes of all materials, labour, T & P required for the work etc. Complete as per the direction of Engineer-in-Charge. Ground Floor

698.49

238

166492.08

... More
First Floor

71.42

243

17405.77

... More
12mm thick Cement plaster in Cement mortar (1:6) over brick masonry after racking out joints including watering and curing for 7 days including cost and conveyance taxes and royalties of all materials with all labour with T&P required for the work etc. compt as direceted by the Engineer in charge Ground Floor

629.88

169

106833.95

... More
First Floor

255.68

173

44283.78

... More
12mm thick cement plaster (1:4) for brick work with cement punning for skirting after racking out joints including watering and curing for 7 days including cost and conveyance taxes and royalties of all materials with all labour with T&P required for the work etc. compt as direceted by the Engineer in charge Ground Floor

324.36

181

58832.42

... More
First Floor

26.92

185

4995.81

... More
12mm thick Cement plaster in Cement mortar (1:4) over brick masonry after racking out joints including watering and curing for 7 days including cost and conveyance taxes and royalties of all materials with all labour with T&P required for the work etc. compt as direceted by the Engineer in charge Ground Floor

344.44

195

67183.02

... More
Supplying, fitting and fixing M.S. grill gate /Doors/Windows out of M.S. flat confirming to IS-1977/1996 as per the design approved.@3.50kg/sft etc complete as direceted by the Engineer in charge Ground Floor

3718.17

122

455215.55

... More
First Floor

135.84

122

16630.89

... More
Fixing of vertified tiles of 600 mm X 600 mm size in floor on 25 mm thick bed of cement mortar 1 : 1 (1Cement :1Sand ) jointed jointed with neat cement slurry mixed with pigment t match the shades of the tiles including rubbing and polishing etc complete including cost conveyance royality of tiles and all materials. Ground Floor

347.31

1498

520513.5

... More
Distempering two coats to the wall surface with any approved space over a coat of chalk wash including cost and conveyance taxes and royalties of all materials with all labour with T&P required for the work etc. compt and as per specification and direction of Engineer -in –charge Ground Floor

1308.29

138

181564.49

... More
First Floor

354.01

142

50272.96

... More
Painting two coats with weather seal paint (Emulsion) over a coat of primer including cost, conveyance all materilas, labour and T & P etc complete. Ground Floor

629.88

147

92963.99

... More
First Floor

255.68

152

38871.03

... More
Painting two coats with enamal paint of approved colour over priming one coat over iron work with approved primer on new work, etc complete as direceted by the Engineer in charge. Ground Floor

210.67

211

44588.31

... More
First Floor

38.43

217

8339.31



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.