Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Scheduled Tribes And Scheduled Castes Development Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date5 Jul 2024
Closing Date19 Jul 2024
Tender Amount₹ 79,24,849 
Notes
Download

Costs

Summary

Construction Of Up-graded Kgbv Boys Hostel Building At Goyalmara Nodal Up School Under Khunta Block

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Column Base Ground Floor

29.07

198763

6837.4

... More
Grade Beam Ground Floor

18.34

140464

7658.9

... More
Lintel Ground Floor

5.67

78791

13896.2

... More
Lintel First Floor

3.84

59411

15471.7

... More
65mm thcik Chajja Ground Floor

21.08

24583

1166.2

... More
Chajja First Floor

12.6

16645

1321.1

... More
37.50mm thcik Shelves Ground Floor

4.79

4731

987.8

... More
Stair Case Ground Floor

2.87

41931

14610.2

... More
Stair Case First Floor

2.84

46372

16328.5

... More
Column S/S & Beam Ground Floor

26.1

382652

14661

... More
Column S/S & Beam First Floor

16.89

276818

16389.5

... More
Column S/S & Beam Second Floor

2.31

42640

18459.1

... More
Roof Slab Ground Floor

40.48

536542

13254.5

... More
Roof Slab First Floor

28.06

412526

14701.6

... More
Roof Slab Second Floor

3.7

60804

16433.6

... More
Supplying fitting and placing uncoated HYSD bar reinforcement as per drawing and techinical specification ans tying the grills placing in position required for R.C.C. work including cost of binding wire carriage roylty and all other charges payble to the Govt. of all materials labour T&P required for the work etc. complete as per direction of Eng.-In-Charge (SAIL/TISCON Rod to be utilised)

-

-

-

... More
Ground Foor

142.52

1244313

8730.8

... More
First Floor

65.96

577605

8756.9

... More
Second Floor

6.1

53584

8784.3

... More
Fly Ash Brick masonry in C.M. (1:6) in Foundation & Plinth, bricks having crushing strength not less than 35 g/cm2 using after immersing six hours in water before use including splays cutting circular moulding chafering corbelling and similar such type of work with cost conveyance royalty taxes of all materials and cost of all labou etc. complete as per specification and direction of the Eng.-in-charge.

-

-

-

... More
Ground Foor

18.8

90093

4792.2

... More
Fly Ash Brick masonry in C.M. (1:6) in Superstructure, bricks having crushing strength not less than 35 g/cm2 using after immersing six hours in water before use including splays cutting circular moulding chafering corbelling and similar such type of work with cost conveyance royalty taxes of all materials and cost of all labou etc. complete as per specification and direction of the Eng.-in-charge.

-

-

-

... More
Ground Foor

86.6

418321

4830.5

... More
First Floor

63.89

327340

5123.5

... More
Second Floor

19.13

104459

5460.5

... More
Filling in foundation and plinth with sand including watering ramming, cost, conveyance, royalties and all taxes of materials and cost of labour with T&P required for the work etc. complete (measurement will be taken on finished section only etc. complete as directed by the Eng.-in-charge (Ground Floor)

246.87

213665

865.5

... More
12mm. Thick cement plaster in C.M. (1:6) finished smooth to in side brick walls including watering and curing with cost conveyance, royality and taxes of all materials and cost of all labour, T&P required for the work etc. complete as per specification and direction of the Eng.-in-charge

-

-

-

... More
Ground Foor

546.1

86447

158.3

... More
First Floor

255.3

41945

164.3

... More
Second Floor

145.16

24778

170.7

... More
16mm. Thick cement plaster in C.M. (1:6) finished smooth to out side brick walls including watering and curing with cost conveyance, royality and taxes of all materials and cost of all labour, T&P required for the work etc. complete as per specification and direction of the Eng.-in-charge.

