Scheduled Tribes And Scheduled Castes Development Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Scheduled Tribes And Scheduled Castes Development Department Tender
Eprocure
Opening Date16 Nov 2021
Closing Date23 Nov 2021
Tender Amount₹ 11,67,036
Costs
EMD
Refer DocumentsDocument Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_STSCD_72642_6Tender No
04/ ITDA BNIOF 2021-22Tender Authority
Scheduled Tribes And Scheduled Castes Development Department ViewPurchaser Address
-Website
http://http://stscodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
CC (1:3:6) using 40mm size and down graded crusher borken HG stone metal free from weathered surface of approved qualifty from approved quarry in foundation and plinth inculding laying concrere in layers with due compaction, watering and curing including cost, conveyance, royalty and taxes of all materials with all lead, lifts and delifts, T & P etc required for completion of the work in all respect as per direction of the Engineer-in-charge
16.51
-
5100.9
... More
Brick work with Fly ash Bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Foundation and Plinth including watering curing, cost of carriage and royalty of all materials, cost of all labour, etc complete.
27.06
-
4561.4
... More
Brick work with Fly ash Bricks 23cm x 11cm x 8cm size having crushing strength betwen 100 Kg/CM2 TP 149Kg/cm2 (1:6 in superstructure including cost, converance, royalty, taxes of all materials, labour T & P etc including cost, converance, royalty taxes of all materials, labour T & P required for the work complete and as per the direction of the Engineer-in-charge..
12.06
-
4594.8
... More
Providing Reinforced cement concrete work of M-20 grade with 20mm and down grade black hard granite crusher broken chips including cost of all materials labours ,T&P, carriage, royalti, taxes, etc. with watering and curing , all complete. (Item-4, AR-2006)
-
-
-
... More
Coloumn base & Footing
8.06
-
5414
... More
Plinth Bend
3.4
-
5764.7
... More
Column & Beam
7.23
-
11045
... More
Lintel Bend
1.52
-
8896.3
... More
Roof Slab
14.5
-
9476.4
... More
Providing HYSD. reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge and cost and carriage of steel. etc. complete. (A.R.-2006, Page No - 52, Item No. - 9)
37.52
-
7909.7
... More
Supplying of MS grill gate, MS angle chowkhat of approved specification for doors and window welded with MS sheet shutters of 18 to 20 gauge thick openable and electrically welded with all necessary fitting including cost of all materials, labour, T & P, transportation to worksite etc all complete in all respect as per direction of the Engineer-in-charge
-
-
-
... More
Door with double leaved shutter
486.5
-
70.2
... More
M.S. Window Grill
176.25
-
69
... More
Labour charges for fitting and fixing of door and window shutter with all comlplete work as per the direction of the Engineer-in-Charge
13.38
-
78.3
... More
12mm thick C.P.(1:6) on brick masonary to the smooth surface including watering, curing, cost, carriage, royalty of all materials, cost of all labour, etc complete as per the direction of E.I.C. Ref :-A/R - 2006 ,P- 103, Item No - 4
156.36
-
141.6
... More
16mm thick C.P. (1:6) over brick masonary to the smooth surface including watering, curing cost, carriage, royalty, and taxes of all materials, cost of all labour, etc complete as per the direction of E.I.C. Ref :-A/R - 2006 ,P- 105, Item No - 14
123.91
-
200.9
... More
6 mm thick C.P. (1:4) to RCC surfaces finished smooth including closed deep chiping and slury treatment , watering, curing cost, carriage & royalty of all materials, cost of all labour, etc complete as per the direction of E.I.C. Ref(A/R-2006,P-103,Item no-27)
119.79
-
154.7
... More
Fixing vitrified tiles in floor, treads on steps and landing on 25 mm thick bed of cement mortar 1:1 (1 Cement:1 Sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing cost converance, royalty, taxes of all materials labour, T & P required for the work complete and as per the direction of the Engineer-in-Charge
90.03
-
865.1
... More
Fixing vitrified tile in dado, skiring and risers of steps on 12mm thick cement plaster (1:3) joint with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing cost converance, royalty, taxes of all materials labour, T & P required for the work complete and as per the direction of the Engineer-in-C
7.31
-
960.4
... More
Painting two coats with approved Enamel paints of approved colour, shade over a coat of primer including sand papering, polishing the surface, cost, conveyances of all materials and cost of all labour etc, complete as per specification & direction of En
33.58
-
191.1
... More
Finishing to walls with two coats weather coat over putty work with one coat primer of approved brand and approved colour and shade including cleaning the surface with cost, converance, royalty taaxes of all materials labour T & P and scaffolding as required for the work and as per speficiation and direction of Engineer-in-Charge.
130.56
-
224.7
... More
Wall painting two coats with plastic emulsion paint over putty work and once coat primer with cost, coverance, royalty taxes of all materials labour T & P and scaffolding as required for the work and as per direction of Engineer-in-charge
136.17
-
231.2
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements