Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Scheduled Tribes And Scheduled Castes Development Department Tender

Civil And Construction
Building Construction
Eprocure
Opening Date9 Aug 2023
Closing Date25 Aug 2023
Tender Amount₹ 32,35,729 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete (1:2:4) with 12mm size crusher broken hard granite chips including all cost, conveyance, royality, taxes of all materials etc. complete as per the direction of Engineer-in-Charge.

0.43

2837

6599.66

... More
Rainforced cement concret M-20 grade using 20mm and down graded size crusher broken hard granite chips of approved quality including mixing with concrete mixture, including hoisting and laying in position & compacting with vibrateor to proper design section indlucing all the cost, conveyance, royality & taxes of all materials, labour, rigid smooth centering, shuttering and dismantling the same after 28 days of casting, watering, curing etc. complete as per the direction of Engineer-in-Charge. Ground Floor a) Coumn footing

17.06

101980

5977.76

... More
b) Column & Beam

11.63

159010

13672.41

... More
c) Plinth Grade Beam

6.26

41794

6676.46

... More
d) Round Lintel

2.37

23291

9827.61

... More
e) R.C.C. Stair case

1.57

21379

13617.32

... More
f) Roof Slabs

11.13

126044

11324.72

... More
g) Chajjas

18.02

19876

1103.02

... More
1st Floor Column & Beam

11.52

177083

15371.87

... More
a) Round Lintel

2.37

25497

10758.27

... More
b) R.C.C. Stair case

1.57

24030

15305.76

... More
c) Roof Slabs

9.8

123035

12554.64

... More
d) Chajjas

18.02

22639

1256.34

... More
Supplying M.S./HYSD/Tor steel reinforcement of required diameter of approved quality including Labour charges for cutting, bending, binding and tying the grills and placing in position including cost, conveyance & taxes of reinforcements confirming to ISI standard and binding wire 18 to 20 gauge and as per drawing, design etc. complete as per the direction of Engineer-in-Charge. Ground Floor

48.69

448160

9204.36

... More
1st Floor

31.29

288798

9229.74

... More
9" thick Brick work with Fly AshBricks in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 kg/cm2 immersing the bricks in water not less than six hours before use in masonary including watering and curing for required period with all cost conveyance, royality, taxes of all materials etc. complete as per the direction of Engineer-in-Charge. Ground Floor

31.07

165155

5315.6

... More
1st Floor

42.46

237792

5600.4

... More
Fixing glazed floor tiles(Ceramic), in floors, treads, steps, landings on 25mm thick bed of C.M (1:1) jointed with neat cement slurry mixed with pigaments to match the shades including cost of glazed tiles of size 0.3m x 0.3m with cost conveyance, royality, taxes of all materials, labour etc. complete as per the direction of Engineer-in-Charge. Ground Floor

4.95

5550

1121.4

... More
1st Floor

4.95

5662

1144

... More
Fixing glazed wall tiles(Ceramic), in dados,rise, walls etc on 12mm thick bed of cement mortar (1:3) jointed with neat cement slurry mixed with pigaments to match the shades including cost of glazed tiles of size 0.2m x 0.3m with cost conveyance, royality, taxes of all materials, labour etc. complete as per the direction of Engineer-in-Charge. Ground Floor

11.16

13014

1166.2

... More
1st Floor

11.16

13366

1197.7

... More
16 mm thick cement plaster (1:6) over brick work including racking out joints finishing smooth with proper plumb and line watering curing for seven days with cost, conveyance, royality taxes of all materials, labour, T & P required for the work etc. Complete as per the direction of Engineer-in-Charge. Ground Floor

204.16

45241

221.6

... More
1st Floor

228.95

51948

226.9

... More
12 mm thick cement plaster (1:6) over brick work including racking out joints finishing smooth with proper plumb and line watering curing for seven days with cost, conveyance, royality taxes of all materials, labour, T & P required for the work etc. Complete as per the direction of Engineer-in-Charge. Ground Floor

183.8

28727

156.3

... More
1st Floor

228.95

36586

159.8

... More
6 mm thick cement plaster (1:4) over R.C.C works including deep chiping , finished smooth with proper thickness, watering, curing for required days with cost conveyance, royality, taxes of all materials, labour etc. complete as per the direction of Engineer-in-Charge. Ground Floor