-

-

-

... More
Ground Foor

546.1

121124

221.8

... More
First Floor

255.3

57978

227.1

... More
Second Floor

39.51

9190

232.6

... More
6mm. Thick cement plaster in C.M. (1:4) finished smooth to C.C. surface including watering and curing with cost conveyance, royality and taxes of all materials and cost of all labour, T&P required for the work etc. complete as per specification and direction of the Eng.-in-charge.

-

-

-

... More
Ground Foor

360.26

61568

170.9

... More
First Floor

250.35

43836

175.1

... More
Second Floor

21.69

3891

179.4

... More
Providing fitting and fixing Vetrified tile (Plain / Ivory) in floor of size 600x600mm. of approved make over 20mm. Thick cement bed in C.M. (1:3) jointed with neat cement slury mixed with pigment to match the shade including rubbing & polishing etc. with all cost , carriage, royality & taxes of materials with cost of all labour, T&P required for the work etc. complete as per specification and direction of the Eng.-in-charge.

-

-

-

... More
Ground Foor

230.44

251225

1090.2

... More
First Floor

140.31

154467

1100.9

... More
Providing fitting and fixing Industrial vetrified tile in floor of size 300x300mm. of approved make over 20mm. Thick cement bed in C.M. (1:3) jointed with neat cement slury mixed with pigment to match the shade including rubbing & polishing etc. with all cost , carriage, royality & taxes of materials with cost of all labour, T&P required for the work etc. complete as per specification and direction of the Eng.-in-charge.

-

-

-

... More
Ground Foor

36.7

36443

993

... More
First Floor

12.83

12877

1003.7

... More
Providing fitting and fixing Ceramic floor tile of size 300mm x 300mm in wall on 20mm thick bed in CM (1:3) jointed with neat cement slurry mixed with pigment watering and curring including cost, conveyance, royalty, taxes of all matrials and cost of all labour T&P required for the work etc. complete as per direction of Eng.-In-Charge.

-

-

-

... More
Ground Foor

52.61

44886

853.2

... More
First Floor

52.61

45444

863.8

... More
Providing fitting and fixing Vetrified tile (Plain / Ivory) in wall (Dado) of size 600x600mm. of approved make over 12mm. Thick cement bed in C.M. (1:3) jointed with neat cement slury mixed with pigment to match the shade including rubbing & polishing etc. with all cost , carriage, royality & taxes of materials with cost of all labour, T&P required for the work etc. complete as per specification and direction of the Eng.-in-charge.

-

-

-

... More
Ground Foor

22.43

27994

1248.1

... More
First Floor

10.85

13153

1212.3

... More
Providing fitting and fixing Ceramic Glazed tile of size 300mm x 200mm in wall (Dado) on 12mm thick bed in CM (1:3) jointed with neat cement slurry mixed with pigment watering and curring including cost, conveyance, royalty, taxes of all matrials and cost of all labour T&P required for the work etc. complete as per direction of Eng.-In-Charge.

-

-

-

... More
Ground Foor

92.43

84166

910.6

... More
First Floor

92.43

85664

926.8

... More
Providing fitting and fixing Industrial Vetrified tile in wall (Dado) of size 300x300mm. of approved make over 12mm. Thick cement bed in C.M. (1:3) jointed with neat cement slury mixed with pigment to match the shade including rubbing & polishing etc. with all cost , carriage, royality & taxes of materials with cost of all labour, T&P required for the work etc. complete as per specification and direction of the Eng.-in-charge.

-

-

-

... More
Ground Foor

11.43

12647

1106.5

... More
First Floor

6.64

7452

1122.3

... More
Supplying fitting and fixing of stainless steel of 304 grade in hand railing using 50mm dia. Of 2mm thick circular pipe with balustrade of size 32mmx32mmx2mm @ 0.90mtr C/C and stainless square pipe of size 32mmx32mmx2mm in 3 rows in staircase as per approved design and specification etc all completed including cost of all materials taxes, labour, T&P etc. required for the work as per direction of Eng.-In-Charge.