66.65

11303

169.6

... More
1st Floor

73.79

12817

173.7

... More
2.5 cm thick A.S. Flooring using 12 mm size black crusher broken hard granite chips in C.C. (1:2:4) with punning, finished smooth with proper slope and thickness, watering, curing for required days with cost conveyance, royality, taxes of all materials labour etc. complete as per the direction of Engineer-in-Charge. Ground Floor

68.56

22818

332.82

... More
1st Floor

74.59

25633

343.66

... More
Providing, fitting and fixing of M.S panelled doors double leaved shutters with M.S frames made out up the following materials conforming to relevant ISS, ISI frames:- 35 x 35 x 6mm M.S. Angles, shutter style:- Top & Bottom rall 25 x 25 x 3mm M.S Angle, door panel:-1mm CR Sheet. Panel stiffener covering width of each leaf:- 19.50mm, M.S.Flat 3 Nos. on each leaf. Hinges size:- 100mm 6 Nos.(3Nos of each side) but out as per ISS. Hold fast:- 35 x 35 x 6mm M.S Angle 175mm lenght bifurcated at the tip 3 nos of each side: Handle:19mm M.S Flat 4 nos. fabricated. Aldrop:- 2 nos. bought out as per ISS etc. complete as per the direction of Engineer-in-Charge.(EPM rate) Ground Floor

485.1

41233

85

... More
1st Floor

562.28

47793

85

... More
Providing, fitting and fixing of M.S panelled windows double leaved shutters with M.S frames and grills made out up the following materials conforming to relevant ISS, ISI frames:- 35 x 35 x 6mm M.S. Angles, shutter style:- Top & Bottom rall 25 x 25 x 3mm M.S Angle, door panel:-1mm CR Sheet. Panel stiffener covering width of each leaf:- 19.50mm, M.S.Flat 2 Nos. on each leaf. Hinges size:- 100mm 4 Nos.(2Nos of each side) but out as per ISS. Hold fast:- 35 x 35 x 6mm M.S Angle 100mm lenght bifurcated at the tip 2 nos of each side: Handle:19.5mm M.S Flat 2 nos. fabricated (inside). Tower bolt:- 4 nos. bought out as per ISS, Grills -10mm M.S Squar bar @ 100mm spacing on both side etc. complete as per the direction of Engineer-in-Charge.(EPM rate)

1099.2

93432

85

... More
1st Floor

1593.2

135422

85

... More
2.5cm thick grading concrete in C.C. (1:2:2) using 10mm & down graded crusher broken hard granite chips for roof making proper slope as per requirement on roof including the cost of all labour materials, leak proofing chemicals sico or equivalent as per ISI Code etc. complete as per the direction of Engineer-in-Charge. 1st Floor

70.13

24393

347.83

... More
16 mm thick cement plaster (1:6) over brickwork with cement punning for skirting and dadoes, finished smooth with proper thickness, watering, curing for required days with cost conveyance, royality, taxes of all materials, labour etc. complete as per the direction of Engineer-in-Charge. Ground Floor

35.46

8446

238.2

... More
Distempering two coats to walls with distemper of approved shade to give an even shade including 2 coat of white washing, cost conveyance, royality taxes of all materials, labour, T & P required for the work etc. complete and as per direction of Engineer-in-charge, including the cost of all labour materials etc. complete Ground Floor

270.81

37100

137

... More
1st Floor

302.73

42442

140.2

... More
Painting two coat to wall surface with weather paint of approved shade to give an even surface including including all cost of materials, scaffolding, labour, watering & curing T&P etc complete as per direction of Engineer-in-charge. Ground Floor

183.8

26798

145.8

... More
1st Floor

228.95

34388

150.2

... More
Painting two coats of Asian/Burger or equivalent synthetic enamel paints over a coat of primer to Iron work after smoothening the surface by sand papering and filling the neet and holes with best quality of putty with cost, conveyanc, royality, taxes of all materials labours etc. complete as per the direction of Engineer-in-Charge. Ground Floor

69.48

14500

208.7

... More
1st Floor

76.62

16396

214



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.