-

-

-

... More
Ground Foor

104.79

28240

269.5

... More
First Floor

104.79

28240

269.5

... More
Providing, supplying, fitting & fixing G.I. door, window with grill, Grills, G.I. Gate & Collapsible Gate made out of M.S. Angle frame, M.S. flat, sheet etc. of approved design including all cost, carriage & taxes of materials with required for the work etc. complete as per specification and direction of the Eng.-in-charge.

-

-

-

... More
Ground Foor

2077.13

186941

90

... More
First Floor

1186.53

106787

90

... More
Second Floor

98.04

8823

90

... More
Labour Charges for fitting and fixing G.I. Door, window, Grill gate, ventilator in position with cement concrete (1:2:4) using 12mm size black hard granite chips including cost of all materials, labour but excluding cost of door, window etc. complete as per specification and direction of the Eng.-in-charge.

-

-

-

... More
Ground Foor

51.18

4720

92.23

... More
First Floor

31.17

2874

92.23

... More
Second Floor

2.58

237

92.23

... More
Painting 2 coats to G.I. / M.S. Door, Window with any approved shade over a coat of Red Oxide Primet after cleaning surface free from dust, grease, oil sand papering with cost, conveyance taxes of all materials and cost of all labour etc. complete as per specification and direction of the Eng.-in-charge.

-

-

-

... More
Ground Foor

133.63

29077

217.6

... More
First Floor

75.65

16877

223.1

... More
Second Floor

5.81

1328

228.7

... More
Distempering 2 coats to plaster surface of wall with any approved shade over a coat of water bound Cement Primer after cleaning surface free from dust and extraneous materials with cost conveyance, taxes of all materials and cost of all labour etc. complete as per specification and direction of the Eng.-in-charge.

-

-

-

... More
Ground Foor

1219.05

169813

139.3

... More
First Floor

405.95

57847

142.5

... More
Second Floor

61.2

8929

145.9

... More
Wall painting 2 coats with weather coat to outside plaster surface of wall with any approved shade over a coat of water bound cement primer after cleaning surface free from dust and extraneous materials with cost conveyance taxes of all materials and cost of all labour etc. all complete as per specification and direction of the Eng.-in-charge.

-

-

-

... More
Ground Foor

325.83

48581

149.1

... More
First Floor

245.08

37889

154.6

... More
Second Floor

145.16

23292

160.46

... More
Supplying, fitting & fixing of Granite Up to 0.10 Sqm. (10 mm thick) series tiles in floorsof approved make confirming to IS: 13755 laid on 20 mm thick cement mortar (1/4) (1 cement : 4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work etc. all complete as per specification and direction of the Eng.-in-charge.

-

-

-

... More
Ground Foor

5.59

9520

1703.2

... More
Providing supplying fitting and fixing glass louvers in position in wooden / steel window fram using 5mm thck black glass in position including cost of all materials labour etc. all complete as per specification and direction of the Eng.-in-charge.

-

-

-

... More
Ground Foor

4.23

3370

796.88

... More
First Floor

2.25

1792

796.88

... More
Providing, fitting and fixing of Al door with anodized Al. door section of 9202 as vertical member, 9201 as top and 9200 as middle and bottom member with frame section No. 9221 and tapered clip no. 4660 and the frame to be completed by means of jointing angle no. 1855 including all cost of labour, T&P, hire charges of drilling machine, labour charges etc. all complete as per specification and direction of the Eng.-in-charge.

-

-

-

... More
Ground Foor

157.52

79264

503.2

... More
First Floor

157.52

79264

503.2

... More
2.5cm thick grading concrete with C.C. (1:2:4) using 6mm down graded black hard granite chips watering curing including cost conveyance royalty taxes of all materials and cost of all labour etc. all complete as per specification and direction of the Eng.-in-charge.

-

-

-

... More
Ground Foor

97.31

33669

346

... More
First Floor

224.48

84606

376.9



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.